Planr Task Graph
Use planr as the canonical local coordination system for this repository.
Planr has two first-class layers:
- Markdown plans for product context, build scope, verification, and narrative decisions.
- SQLite map state for items, links, picks, runtime heartbeats, approvals, contexts, logs, reviews, runs, and closure.
The map is the source of truth for live state. Markdown explains scope and acceptance.
Start Here
Inspect the project and map before changing work:
planr project show --json
planr map show --json
planr map lane --critical
planr map pressure
If no project exists:
planr project init "Project Name" --client all
planr doctor --client all
Core Loop
Use one item at a time. The short path is two commands per step:
planr pick --json
planr done <item-id> --summary "what changed" --files a --files b --cmd "exact verification command" --tests "exact test command" --review [--next]
pick --json returns one flat work packet (item, links, logs, runtime, recovery, conditions, recall context, remaining progress); empty collections are omitted. done writes the completion log (test runs belong in --tests, build/serve commands in --cmd), requests review (--review, which moves the item to in_review) or closes directly, and --next picks the following item. Evidence logs refresh the heartbeat automatically.
For longer work, keep the live claim visible:
planr pick progress <item-id> --percent 50 --note "tests running"
planr pick pause <item-id> --note "waiting for human input"
planr pick resume <item-id>
Capture decisions and discoveries another agent may need:
planr context add "decision or discovery" --item <item-id> --tag discovery
Record evidence before review:
planr log add --item <item-id> \
--summary "what changed" \
--files file-a,file-b \
--cmd "exact verification command"
Granular alternative: request review, close review, then close the item:
planr review request <item-id>
planr review close <review-id> --verdict complete --close-target
planr close <item-id> --summary "Verified with evidence"
--close-target closes the reviewed item together with the review when the verdict is complete and a completion log exists; the separate planr close is then unnecessary.
If human approval is part of the gate, request it and do not close until it is approved:
planr approval request <item-id> --reason "release approval"
planr approval list --open
If review finds issues:
planr review close <review-id> \
--verdict not-complete \
--findings "specific actionable finding"
planr map show --json
planr pick --json
Planr creates fix and follow-up review work instead of pretending the parent item is done.
Planning Flow
For broad app or product work:
planr plan new "App idea" --platform web --ai --backend
planr plan refine <plan-id> --note "Assumption or decision"
planr plan split <plan-id> --slice "MVP implementation"
planr plan check <build-plan-id>
planr map build --from <build-plan-id>
Product plan work lists are candidates. They become live commitments only after planr map build --from ....
map build creates items without ordering: everything starts ready. Linking is mandatory before the first pick — add a blocks link for every real execution dependency:
planr link add <earlier-item> <later-item> --type blocks
planr map lane --critical
Do not pick from a freshly built map that has zero links unless the items are genuinely independent.
When planr agents list --json shows routes with use-case work_type selectors (e.g. frontend, backend), retag freshly built items to match their work (planr item update <id> --work-type frontend) so pick packets carry the declared profile, model, and paired skill. This is the agent's job — never the user's; items matching no route keep code and fall to the default route.
Parent Gate Pattern
Model material changes as parent gates. The parent is the completion gate; linked children do the work.
Default shape:
parent gate
`- implementation or test child
`- review item linked to that child
|- pass -> child can close -> parent gate auto-closes
`- findings -> fix item -> follow-up review -> ...
Rules:
- create a parent item for the change;
- use
planr item breakdown <parent-id> --into "Implement" --into "Verify" (one --into per child; a single value may also pack newline- or comma-separated titles) to create chained child work under that parent — the output lists every child with id and status plus the next pick command;
- request review on the implementation or test child after evidence exists;
- if review finds issues, let Planr create fix and follow-up review work from the review verdict;
- make later top-level work depend on the parent gate, not only the first child.
Parent gates roll up on their own: when every child is settled, the gate auto-closes unless a review or approval on the gate itself is still open. Do not pick a parent gate as work; planr pick skips them.
Dependencies
Create ordering explicitly:
planr item create "Design API" --description "Define endpoints and data ownership."
planr item create "Implement API" --description "Build endpoints after design is closed."
planr link add <design-item> <implementation-item> --type blocks
Readiness comes from graph links and item state, not Markdown checkboxes.
Use:
planr item breakdown <item-id> --into "Trace owner" --into "Implement" --into "Verify"
planr link remove <from-item> <to-item> --type blocks
Handoff Evidence
Every closure must be evidence-backed:
- changed files through
--files;
- commands through
--cmd;
- tests through
--tests;
- remaining risks through context, notes, or findings;
- review outcome through
planr review ....
Use task-local notes for nearby handoff:
planr note add "Reviewer asked for an extra package dry-run before closure." --item <item-id>
Use contexts for reusable project knowledge:
planr context add "Do not edit global client config without explicit operator approval." --tag constraint
Use a story log only when map state, logs, and contexts are too thin to preserve the decision chain. Story logs are narrative memory, not status authority.
Recovery
After interruption or handoff:
git status --short
planr project show --json
planr map show --json
planr map lane --critical
planr map pressure
Then inspect the item:
planr trace item <item-id>
planr log list --item <item-id>
planr context list --item <item-id>
If a stale pick must be reset:
planr pick stale --older-than-seconds 900
planr pick stale --older-than-seconds 900 --release
planr pick release <item-id> --force
Completion Rule
Do not call work complete until:
- required child and review items are closed;
- approval gates are approved or absent;
- log evidence exists;
- verification commands were actually run;
- review findings are closed or converted into follow-up work;
planr map show --json shows no in-scope blocker;
- the user-facing summary matches map, logs, and review state.
For release-grade scopes, rerun the full verification ladder from the repository testing guide.