Upgrade Planning
Plan network product upgrades with structured risk assessment and generate production-ready MOPs.
Workflow
Step 1: Gather Requirements
Ask the user for:
- Product — e.g., CUCM, IOS-XE, PAN-OS, FortiOS, Junos
- Current version — e.g., 17.6.3, 12.5 SU7, 10.2.4
- Target version — e.g., 17.9.4, 15.0, 11.1.3
- Environment — device count, role (core/edge), production/lab, user count
If they've already provided this, skip to Step 2.
Step 2: Research (3 MCP Tool Calls)
Call these MCP tools in sequence:
1. Upgrade assessment:
Call damira_upgrade_plan with product, current_version, target_version, environment.
2. Security check:
Call damira_search_cve with the target version to check for known vulnerabilities.
3. Release notes:
Call damira_search_release_notes with product and target version for known bugs and caveats.
IMPORTANT: You MUST call all three MCP tools. Do NOT skip the CVE or release notes check — customers need the full picture before upgrading.
Step 3: Present Assessment
Combine findings from all three tools into a structured assessment:
- Upgrade Path — direct or stepping stones required
- Prerequisites — hardware, disk space, backups, licenses
- Security Advisories — CVEs fixed or introduced in target version
- Known Bugs — caveats from release notes
- Risk Level — low/medium/high with justification
- Estimated Maintenance Window — realistic duration
- Rollback Procedure — specific steps and trigger criteria
Step 4: Generate MOP
Offer:
"Want me to write the full MOP? I'll save it to documents/."
If yes:
- Call
damira_document_template with doc_type="mop" to get the required sections
- Write the complete MOP filling in every section with data from the upgrade assessment
- Every step must have expected output
- Rollback must have specific trigger criteria
- Save to
documents/{product}-upgrade-mop-{current}-to-{target}.md
Step 5: Generate Change Control (Optional)
If the user asks:
- Call
damira_document_template with doc_type="change_control"
- Write the change control with RFC fields, risk matrix, CAB checklist
- Save to
documents/{product}-change-control.md