| description | Decompose an approved technical plan (plan.md) into an executable, user-story-organized task list (tasks.md) — Setup, Foundational, one phase per user story in priority order with a mandatory closure checkpoint, then Polish. Enforces the Safe Deferral rule from spec-kit-generate-plan and traceability to spec.md/plan.md; when a task-decomposer agent is requested, generates compatible definitions for both Kiro CLI and Claude Code. |
| license | MIT |
Generate Tasks — Task Decomposition Skill
Purpose
Turn an approved technical plan (plan.md) into tasks.md: an ordered, dependency-aware,
user-story-organized task list that spec-kit-execute-tasks can run — without writing product code here.
This skill is the third link in the spec-kit chain (spec-kit-generate-spec → spec-kit-generate-plan →
spec-kit-generate-tasks): it does not redesign the plan, it decomposes an already-approved plan into
atomic, independently verifiable work.
The output is tasks.md plus checklists/tasks-quality.md. It does not implement product
code, and it does not validate cross-artifact consistency in depth — that deeper check is
spec-kit-analyze-consistency's job, when that skill is invoked.
User Input
$ARGUMENTS
Always consider the complete user message and any files or attachments available in the current
conversation, even when $ARGUMENTS appears literally or is empty. The most common input is a
reference to an existing feature directory or plan.md, with optional constraints ("only generate
tasks for the MVP story", "skip test tasks").
Core Principle
Organize by user story, not by technical layer. A story is only complete when its checkpoint
holds — closure is structural, not an afterthought.
tasks.md is grouped by user story (R-US##, in Priority order P1 → P2 → P3), so each
story is independently implementable, testable, and deliverable as an MVP increment.
- Every story's closing checkpoint is the mechanism that enforces "cierre de ciclos": a story only
counts as done when it is functional and verifiable on its own — which excludes, by
construction, leaving the system broken.
- Every task traces back to an operation in
plan.md and a requirement/acceptance criterion in
spec.md.
Non-Negotiable Rules
- Do not invent facts. Never fabricate a file path, an existing helper, or a test framework
convention not already verified in
plan.md's Technical Context or Project Structure. Use
verify-before-implement when a task needs a fact plan.md didn't already establish.
- Preserve plan intent. Do not reinterpret, split, or merge an
O-0# operation in a way that
changes what plan.md decided. Decomposing into smaller tasks is expected; changing the
approach is not.
- Separate facts from assumptions. A task whose exact file path isn't yet verifiable is
marked
nuevo: <proposed path>, never presented as if the path is confirmed.
- Surface conflicts. If decomposing an operation reveals it doesn't actually match
spec.md/plan.md cleanly, report the mismatch — do not silently resolve it by picking
whichever task shape is easiest to write.
- Organize by user story — never a flat generic task list. Structure is always Setup →
Foundational → one phase per
R-US## in Priority order → Polish. An operation that doesn't
belong cleanly to one story is assigned to the story that needs it first, with a forward
dependency noted — never placed in an ad hoc "misc" phase.
- No code before approval.
tasks.md describes work; it does not contain product code.
- No hollow tasks.md. Every task states a concrete action, a file (verified or explicitly
proposed), a dependency (or "ninguna"), and an observable validation criterion. "Improve X" or
"handle edge cases" without specifics is not a valid task.
- Use verified project context. Reuse
plan.md's Technical Context and Project Structure
directly — do not re-derive the project's layout independently and risk disagreeing with it.
- Keep scope controlled. No task introduces work absent from
plan.md/spec.md. A gap found
during decomposition is reported, not quietly filled with a "nice to have" task.
- The Closure Rule is mandatory, not optional polish. Every user-story phase — and
Setup/Foundational when it gates the whole feature — ends with an explicit
[CIERRE] task
(§ Closure Rule below). It is never omitted, never merged into a regular task, and never
marked done by inference.
- Safe Deferral consistency is enforced during decomposition. If
plan.md's Safe Deferral
table marks an operation Dormant for a later story, no task in an earlier story may invoke
that deferred code path — doing so silently invalidates the Dormant classification. If this
happens, report it as a conflict with plan.md, do not silently write the task anyway.
- Every task is traceable. Each task cites the
R-FR##/R-AC##/O-0# it satisfies.
- Never claim readiness without validation.
tasks.md is READY only after
checklists/tasks-quality.md passes.
