| description | Use when an architect is turning a Moe task into an implementation plan via moe.submit_plan. Provides the canonical 8-phase template (plan, explore, tests, minimum impl, verify, document, adversarial review, QA loop), rules for when to skip phases on trivial tasks, and where the verification gate belongs — once at the end of a task, and at full scope only on the epic's final task. |
| when_to_use | After moe.get_context returns a PLANNING task, before drafting implementationPlan.steps for moe.submit_plan. |
| allowed-tools | Read, Grep, Glob, WebFetch |
Moe Planning — 8-Phase Plan Template
Your job: turn the task in front of you into an implementation plan that a worker can execute without guessing. Use the 8 phases below as the default skeleton for the steps you submit via moe.submit_plan. Skip phases that genuinely don't apply — but skip consciously, not by accident.
Where the gate goes — read this before drafting steps
Verification is a real cost. Paying it on every step of every task is how a 12-task epic turns into work that is 80% ceremony. Concentrate it instead:
- Inside a task: the gate is at the end, not on every step. A step is implement the thing + write the tests for the thing it changed. There is exactly one adversarial self-review step, and it is the last one. The regression run happens once, before
moe.complete_task. Never emit a "verify" / "review" / "run the suite" step after each implementation step.
- Inside an epic: the gate is on the last task, not on every task. Mid-epic tasks build their slice, prove that slice with focused tests, and hand off. The epic's final task is where the full-system check lives: full suite, cross-package integration, docs sweep, adversarial pass over the whole epic diff.
So when you decompose a big epic, end it with an explicit integration-and-hardening task (moe.create_task with the highest order). That task owns the epic's end-to-end verification, its documentation, and its "would I be embarrassed if this shipped" pass. Everything before it stays lean and moves. Decomposing an epic is its own pass with its own skill — moe-epic-breakdown; this skill starts once the tasks exist and you're planning one of them.
"Lean" does not mean sloppy. Mid-epic tasks still write real tests for their own behavior, still handle errors, still get reviewed by QA. Lean means their tests are scoped to what they changed and their verification command is the targeted suite, not the whole system.
Verification depth by epic position
| Task position | Tests to plan | Verification step to plan |
|---|
| Mid-epic (any task that isn't the last) | Focused unit tests for the behavior this task changes | The one package's suite, or the single test file — name it, keep it narrow |
| Epic-final, or a standalone task with no epic siblings | The above, plus integration / end-to-end covering the epic's whole flow | Full regression across every affected package + adversarial review of the epic diff |
| Any position, if the task touches shared types, schema, wire protocol, or migrations | Whatever the change needs | Full regression regardless of position — these break things outside the task's blast radius |
If you can't tell where the task sits, moe.list_tasks {epicId} and compare order against the siblings. No epic siblings → treat it as epic-final.
The 8 phases
Phase 1 — Plan before you touch anything
Read task.context, task.acceptanceCriteria, the linked epic rails, and any KNOWN_ISSUES.md. Build a structured todo list before referencing a single line of code. Size the work: how many files? Cross-cutting? Architectural impact? Use the answer to decide which later phases apply.
Phase 2 — Explore before you assume
Don't reference a function, model, method, relationship, or constant you haven't grepped for. Hallucinated user.clientProfile.accounts-style chains are the #1 source of plan-time errors. If the skill explore-before-assume is available, invoke it now.
Phase 3 — Plan tests first
For every behavior change, name the test that proves it. Use mutation-resistant assertions: assertEquals('completed', $r->status) not assert($r). Tests that pass when code does nothing are worse than no tests. If the skill test-driven-development is available, reference it for the worker.
Scope the tests to this task's behavior. Don't plan end-to-end or full-system tests on a mid-epic task — those belong to the epic's final task, where the whole flow actually exists to be tested.
Phase 4 — Plan the minimum implementation
Each step does one thing. No clever abstractions. No "while we're here." Scope creep is a bug that looks like progress.
Phase 5 — Plan the regression check, sized to position
Name the suite the worker runs once, before moe.complete_task — and size it per the table above. Mid-epic: the narrow suite covering this task's slice. Epic-final, standalone, or shared-surface change: the broader suite, named explicitly (which packages, which command). One verification step per task, never one per implementation step.
Phase 6 — Plan the documentation
Inline comments only where the why is non-obvious. Changelog entry if user-visible. Update docs/ if any contract changes. On a big epic, hold the docs sweep for the final task rather than re-editing the same doc from every task in the epic — unless this task alone changes a contract someone else is about to build against.
Phase 7 — Plan the adversarial review — one, at the end
Every plan ends with exactly one explicit "self-review" step, and it is the final step of the task. Not one per implementation step. On a mid-epic task it is scoped to this task's own diff; on the epic's final task it sweeps the whole epic diff. The checklist:
- What if this runs twice concurrently?
- What if input is null / empty / negative / huge?
- What assumptions am I making that could be wrong?
- Would I be embarrassed if this broke in prod?
Phase 8 — Plan the QA loop
The worker's job ends at moe.complete_task. The QA agent reviews and may call moe.qa_reject with rejectionDetails. Your plan must hold up under that scrutiny — surface the edge cases and failure modes in the plan itself so they don't show up as rejection notes.
How phases map to plan steps
One step per phase is a fine starting point for non-trivial work. For larger tasks, Phase 4 (minimum implementation) usually expands into multiple steps — one per logical concern. Only Phase 4 expands. Phases 5 and 7 are one step each, at the end, no matter how many implementation steps precede them. Always:
- Set
affectedFiles tight per step.
- Map every Definition-of-Done item to at least one step.
- State non-obvious design choices in the step
description so the worker doesn't re-derive them.
When to skip phases
Skip aggressively for genuinely trivial work. A typo fix doesn't need 8 steps.
| Task type | Default skeleton |
|---|
| Doc-only / typo / config tweak | Phases 1, 4, 6 |
| Bug fix, narrow scope, has repro | Phases 1, 3, 4, 5, 7 |
| Mid-epic slice of a larger epic | Phases 1, 2, 3, 4, plus a narrow 5 — the epic's final task carries full-scope 5, 6, and 7 |
| New feature, single subsystem (no epic siblings) | Phases 1, 2, 3, 4, 5, 6, 7 |
| Epic-final integration / hardening task | All 8, with 5 and 7 at full-system scope across the epic diff |
| Cross-cutting refactor / migration | All 8 phases, multiple steps in 4 |
Reopened (reopenCount > 0) | All 8, plus a Phase 0 "address rejectionDetails" step |
Production concerns to bake in (across all phases)
- Errors: every IO / external call has a real handling path
- Resource cleanup: file handles, sockets, listeners closed on every exit path
- Cross-platform: paths, scripts, line endings (this repo ships on Win/Mac/Linux)
- Security: no command injection, no path traversal, no secrets in logs
- Performance: no obvious O(n²) on growing lists, no synchronous IO in hot loops
- Backwards-compat / migration / feature-flag if risky
When to bail
If the task conflicts with an existing rail, requires missing prerequisites, or is ambiguous in a way only a human can resolve — call moe.report_blocked instead of submitting a bad plan.