| description | Record a consequential technical decision with context, constraints, considered options, trade-offs, consequences, and conditions for review. Use when a team must choose an architecture, dependency, data model, protocol, or operational approach that will be expensive or confusing to reverse. |
write-an-architecture-decision-record
Preserve why a choice was reasonable at the time. Make the record short enough to read and specific enough
that a future maintainer can tell whether its assumptions still hold.
Inputs
- Name the decision owner, reviewers, deadline, affected systems, and implementation stage.
- Gather requirements, constraints, measurements, prior decisions, and rejected proposals.
- Separate facts, estimates, preferences, and organizational constraints.
Procedure
- Give the decision a stable id and action-oriented title.
- Describe the context and problem without embedding the preferred answer.
- List decision drivers in priority order: correctness, compatibility, delivery, operability, security, cost, performance, or reversibility.
- Record the smallest serious option set, including keeping the current approach when viable.
- Evaluate each option against the same drivers using evidence and clearly labeled estimates.
- State the decision in one paragraph, including scope and what it does not decide.
- Record positive, negative, and uncertain consequences. Name new operational work and migration cost.
- Define validation: prototype, benchmark, compatibility check, failure walkthrough, or review evidence.
- Set reopening conditions tied to measurable changes rather than a calendar date alone.
- Link superseded and dependent records, implementation work, and reviewers.
- Obtain acknowledgement from accountable owners and store the record beside the system.
Boundaries
Do not rewrite an old record to make history look cleaner. Supersede it with a new decision. Never present
an estimate as measured fact or hide a policy, staffing, cost, privacy, or security constraint behind
technical language.
Done
- The decision record contains context, ranked drivers, options, decision, consequences, and scope
- Evidence and estimates are distinguished, with validation results or a named validation plan
- Reviewers and accountable owners are recorded along with meaningful dissent
- Reopening conditions and links to superseded, dependent, and implementation records are complete
Then use design-a-production-system when the decision depends on a wider architecture.