budgeted-plan
A plan is a sequence of falsifiable hypotheses, not a sequence of pre-typed code blocks.
The standard convention is a 2949-line plan that pre-types every line of code into checklist form, then "executes" by typing the code into source files. That is not planning. That is dictation. We do not produce dictation.
The rule
Plan unit = slice.
Slice = (claim, falsifier, smallest code change, complexity budget, stress fixture).
A slice is done when:
- its unit tests pass, AND
- its stress fixture produces the expected result, AND
- the prove-it-prototype oracle still agrees with the binary, AND
- the complexity budget holds at the slice's scale.
Not before.
When this skill runs
After falsifiable-design has produced an approved design with a passing cheapest-falsifier. Not before.
Process
1. Decompose into slices
Take the claim list from the design. Each claim becomes one slice. If a claim is too big for one slice — more than ~50 lines of code, or touches more than 2 files — split the claim until it isn't.
A slice should be implementable in 30 minutes or less. If it takes longer, you have not decomposed enough.
2. Per-slice fields (mandatory)
Each slice has these fields before any code:
## Slice N: [one-sentence purpose]
**Claim:** [the design claim this slice implements]
**Oracle:** [independent computation; default = the prove-it-prototype oracle]
**Stress fixture:** [input designed to break a plausible bug, not just exercise the code]
**Loop budget:** [for each new loop: asymptotic cost AND production scale]
**Wall budget:** [only for always-on phases: max wall-clock at production scale]
**Files:** [exact paths to create or modify]
**Code (advisory):**
[you may pre-type code here, but the implementer is permitted to deviate
if the deviation keeps the slice within budget and the oracle passing]
**Verification:**
- [ ] Unit tests pass
- [ ] Stress fixture produces expected outcome
- [ ] prove-it-prototype oracle still agrees with binary
- [ ] Loop and wall budgets hold at fixture scale
If you cannot fill in all the mandatory fields, the slice is not ready. Do not fake it. Go think.
3. Loop budget rules
For every new loop the slice introduces:
- State the asymptotic cost in terms of the inputs. Examples:
O(files × crates), O(symbols log symbols), O(n + m).
- State the inputs' size at production scale. Examples:
files ≈ 50k, crates ≈ 200.
- Compute the product. If it exceeds 10^6 operations or 10^3 syscalls in an always-on phase, the loop is over budget. Either justify in writing why this is fine, or pick a different algorithm.
A loop without a complexity statement is a budget violation. Do not write one.
4. Stress fixture rules
For every slice that implements logic (not pure types, not pure schema):
- Write down a fixture designed to fail if a plausible bug exists.
- Plausible bug classes to design fixtures against:
- Two inputs with the same name in different scopes ("does the name-collision bug exist?")
- The secondary sort key never fires because the primary key is always unique in the happy-path fixture ("is the tie-break actually wired up?")
- Empty input ("does the empty-collection path exist?")
- Unicode, backslashes, paths with spaces ("did you assume ASCII?")
- Very large input ("is the loop budget honest?")
The stress fixture's expected output is written down before the implementation. Not after.
If you cannot think of a plausible bug for a slice, the slice is either too small to be worth its own test (combine with the next one) or you haven't thought hard enough (think harder).
5. Doc-comment-as-contract rule
For every doc comment in the slice that says "callers must X" or "Y is a precondition" or "Z must be non-empty," classify the precondition's enforcement strength FIRST, then enforce accordingly:
-
Load-bearing for correctness. If violating the precondition would silently produce wrong output (e.g., empty prefix → SQL LIKE '%' matches everything), add a runtime check that survives release builds. Return an error or a documented refusal value. debug_assert! alone is wrong here — it compiles out in release and the contract becomes a fiction.
-
Sanity hint for callers. If violating the precondition is "programmer error that would never reach production with a sane caller," debug_assert! is appropriate. Dev/test catches it; release tolerates it without semantic damage.
The test: ask "what does the function silently produce in release builds if this precondition is violated?" If the answer is "wrong output," you need a runtime check. If the answer is "nonsense that the caller would have caught upstream anyway," debug_assert! is fine.
A documented precondition without ANY enforcement is a documentation lie. We do not ship those.
6. Output stream rule
For every thing the slice writes to:
- Classify as data or diagnostic.
- Data goes to stdout. Diagnostics go to stderr.
- If you're not sure: ask "would a downstream pipe (
| jq, | grep) want to see this?" If yes, data. If no, diagnostic.
If the rule is violated, justify it in writing in the slice. Don't ship an unexamined println! to a file descriptor.
7. Self-review
Before saving the plan, run these five lists:
- Every loop in the plan. For each: complexity stated? Within budget at production scale?
- Every fixture. For each: what bug class is it designed to fail under? Is it more than a happy-path exercise?
- Every doc-comment precondition. For each: classified as load-bearing-correctness or sanity-hint? Where is the matching enforcement (runtime check for the former,
debug_assert! for the latter)?
- Every write target. For each: classified data or diagnostic?
- Every tracker reference. Per the tracker discipline introduced in
falsifiable-design: every "deferred to rivets-XXX" / "out of scope per rivets-YYY" / "tracked elsewhere" / "follow-up" in the plan must resolve to an existing tracker issue whose content covers the deferred work. Deferrals without a citation get an issue filed now before the plan is finalized — don't wait for review feedback to surface the gap.
If any of the five lists has gaps, the plan is incomplete. Don't save it.
Hard gate
The next skill — checkpointed-build — refuses to run until:
Red flags
- "I'll fill in the complexity budget later." Later is never. If you don't know the cost, you don't know what you're building.
- A slice that says "trivial, no fixture needed." Trivial slices don't get planned. They get inlined. If it's worth a slice, it's worth a fixture.
- A loop annotated
O(?) or "depends on input." Write down what it depends on, and bound it.
- A slice touching more than 2 files. Split it.
- A slice estimated at more than 30 minutes. Split it.
- A "happy path" fixture with no adversarial counterpart. Add one.
- "Pre-typed code in the plan is mandatory." Wrong. Pre-typed code is advisory. The contract is the slice's claim, fixture, oracle, and budget.
What this skill is not
This is not a script for an executor to type from. The plan is a hypothesis the implementer is allowed to update as they learn. Pre-typed code blocks are suggestions. If the implementer finds a better algorithm during execution, they take it — provided the oracle still passes and the budget still holds. The fields are the contract. The code blocks are scaffolding.
Output
A plan document with:
- One section per slice.
- Each slice has filled-in mandatory fields.
- A
## Plan Self-Review section at the bottom listing the five lists from step 7, all empty (no gaps).
If the plan has gaps, the skill didn't run. Run it.