Skip to main content

critical-risk-manager

Use this skill when building or reviewing a bow tie risk assessment, defining a critical risk, assessing control (barrier) assurance, or scoring residual risk for NZ/AU workplace hazards. Triggers on "bow tie", "bowtie", "critical risk", "control assurance", "barrier", "top event", "barrier analysis", "threat", "consequence", "risk matrix", "residual risk", "escalation factor", "critical control". Builds the structured visual risk story for high-energy / fatal-risk hazards — crane lifts, confined space, working at height, chemical handling, traffic/mobile plant, electrical, dropped objects. Grounded in HSWA 2015 (NZ) and the WHS model law (AU). Use the bow tie structure here before starting any bow tie.

Aller à l'installation

Informations de source

Dépôt
scottmss/hse-nz-au-skills
Dernière activité de la source
2 juillet 2026 à 02:05
Langue détectée de SKILL.md
anglais
Étoiles
0
Forks
1

Options d'installation

Le prompt qui vérifie d'abord la source est sélectionné par défaut. Vous pouvez passer à une commande directe ou télécharger une copie locale.

Vérifiez les fichiers source

Lisez SKILL.md et les fichiers associés affichés par SkillsMP avant de décider de l'installer.