Sprint Health Report
You are generating a sprint health report. Follow the full pipeline below.
Reference files (read these in Step 1a before querying Jira):
.claude/skills/sprint-report/references/jira-fields.md — custom field IDs and discovery
.claude/skills/sprint-report/references/jira-query-patterns.md — JQL patterns and data volume guidance
Step 0: Discovery & Proposal
Before asking the user any questions, discover what you can automatically.
0a. Interpret the User Request
The user may provide any combination of: project key, component name, board
name, team name, sprint name/number, or just a vague reference like "my
sprint." Extract whatever identifiers are present.
Search directly for what the user gave you. If they said "AgentOps",
call jira_get_agile_boards(board_name="AgentOps"). Do NOT call
jira_get_all_projects or enumerate projects — go straight to the
identifier the user provided.
0b. Discover the Sprint (Jira MCP)
If Jira MCP is available:
- Find the board:
jira_get_agile_boards(project_key=X) or
jira_get_agile_boards(board_name=X)
- If the user provided a component name, search boards by the project
containing that component
- Find the active sprint:
jira_get_sprints_from_board(board_id=BOARD_ID, state="active")
- If multiple active sprints: include all in proposal and ask which one
- If none: offer the most recently closed sprint
- Get a rough item count (for the proposal only):
jira_get_sprint_issues(sprint_id=SPRINT_ID, fields="summary,status,assignee,components,customfield_10001")
- Count total items and unique assignees from the response
- Do NOT fetch story points, description, or other heavy fields yet
This is a lightweight preview. Full field discovery and data ingestion happen
in Step 1 after the user approves the plan.
0c. Detect Mixed-Team Sprints
Before proposing the plan, check if the sprint contains work from multiple
teams. Shared boards in large organizations often include release-wide items.
Indicators of a mixed-team sprint:
- Items span >2 Jira projects
-
15 unique assignees
- Multiple distinct values in Team field (
customfield_10001)
- High component diversity (>5 components)
If detected, include filtering options in the proposal:
I found [Sprint Name] with [N] items, but they span multiple teams/projects.
Filtering options:
1. Team = "[Team Name]" → [X] items
2. Component contains "[Component]" → [Y] items
3. All items (no filter) → [N] items
Which scope should I analyze? (Recommend: option 1 for team health)
Apply the chosen filter in Step 1b.
0d. Propose a Plan
Present a short proposal:
I found [Sprint Name] ([state], [start] – [end]).
Proposed plan:
- Analyze [N] items across [M] team members
- [Include/Skip] historical comparison ([K] closed sprints available)
- Generate HTML report for all audiences
- Output to artifacts/sprint-report/
Approve to proceed, or tell me what to change.
Set these defaults (user can override any of them):
| Setting | Default | Override Example |
|---|
| Output format | HTML (template exists) | "Make it Markdown" |
| Audience | All | "Just for scrum master" |
| Historical trends | Include if 3+ closed sprints available | "Skip trends" |
| Sprint | Current active sprint | "Use Sprint 2 instead" |
Wait for user approval, then immediately continue to Step 1. Any
affirmative response ("yes", "approve", "looks good", "proceed", "continue")
means go. If the user requests changes, adjust the plan and re-propose. Do
not stall or ask for further confirmation after receiving approval.
0e. CSV or Other Source
If Jira MCP is not available, or the user provides a CSV:
- Ask only what you cannot derive: data source path, team name, sprint dates
- Still propose defaults for everything else
Step 1: Ingest Data
The user has approved the plan. Now fetch the full data set.
1a. Discover Custom Fields
Read .claude/skills/sprint-report/references/jira-fields.md for known field
IDs. If the Jira instance is redhat.atlassian.net, use the confirmed IDs in
the "Known Fields" section — no discovery needed.
For other instances, confirm the correct IDs:
- Use
jira_search_fields to search for "story point" and "sprint"
- Or fetch a single issue with all fields and inspect the keys:
jira_search("project = X ORDER BY created DESC", maxResults=1, fields="*all")
- Record the story points field ID and sprint field ID for subsequent queries
1b. Query Sprint Issues (Full Fetch)
Now re-fetch the sprint data with the complete field list. The lightweight
query from Step 0b was just for the proposal — this is the real data pull.
See .claude/skills/sprint-report/references/jira-query-patterns.md for
details.
jira_get_sprint_issues(
sprint_id=SPRINT_ID,
fields="summary,status,issuetype,priority,assignee,created,updated,resolutiondate,components,description,customfield_XXXXX,customfield_YYYYY"
)
Replace customfield_XXXXX and customfield_YYYYY with the IDs from 1a.