- Generate portable agent pairs. If this workflow creates a
task-decomposer (or other
support agent), it must generate and validate both a Kiro CLI and a Claude Code definition per
the shared portability contract.
Cross-Platform Agent Compatibility
The complete portability contract lives in spec-kit-shared/agent-portability.md (same document
spec-kit-generate-spec and spec-kit-generate-plan use). Before generating, validating, or reporting on the
task-decomposer role — or any other agent this skill materializes — read that file completely
and follow it exactly. If the active host cannot resolve the reference, follow its fallback
section.
task-decomposer is the standard role for this skill: decomposing a disproportionately large plan
operation or user story into atomic tasks, to keep the main context light. Do not invent a
different name or redefine it for another purpose.
Artifact Conventions
The .speckit/ layout (including .speckit/specs/<feature-dir>/), feature.json, state.json, and the Content
Fingerprint Convention all live in spec-kit-shared/artifact-conventions.md. Read it before Fase 0
below and follow it exactly.
Input Contract
Resolving the Target Plan
-
If the user gave an explicit plan.md path or feature directory, use it.
-
Otherwise, read .speckit/feature.json for the active feature directory.
-
If neither resolves to a readable plan.md, stop and ask:
Provide the feature directory or plan.md path to decompose into tasks. If you haven't
generated a plan yet, run spec-kit-generate-plan first.
-
Read plan.md, spec.md, and checklists/plan-quality.md completely.
Readiness Gate
- If
plan-quality.md's STATUS is READY, proceed.
- If it is
DRAFT — NEEDS CLARIFICATION, stop and ask the user to either resolve the blocking
items in spec-kit-generate-plan first, or explicitly confirm decomposing a draft plan into tasks. If
confirmed, proceed but record DECOMPOSED_FROM_DRAFT_PLAN: true in tasks.md's header and
repeat the warning in the Completion Report.
- If
spec.md's own STATUS is not READY either, surface both — a plan built on a draft spec
compounds the risk of a draft plan.
New vs. Update Mode
- New mode: no
tasks.md exists yet. Proceed through all phases below in order.
- Update mode:
tasks.md already exists. Run Fase 0 below first; follow
§ Updating an Existing Task List rather than regenerating from scratch.
Fase 0 — Staleness Check (every invocation, new or update)
- If
.speckit/specs/<feature-dir>/state.json does not exist, or has no artifacts.tasks entry yet, this
is the first task list for this plan — skip straight to Phase 1, and create/update
state.json at the end.
- Otherwise, read
spec-kit-sync-artifacts/SKILL.md and follow its Phase 1/2 mechanical
detection procedure against artifacts.tasks.based_on_plan_hash vs. plan.md's current
content hash — do not re-derive the hashing/comparison mechanism independently.
- If
spec-kit-sync-artifacts reports a match, plan.md hasn't changed since the last task generation —
proceed normally.
- If it reports drift, this skill does the classification
spec-kit-sync-artifacts leaves to the
consuming skill: identify which O-0#/A-D0#/Safe-Deferral entries actually changed (using
spec-kit-sync-artifacts's best-effort localization, or a direct diff if it couldn't resolve one), and
classify each as functionally material (a new/changed/removed operation, a changed Safe
Deferral condition) or non-material (wording). Only material changes make tasks.md stale with
impact.
- Report the affected IDs and which task phases they touch before proceeding. If
spec-kit-sync-artifacts flagged any already-[x] task as potentially affected, treat that with the
same non-negotiable caution as § Updating an Existing Task List step 3 below.
- This Fase 0 does not depend on
spec-kit-sync-artifacts being invoked as a separate conversational step
— apply its documented procedure directly, inline, as part of this phase.
Workflow
Phase 1 — Determine Story Order
Read every R-US## in spec.md's Actors and Scenarios, with its Priority (P1/P2/P3).
Order user-story phases P1 → P2 → P3; within the same priority, preserve spec.md's original
order. If a story has no assigned priority (an older spec.md predating the priority field),
treat it as P1 and flag this in the Completion Report rather than silently guessing an order.
Cross-check every O-0# in plan.md against which R-US##/R-FR## it satisfies, so each
operation can be placed in the correct story phase in Phase 4 below.
Phase 2 — Setup Tasks
Shared, low-risk project setup: creating the structure plan.md's Project Structure describes,
initializing dependencies from Technical Context. No story-specific logic here.
