Assess shaping depth and subject clarity.
- If the requested project subject is too vague for another agent to identify, ask what project to shape before doing anything else.
- Classify the shaping need as
lightweight, standard, or deep.
- Lightweight shaping may produce a compact
project.md with minimal questioning.
- Deep shaping should pressure-test direction before creating roadmap slices.
- Shape at full ambition within the named project, but do not widen into adjacent projects unless the current project cannot be coherent without them.
-
Resolve the project.
- If the user names a project, use that slug or create it if missing.
- If exactly one project exists under
docs/rolling-wave/, use it.
- If multiple projects exist and none was named, ask which one to use.
- Before creating a new project, normalize the requested slug and compare it with existing project folders. Push back if it strongly overlaps.
-
Inspect existing context.
- Read existing
project.md, slice files, nearby planning docs, and any user-provided requirements.
- Auto-resolve answers from artifacts before asking the user.
- Treat explicit user requirements, named docs, and existing
project.md decisions as constraints.
- Treat nearby docs, old slice notes, and inferred repo context as background unless the user names them as constraints.
- Do not treat this skill's own workflow rules as project context. They govern the current shaping session only.
- If
project.md already exists, shape as an update: preserve prior decisions unless the user explicitly changes them, keep completed slice history intact, and move stale assumptions only when artifact evidence supports the change.
- If context is thin, do not ask unlimited questions, but still meet the minimum shaping gate before writing: finish line, observable success criteria, scope boundaries, meaningful constraints, likely first implementation slices, and any material product/API/policy decisions that affect the whole project.
- Label remaining assumptions clearly only when they are low-impact, evidence-backed, or explicitly safe to defer to slice preparation.
-
Grill project-level direction until the whole project shape is coherent.
Ask one high-leverage question at a time. Cover:
- finish line
- success criteria
- non-goals
- constraints
- assumptions
- broad implementation slice sequence
- dependencies
- project-level risks
- expected learnings
Keep scope and sequencing separate:
- First decide whether a requirement, behavior, risk, or non-goal belongs in the overall project shape.
- Only after project scope is clear should the roadmap decide which slice handles it.
- Do not ask whether a project-level requirement should be "deferred to a later slice." Ask whether it is in scope for the project at all, then record likely sequencing separately.
- If something is too risky for the first slice but still part of the desired outcome, keep it in the project finish line or roadmap and sequence it later. Do not turn sequencing into accidental de-scoping.
Keep slices implementation-shaped:
- A slice is a concrete step that
prepare-next-slice can turn into an implementation contract and implement-slice can build.
- Prefer the smallest coherent reviewable change. A good slice should feel like one intentional commit: narrow enough to review easily, but complete enough to move the project forward.
- If a proposed slice combines multiple review concerns, split it into smaller commit-sized slices unless that would create fake sequencing or unnecessary churn.
- If a concrete slice grows large enough to have its own global finish line, success criteria, and internal sequence, keep it as one parent slice and create or reference a child rolling-wave project under
docs/rolling-wave/{child-project}/.
- Do not expand a child project's internal slices into the parent roadmap unless the parent genuinely needs to track those steps separately.
- Record the parent slice's completion condition in parent terms, for example "child project reaches its finish line and exports the migration notes needed by the parent project."
- Do not create slices that are only project phases, research phases, planning phases, validation phases, or vague lifecycle stages.
- Avoid slice names like "Design the approach", "Validate compatibility", "Phase 1", or "Future hardening" unless they are rewritten as concrete implementation deliverables.
- Good slice framing names the product/code behavior that will change, for example "Add entitlement-aware catalog inputs" or "Filter list_items from the builtin catalog when item read is unavailable".
- Research, design, validation, and compatibility checks belong inside the relevant implementation slice as readiness, verification, risks, or acceptance criteria unless they produce a standalone reviewable artifact needed by implementation.
Scan for these gaps and probe only the gaps that are actually present:
- Finish-line gap: completion is described as activity rather than an observable end state.
- Success gap: success criteria are vague, subjective, or generic.
- Scope-boundary gap: likely adjacent work is not explicitly included or excluded.
- Dependency gap: the roadmap assumes unresolved inputs, tools, access, or decisions.
- Sequencing gap: early slices do not reduce uncertainty or do not produce reviewable implementation progress.
- Risk gap: cross-slice risks are likely but not recorded.
- Learning gap: early slices do not identify what they should teach later slices.
- Open-question gap: the artifact would contain a project-level question that has not actually been asked.
If useful, derive 3-5 project axes such as user workflow, data shape, migration risk, rollout, docs, or reliability. Use them only to check question coverage, not to create a detailed upfront plan.
Classify unresolved questions before writing:
- Ask-now questions affect the finish line, success criteria, scope, non-goals, constraints, broad slice sequence, first slice, user-facing behavior, public API behavior, compatibility policy, rollout policy, or project-level risk.
- Safe deferrals are implementation details for a future slice, low-impact unknowns, facts that slice preparation can verify from code, or items the user explicitly chooses to defer.
- Ask-now questions cannot be silently moved into
Open Questions. Ask them one at a time, or ask the user whether to explicitly defer them.
-
Shape and grill the broad implementation slices.
