| description | Generates a sprint retrospective from sprint data feedback and metrics — cover what went well what didn't and action items, group related feedback into themes, ensure every "what didn't" has at least one specific owned time-bound action item, use the retrospective template when available, include Owner Timeline and Linked Issue columns. Language-agnostic. Trigger words: retrospective, retro, sprint review, what went well, what didn't, improvement items, lessons learned, sprint retrospective.
|
| metadata | {"version":"1.0.0","user-invocable":"true"} |
Creating a Sprint Retrospective
Generate a structured retrospective focused on learning and actionable improvements.
Quick Reference
- Input: Sprint data (goal, completed/not completed), team feedback, metrics.
- Output: Retrospective document with action items.
- Sections: What Went Well, What Didn't, Action Items, Metrics, Kudos.
- Rule: Every "what didn't" needs an action item with an owner.
HARD-GATE
DO NOT fabricate feedback — only include input the team actually provided.
DO NOT skip action items — every "what didn't" must have at least one action.
DO assign an owner and timeline to every action item.
Core Process
- Gather — sprint data (goal met? completed/not completed tickets), team feedback, relevant metrics.
- Categorize:
- What Went Well — wins, effective practices, things to continue.
- What Didn't — blockers, bottlenecks, process issues, surprises.
- Kudos — shout-outs and recognition.
- Identify themes — group related feedback into themes rather than listing raw comments.
- Draft action items — specific, owned, time-bound. Use the template in RETROSPECTIVE_TEMPLATE.md if available; otherwise use the minimal template below.
- Review — verify every "what didn't" maps to an action item.
Reference Template
Use RETROSPECTIVE_TEMPLATE.md if bundled; otherwise use this minimal fallback:
## Sprint [Name/Number] Retrospective
**Dates:** YYYY-MM-DD – YYYY-MM-DD | **Goal:** <goal text> | **Goal Met:** Yes / No / Partial
### What Went Well
- **[Theme: CI Pipeline]** Automated tests caught three regressions before merge — saved estimated 4 h of manual QA.
### What Didn't
- **[Theme: Unclear Requirements]** Two tickets were blocked mid-sprint due to missing acceptance criteria → see Action #1.
### Action Items
| # | Action | Owner | Timeline | Linked Issue |
|---|--------|-------|----------|--------------|
| 1 | Add acceptance criteria checklist to Definition of Ready | Product Owner | Next sprint kickoff | PROJ-42 |
### Metrics
- Velocity: 34 pts committed / 28 pts completed (82%)
- Carried over: 2 tickets
### Kudos
- Alice for unblocking the auth service on short notice.
Section order: header → What Went Well → What Didn't → Action Items → Metrics → Kudos. Use English unless the user requests otherwise.
Integration
| Skill | When to chain |
|---|
| plan-sprint | Review the sprint plan vs what was actually delivered |
| generate-status-report | Include retrospective insights in the next status report |
| project-manager | Feed action items into the execution tracking pipeline |