If the existing project structure and dependencies already satisfy everything Technical
Context/Project Structure need — a small feature added to an already-scaffolded project — state
that explicitly ("No setup tasks required — structure and dependencies already match plan.md")
instead of manufacturing a task to fill the phase. An empty phase with a stated reason is honest;
a busywork task is not (Rules 7, 9).
Phase 3 — Foundational Tasks (Blocking Prerequisites)
Infrastructure genuinely required by every user story (shared auth, shared schema setup,
shared routing/middleware) — not just infrastructure convenient for one story. If in doubt whether
something is Foundational or belongs to a specific story, prefer assigning it to the first story
that actually needs it; an oversized Foundational phase delays every story's start unnecessarily.
Same rule as Setup: if no shared prerequisite work is actually needed beyond what already exists,
say so explicitly rather than inventing a task.
Ends with a checkpoint statement: foundation ready, user stories may start.
Phase 4 — One Phase per User Story (in Priority order)
For each R-US##, in the order from Phase 1:
- State the Goal (from
R-US##) and Independent test (from its R-AC##).
- Tests (optional — only if
spec.md explicitly requests tests): write them first; they must
fail before implementation exists.
- Implementation tasks: decompose every
O-0# this plan assigned to this story into atomic
tasks. Use the task format below.
- Closure task (§ Closure Rule): always the last task of the phase.
- Checkpoint statement: the story works and is independently verifiable.
Task Format
- [ ] T0XX [P?] [USn] Description
Traza a: R-FR0#, O-0#
Archivo(s): ruta verificada, o "nuevo: ruta propuesta"
Depende de: ninguna | T0YY
Validación: comando o criterio observable
[P]: parallelizable — different files, no cross-dependency with other [P] tasks in the same
phase.
[USn]: which user story. Setup/Foundational tasks carry no story tag.
- Sequential numbering (
T001, T002, ...) continues across the whole document — do not restart
numbering per phase.
Closure Rule (mandatory — see Non-Negotiable Rule 10)
- [ ] T0XX [USn] [CIERRE] Verificar consistencia de cierre de USn
Verifica:
- Ninguna referencia colgante a código de una historia futura no marcada Dormant/Flagged/Aditiva
- Ninguna rama/ruta alcanzable queda a medio conectar
- Todo R-AC de esta historia está satisfecho o formalmente reclasificado como aplazamiento seguro (ver plan.md Safe Deferral)
Validación: recorrido explícito de las condiciones anteriores, no una inferencia
This task is marked [x] only when it actively confirmed nothing was left half-done — never for
merely producing code. Cross-reference plan.md's Safe Deferral table: if this story is the
target of a deferred operation from an earlier story, the closure task also confirms that
operation genuinely remains Dormant/behind its Flag/purely Additive and hasn't been
accidentally activated by this story's own work.
Phase 5 — Polish & Cross-Cutting Concerns
Work that spans multiple stories: documentation (delegate to code-documentation when
applicable), cleanup, running quickstart.md as final validation. Depends on all targeted stories
being complete.
Phase 6 — Closing Sections (always generated)
- Dependencies & Execution Order: phase dependencies (Setup → Foundational → stories →
Polish) and, within each story, task-level order (tests before implementation, models before
services,
[CIERRE] always last).
- Parallel Example: one concrete block showing
[P] tasks from the P1 story launchable
together.
- Implementation Strategy: MVP-first (Setup + Foundational + the
P1 story only, stop and
validate its checkpoint), incremental delivery (one story at a time, each deployable), and
parallel execution strategy (once Foundational is done, independent stories may go to separate
task-executor agents in spec-kit-execute-tasks — the story boundary is the primary parallelism unit).
Traceability and Safe Deferral Consistency Checks
Before validating the checklist:
- Every task cites at least one
R-FR##/R-AC## and the O-0# it decomposes.
- Every
O-0# in plan.md appears in at least one task, in the story plan.md assigned it to.
- Every user-story phase ends with exactly one
[CIERRE] task covering all of that story's
R-AC##.
- No task in a story earlier than a
Dormant-deferred operation's target story invokes that
operation's code path (Non-Negotiable Rule 11).
- Task IDs are sequential and unique across the whole document.