If a team filter was chosen in Step 0c, apply it after fetching: keep only
items where the Team field, component, or assignee matches the filter.
DO NOT use fields=*all — this returns 100+ custom fields per issue and
can produce 500k+ characters, exceeding tool output limits.
Handling Large Responses
For sprints with >20 items, the response will likely exceed tool output limits
(~25k tokens) and be auto-saved to a file. The error message contains the
file path.
Parse the saved file with bash + jq:
jq '.result | fromjson | .issues | map({
key, summary,
status: .status.name,
issuetype: (.issuetype.name // "Unknown"),
priority: (.priority.name // "Undefined"),
assignee: (.assignee.display_name // "Unassigned"),
story_points: (.customfield_10028.value // 0),
sprint: [.customfield_10020.value[]? | {name, state}],
created, updated, resolutiondate,
components: [.components[]?.name],
description: (.description // "")
})' /path/to/tool-result.txt > /tmp/sprint_data.json
Then read /tmp/sprint_data.json with the Read tool. Adjust the
customfield_10028 key to match the story points field ID from Step 1a.
1c. Handle Mixed Sprints
If the query returns items from multiple sprints (carryover):
- Filter to current sprint ID in post-processing
- Record carryover items separately (count them as a metric)
- Include carryover items in the appendix, clearly marked
1d. CSV Ingestion
Parse rows and map columns to the standard fields: key, type, status,
priority, assignee, story points, created date, resolved date, sprint, AC.
1e. Assess Data Quality
After ingesting data, compute coverage:
| Check | How to Measure |
|---|
| Story points | % of items with a non-null, non-zero points field |
| Issue type | % of items with non-null issuetype |
| Resolution dates | % of items with resolutiondate set |
| Acceptance criteria | % of items with AC patterns in description |
| Priority | % of items with priority set (not "Undefined") |
| Assignee | % of items with an assignee |
Minimum requirements:
- Sprint has >0 items (if 0: stop and tell the user)
- Sprint has valid start/end dates (if missing: warn but continue)
Set fallback metrics when data is sparse:
| Metric | Ideal | Fallback | Caveat to Display |
|---|
| Delivery Rate | Points completed / committed | Items completed / committed | "Item-based (no story points)" |
| Velocity | Avg points per sprint | Avg items per sprint | "Item-based velocity" |
| Cycle Time | Created → resolved (days) | Days in current status | "Estimated from status duration" |
| Story Sizing | Point distribution | Item type distribution | "Cannot analyze sizing without estimates" |
| Priority Analysis | Priority distribution | Skip dimension | "Priority data unavailable (X% Undefined)" |
| Issue Type Analysis | Type breakdown | Treat all as "Item" | "Issue type data unavailable" |
If 2+ critical gaps exist (no points + no priorities + no AC + <3 days
elapsed), warn the user:
Data quality is low — the report will have limited insights. Proceed
anyway, or wait until items are estimated?
If proceeding, add a prominent data quality callout at the top of the
Executive Summary.
1f. Historical Data (If Approved in Step 0)
Query the last 3–5 closed sprints from the same board. For each, retrieve
issues the same way as the active sprint and calculate: velocity, completion
rate, carryover count. See
.claude/skills/sprint-report/references/jira-query-patterns.md for queries.
If fewer than 3 closed sprints exist, skip trends and note it in the report.
1g. Identify Team
- Extract unique assignees from sprint items
- Sort alphabetically by last name
- Format: "F. LastName" (e.g., "C. Zaccaria")
- If >10 members: show first 8 + "and N more"
Step 2: Compute Metrics (All 8 Dimensions)
Calculate every dimension — do not skip any even if data is sparse. Note when
data is insufficient rather than omitting the dimension.
| Dimension | Key Metrics |
|---|
| Commitment Reliability | delivery rate (points or items completed / committed), item completion rate |
| Scope Stability | items added/removed mid-sprint, scope change %, sprint goal alignment |
| Flow Efficiency | cycle time, WIP count, status distribution |
| Story Sizing | point distribution, oversized items (>8 pts), unestimated items |
| Work Distribution | load per assignee, concentration risk (>30% = flag), unassigned items |
| Blocker Analysis | flagged items, blocking/blocked relationships, impediment duration |
| Backlog Health | acceptance criteria coverage, priority distribution, definition of ready |
| Delivery Predictability | carryover count, zombie items (>60 days old), aging analysis |
Cycle Time Calculation
Use created → resolutiondate from the sprint issue data. This is
sufficient for sprint health reports.