This is not prepare-next-slice; do not fully specify each slice. The goal is shared understanding of the broad delivery sequence.
Before writing roadmap rows:
- Propose 2-3 plausible slice sequences when more than one ordering could make sense.
- For each option, summarize the sequencing tradeoff in one sentence: what it learns early, what it delays, and what risk it carries.
- Recommend one sequence when evidence favors it, and push back if the user's preferred sequence has strong evidence against it.
- Ask the user to choose, combine, or correct the broad sequence before writing it.
Grill the chosen or likely sequence enough to catch bad slices:
- Are the slices implementation steps rather than phases?
- Does each slice produce a reviewable change or artifact needed by implementation?
- Is each slice small enough to review like one coherent commit?
- Should any broad slice be split into smaller commit-sized slices before it becomes a child project?
- Does the first slice reduce a meaningful uncertainty or create the smallest useful foundation?
- Are later slices broad enough to stay flexible, but concrete enough that
prepare-next-slice can refine them?
- Are dependencies and learnings flowing forward between slices?
- Are any important requirements accidentally missing because they were treated as "later" rather than in-scope?
- Are any slices too large for one slice contract and better represented as a child rolling-wave project?
Ask only the highest-leverage roadmap questions. Stop once the user and agent share a rough slice map, not when every slice has a full contract.
-
Avoid implementation detail.
- Keep file/function decisions out unless they materially change scope, risk, sequencing, or feasibility.
- Record tempting implementation details as notes only when they affect project shape.
-
Present a project-shape synthesis before writing.
- Summarize
Stated, Inferred, and Out of scope.
- Include the proposed broad slice sequence and call out any remaining roadmap uncertainty.
- Include any remaining ask-now questions separately from safe deferrals.
- Exclude skill mechanics from the synthesis unless the user explicitly wants to document the planning process.
- Ask unresolved ask-now questions before asking the user to confirm the synthesis.
- Ask the user to confirm or correct the synthesis before writing.
- After asking for confirmation, stop and wait. Do not write the artifact in the same response as the confirmation request.
- If the user corrects it, revise the synthesis before updating artifacts.
-
Write or update docs/rolling-wave/{project}/project.md.
- Use
../rolling-wave-common/references/artifacts.md for the project template.
- Use
../rolling-wave-common/references/lifecycle.md for slice status rules.
- Optimize the artifact for future agent retrieval, not human readability: compact tables, stable IDs, canonical statuses, paths, and one fact per canonical section.
- Avoid narrative summaries, intro paragraphs, duplicated rationale, or polished prose. Put human-facing explanations in chat or
exec-summary, not in project.md.
- Create
slices/ if missing.
- Add broad future implementation slices as
pending when useful.
- Update change history.
- For each major project-level decision, include a basis when it is not obvious:
direct, prior, or reasoned.
- Before saving, remove skill-leak text from project sections. Examples: "planning only in this phase", "this skill does not modify product code", "use shape-project first", "ask one question at a time", or any statement that describes the agent workflow rather than the project.
- Before saving, audit
Open Questions: each item must be either explicitly asked and left unanswered/deferred by the user, or clearly safe to defer to a later slice-preparation conversation.
Roadmap slices should describe implementation-step outcomes and learning order, without over-planning file/function details. A good pending slice has:
- a clear reviewable implementation outcome
- a commit-sized scope that is easy to review
- a reason it belongs before or after nearby slices
- enough scope signal for later
prepare-next-slice
- an implied product/code/docs change that can be implemented and reviewed
- no detailed file/function/API design unless it changes sequencing or risk
- a child-project reference when the slice is intentionally managed by another rolling-wave project
Before saving, normalize artifact style:
- convert long prose to short table rows or
key: value bullets
- assign IDs to success criteria, constraints, assumptions, decisions, open questions, risks, and review notes
- remove duplicate facts from secondary sections and replace them with paths or IDs
- keep only decision-relevant
why or basis text
Before saving, rewrite phase-like roadmap items into implementation slices. If an item cannot be expressed as a concrete implementation step, record it as a risk, open question, verification concern, or cross-slice decision instead of a slice.
-
Run a completion coverage check.
- Every required shaping area has an answer, explicit deferral, or recorded unknown/risk.
- Every material project-shape question was asked, auto-resolved from evidence, or explicitly deferred by the user before writing.
- Generic success criteria are sharpened into observable outcomes.
- Cross-slice decisions and risks are recorded at project level.
- Requirements are either in the project finish line, explicitly out of scope, or recorded as project-level unknowns; they are not hidden inside "later slice" language.
Open Questions does not contain unasked ask-now questions.
- No section contains skill mechanics presented as project facts.
- Each roadmap slice is an implementation step, not just a general project phase.
- The broad slice sequence was presented, grilled, and confirmed or explicitly accepted as an assumption.
- The next likely slice is clear enough for
prepare-next-slice.
Stop when the project has enough global direction to define the desired end state and broad slice sequence without pretending later slices are fully specified.
Omit routine caveats for planning-only work. Do not say that no code tests were run or that docs/rolling-wave/ is gitignored unless the user asked about verification, persistence, or file visibility, or unless an attempted validation step failed.
Do not start slice preparation unless the user explicitly asks.