Validate and Iterate
Create checklists/tasks-quality.md:
# Tasks Quality Checklist: [Feature Name]
**Purpose**: Validate internal consistency and traceability of tasks.md before execution
**Tasks**: [Relative link to tasks.md]
**Status**: [READY / DRAFT — NEEDS CLARIFICATION]
## Structure
- [ ] Phases follow Setup → Foundational → one phase per R-US## (Priority order) → Polish
- [ ] No task sits outside this structure (no ad hoc "misc" phase)
- [ ] Task IDs are sequential and unique
- [ ] An empty Setup/Foundational phase states a reason instead of a filler task
## Task Quality
- [ ] Every task has Traza a / Archivo(s) / Depende de / Validación
- [ ] No task uses a vague description without a concrete action and file
- [ ] Every file path is verified, or explicitly marked "nuevo: <proposed path>"
## Closure Rule
- [ ] Every user-story phase ends with exactly one [CIERRE] task
- [ ] Every [CIERRE] task's Verifica block covers dangling references, half-wired paths, and R-AC coverage
- [ ] Foundational's checkpoint is present if it gates all stories
## Safe Deferral Consistency
- [ ] No earlier-story task invokes a later story's Dormant-deferred operation
- [ ] Deferred operations from plan.md's Safe Deferral table are each covered by exactly one later task/story
## Traceability
- [ ] Every O-0# from plan.md appears in at least one task
- [ ] Every task's R-FR##/R-AC## citation exists in spec.md
## Governance
- [ ] tasks.md contains no TODOs, placeholders, or unresolved template labels
- [ ] state.json was created/updated with this task list's content hash and based_on_plan_hash
## Agent Portability
- [ ] If a task-decomposer (or other agent) was generated, both Kiro and Claude definitions exist and validated per spec-kit-shared/agent-portability.md, or AGENTS: none is reported
## Notes
[Specific failures, evidence, and remaining decisions]
Validate item by item, fix non-blocking failures, re-run up to three iterations. If a blocking gap
remains, set STATUS to DRAFT — NEEDS CLARIFICATION. Set READY only when every item passes.
Updating an Existing Task List
When plan.md changed materially since the last tasks.md (Fase 0 detected drift):
- Identify affected
O-0#/story IDs from the diff.
- Propagate only through the story phases those IDs touch — add/modify/remove tasks within the
affected story phase(s); do not regenerate unrelated stories.
- Never silently modify a task already marked
[x]. If a completed task is affected by the
change, flag it explicitly as "closed task affected by plan change — needs review" rather than
editing or unmarking it automatically. This is the same non-negotiable spec-kit-sync-artifacts carries
in the design doc: work already done on an assumption that just changed is a risk to surface,
not silently paper over.
- Preserve task IDs where semantics are unchanged; append new IDs (continuing the sequence) for
new tasks — never renumber existing tasks.
- Re-verify the affected story's
[CIERRE] task still covers the right R-AC## set.
- Update
state.json's artifacts.tasks.content_hash and based_on_plan_hash only after the
targeted regeneration validates.
- Re-run the full
tasks-quality.md checklist regardless of how small the change was.
- Summarize exactly which task phases changed and why.
Pre-Execution Extension Hooks
Before task decomposition, check .speckit/extensions.yml per
spec-kit-shared/artifact-conventions.md's schema, reading hooks.before_tasks. Follow the same
enablement/condition/mandatory-vs-optional rules spec-kit-generate-spec and spec-kit-generate-plan use for their
own hooks.
Mandatory Post-Execution Hooks
After task decomposition, process hooks.after_tasks the same way, using the same
emit-then-execute format the other spec-kit skills use.
Completion Report
Report:
SPECIFY_FEATURE_DIRECTORY: resolved feature directory.
TASKS_FILE: tasks.md path.
CHECKLIST_FILE: checklists/tasks-quality.md path.
STATUS: READY or DRAFT — NEEDS CLARIFICATION.
DECOMPOSED_FROM_DRAFT_PLAN: true if plan.md was not READY when tasks were generated.
STORIES: count of user-story phases and their priorities, in the order generated.
SAFE_DEFERRAL: confirmation that every plan.md Safe Deferral entry maps to exactly one later
task/story, or the mismatches found.
VALIDATION: passed/total checklist items and unresolved failures.
TRACEABILITY: operation/requirement coverage counts.
CHANGES: for updates, the story phases changed, and any closed tasks flagged for review.
AGENTS: none, or every generated Kiro/Claude path with validation and parity status.
NEXT: clarification if blocked; otherwise recommend spec-kit-analyze-consistency (optional deeper
cross-artifact check) and then spec-kit-execute-tasks, starting with the P1 story as the MVP.
Done When