For deeper analysis on small sprints (<15 items), optionally call
jira_get_issue_dates for the top 5–10 resolved items to get precise
time-in-status breakdowns. Do NOT call it for every item — the API overhead
is not worth it for sprint-level reporting.
Progress Bar Point Calculation
The template requires point breakdowns by status. Calculate:
- Done points: Sum story points where status is Done/Closed/Resolved
- Review/In Progress/New points: Sum story points per status group
- If items lack individual point estimates, distribute remaining points
proportionally by item count per status
- Compute percentages:
status_pct = (status_points / total_points) * 100
Sprint Goal Alignment
If the sprint goal is defined (non-empty):
- Classify each item as aligned/not-aligned based on whether its summary
relates to a keyword or theme in the goal
- Calculate alignment percentage
- If <50%: add observation — "Only X% of items align with stated sprint goal"
- If >80%: add positive signal
Positive Signal Detection
Actively look for what is going well. Find at least 3 positive signals from:
- High AC coverage (>70%)
- Low never-started rate (<15%)
- Even work distribution (no one >30% load)
- No critical blockers
- Sprint goal clearly defined
- Items completed on time
- Low carryover rate (<30%)
- Good priority coverage (>70%)
- WIP within limits (<team size)
- Fast cycle time (<7 days avg)
- No zombie items (all items <60 days old)
- Good sprint goal alignment (>80%)
If <3 found, list whatever exists and note "Limited positive signals this
sprint — opportunity for improvement."
Step 3: Detect Anti-Patterns
Check for each pattern. Only report patterns with supporting data — do not
speculate.
| Anti-Pattern | Trigger |
|---|
| Overcommitment | committed > 2× historical velocity |
| Perpetual carryover | items spanning 3+ sprints |
| Missing Definition of Ready | 0% acceptance criteria coverage |
| Work concentration | one person assigned >30% of items |
| Mid-sprint scope injection | items added after sprint start without descoping |
| Zombie items | any open item >60 days old |
| Item repurposing | summary/description changed mid-sprint (requires changelog) |
| Hidden work | items with no status transitions since added (requires changelog) |
Systematic Zombie Detection
Do not just find the oldest item. Check every open item:
- Calculate
age = today − created_date for all open items
- Filter where
age > 60 days
- If count > 0: list ALL zombie items with key and age
- If count == 0: record as positive signal
Review Bottleneck Check
If >40% of items are in a "Review"-like status:
- Flag as flow bottleneck
- Note that "Review" can mean code review, QA, or stakeholder approval
- Recommend the team investigate which type dominates and consider splitting
the status for visibility
Step 4: Generate Health Rating
Compute a risk score on a 0–10 scale:
| Factor | +3 | +2 | +1 | 0 |
|---|
| Delivery rate | <50% | 50–69% | 70–84% | 85%+ |
| AC coverage | — | <30% | 30–69% | 70%+ |
| Zombie items | — | 3+ | 1–2 | none |
| Never started | — | >30% | 15–30% | <15% |
| Priority gaps | — | — | <30% prioritized | 30%+ |
Rating bands: 0–3 = HEALTHY, 4–6 = MODERATE RISK, 7–10 = HIGH RISK
If using fallback metrics (item-based instead of points-based), note the
reduced confidence in the rating.
Step 5: Produce the Report
Generate artifacts in artifacts/sprint-report/:
{SprintName}_Health_Report.md — full Markdown report
{SprintName}_Health_Report.html — styled HTML with KPI cards, progress bars, coaching notes
Use whichever format(s) the user approved in Step 0. If they said "both,"
produce both.
Report Structure
Every report follows this structure regardless of format:
- Executive Summary — health rating, top 5 numbers, positive signals (minimum 3), data quality note (if applicable)
- KPI Dashboard — delivery rate, WIP count, AC coverage, never-started items, cycle time, carryover
- Dimension Analysis — 8 cards with observations, risks, root causes
- Anti-Pattern Detection — evidence-based pattern cards
- Top 5 Actions for Next Sprint — numbered, actionable
- Coaching Notes — retrospective facilitation, sprint planning, backlog refinement
- Appendix — per-item detail table with status, points, assignee, sprint history
HTML Template (MANDATORY)
Do NOT create HTML from scratch. You MUST use the template.
Read the template at templates/report.html. The file is ~1285 lines — read
it in chunks if needed (e.g., offset=1/limit=500, then offset=501/limit=500,
then offset=1001/limit=285).
- Use the exact CSS, HTML structure, and JavaScript from the template
- Replace all
{{PLACEHOLDER}} markers with computed values
- HTML-escape all Jira-sourced text (issue summaries, descriptions, assignee
names, comments) before interpolation — escape
&, <, >, ", '
- For repeating components (dimension cards, KPI cards, anti-pattern cards,
action cards, coaching cards, observation blocks, appendix rows), replicate
the example pattern for each data item
- The template includes inline HTML comments describing how to repeat patterns
and which CSS classes to use
- Do NOT modify the CSS or JavaScript sections
- Do NOT add features not present in the template (charts, trend graphs, etc.)
- Preserve the sidebar table of contents and all section IDs for scroll-spy
Why this matters: The template contains 753 lines of production CSS,
interactive JavaScript (KPI details, scroll-spy), dark mode, print/PDF
export, and responsive layout. Creating HTML from scratch loses all of this.
Use a Python script to handle placeholder replacement and repeating section
generation — see "Scripting Policy" below.
Placeholder Derivation
Key placeholders and how to derive them:
{{NEXT_SPRINT_NAME}} — increment the sprint number if numeric (Sprint 3 → Sprint 4), else "Next Sprint"
{{TEAM_MEMBERS}} — "F. Last" format, comma-separated, truncate with "..." if >100 chars
{{POSITIVE_SIGNAL}} — repeat <li> for each signal (minimum 3)
{{DELIVERY_RATE_VALUE}} — "X.X%" (item-based if no story points; label accordingly)
{{DELIVERY_RATE_SUB}} — "X of Y items completed" or "X of Y points completed"
- Progress bar widths — use point totals if available, otherwise item counts;
show label only if segment width >10%
{{DONE_PCT}}, {{REVIEW_PCT}}, {{INPROG_PCT}}, {{NEW_PCT}} — percentage widths from progress bar calculation
After rendering, verify no unreplaced placeholders remain:
grep "{{" output.html should return nothing.
Step 6: Changelog Analysis (Optional)
Changelog analysis is optional enrichment. The core report (Steps 1–5) is
complete without it.
When to Include
- Sprint has <20 items (low data volume)
- Team specifically requested deep analysis
- Investigating known process issues (thrashing, reassignment)
When to Skip
- Sprint has >30 items (data volume too high)
- Basic anti-patterns (zombie items, carryover) already detected
- Time-constrained analysis
- First-time runs (get baseline report first)
If Including
Preferred tool: jira_batch_get_changelogs — fetches changelogs for
multiple issue keys in one call.
jira_batch_get_changelogs(issue_keys=["KEY-1", "KEY-2", "KEY-3", ...])
Limit to the top 10–15 highest-risk items (oldest, blocked, carryover).
Fallback (if batch tool is unavailable): jira_search with
key in (KEY-1, KEY-2, ...) and expand=changelog.
What to Extract
| Pattern | What to Look For |
|---|
| Item repurposing | summary or description field changed mid-sprint |
| Reassignment | assignee changed (signals unclear ownership) |
| Status churn | item moved backward (e.g., Review → In Progress) |
| Sprint hopping | Sprint field changed (added/removed mid-sprint) |
| Hidden work | no status transitions since item was added |
If Skipping
Add a note in the report:
Changelog analysis was not performed. Anti-patterns requiring change history
(item repurposing, reassignment churn, status regression) could not be
assessed.
Integrate findings into the report on the first write — do not produce the
report and then rewrite it.
Scripting Policy
- Use Python scripts for data processing that exceeds what tool calls and
inline reasoning can handle: metric computation, template placeholder
replacement, large JSON transformations
- Use bash + jq for simple transforms: extracting fields from tool result
files, filtering, counting
- Do NOT create reusable frameworks, CLI tools, or generalized analyzers
meant for distribution — scripts should be sprint-specific and disposable
- Do NOT implement features the user didn't ask for (dark mode, PDF export, trend charts, etc.)
- Batch tool calls wherever possible (parallel
jira_search calls, not serial)
- Stick to the requested output format(s) — don't produce both unless asked
- After Step 0 approval, execute the full pipeline without stopping between steps
Output
- Report artifacts in
artifacts/sprint-report/
- Present a brief summary of the health rating and top findings inline after
generating the report files