| description | Orchestrates release readiness, launch sequencing, verification, and follow-up actions for a controlled product release. Use when the user asks to ship this release, prepare the launch, run the release flow, or coordinate the rollout — even when they only say "let's launch". Owns end-to-end release orchestration; defers the single merge-and-deploy execution to `release-and-deployment/land-and-deploy`, durable deploy configuration to `release-and-deployment/setup-deploy`, and release notes to `release-and-deployment/document-release`. |
| version | 1.0.0 |
Ship
Purpose
Orchestrates release readiness, launch sequencing, verification, and follow-up actions for a controlled product release.
Use This Skill When
Use this skill to orchestrate a full, multi-step release — readiness, sequencing, verification, and follow-up:
- "ship this release" / "run the release flow" — drive the release from readiness to follow-up
- "prepare the launch" — confirm readiness and sequence the launch steps
- "coordinate the rollout" — manage verification and post-launch actions across the release
Route elsewhere for a single merge-and-deploy of one change (release-and-deployment/land-and-deploy), first-time deploy configuration (release-and-deployment/setup-deploy), or release documentation (release-and-deployment/document-release).
Inputs
- Release candidate package with approved review evidence, deployment configuration, and rollback plan.
- Launch window, rollout sequence, and verification checkpoints from the release plan.
- Known constraints such as partial-rollout requirements, feature-flag dependencies, and communication obligations.
Outputs
- Release record with launch evidence, live verification results, and rollout state.
- Post-ship checklist identifying remaining verification steps, rollback triggers, and follow-up actions.
- Escalation notes when a rollout gate fails and the release must be paused or rolled back.
Workflow
- Confirm the release candidate, launch window, rollback path, and verification checkpoints before the rollout starts.
- Sequence the launch with explicit go or no-go checks so packaging, deployment, communication, and verification happen in the right order.
- Require an explicit owner go-decision before committing the production ship: a named owner or approver must issue a clear "go" for this specific release at this specific time. Prerequisite checks, artifact validation, and CI status satisfy readiness but do not substitute for an explicit human go-decision. Record the approver identity and the go-decision reference in the release record.
- Record the release state with launch evidence, live verification results, and any partial-rollout decision that affects downstream follow-up.
- Return a release record with next launch actions, rollback triggers, and the post-ship checks still required for a controlled rollout.
Required Contracts
- Before/After Evidence: Capture observable state before and after each intervention so improvements can be verified instead of asserted.
- Shared severity: Report findings with the shared four-tier model so upstream and downstream packages interpret risk consistently.
- Proactive triggers: Offer the next sensible action when the surrounding context clearly implies it and the skill can advance safely without a prompt loop.
- Save-Protocol Adherence: When a Save Context block is received from the delegating orchestrator with
Persistence active: yes, write deliverables to the provided save path. Saving is mandatory when persistence is active.
Collaboration Surface
- None required beyond the active task surface.
Review Expectations
- Base every launch decision on live verification evidence — health checks, smoke tests, rollout metrics — not on build-phase assertions.
- Surface rollback triggers and partial-rollout risks before the release advances past each gate.
- Shape the release record so post-ship follow-up and the
document-release skill can consume it directly.
Skip Rule
Skip only when the requested surface, tool, or environment does not exist and a safe fallback is unavailable.
Failure Modes
| Scenario | Response |
|---|
| The release candidate, launch window, or rollback plan is missing | Block the rollout and name the missing launch prerequisite explicitly. |
| No owner go-decision is present — prerequisites pass but no named approver has issued an explicit go | Hold the release; do not ship. Record the missing go-decision as a blocker and wait for a named owner to provide an explicit approval for this specific release. |
| Verification signals are incomplete or contradictory during rollout | Freeze the next launch step, preserve the current state, and decide whether to retry, pause, or roll back. |
| A required approval or external coordination step has not happened yet | Keep the release record in no-go state until the dependency is resolved instead of launching optimistically. |
| The rollout partially succeeds but leaves uncertainty about user impact | Record the partial state, define the rollback trigger, and keep follow-up actions explicit rather than implying a full ship. |
Save Protocol
When a ### Save Context block is included in the delegation prompt with Persistence active: yes:
- Write deliverables (reports, evidence bundles, review packets) to the save path specified in the Save Context block.
- Use filenames that match the deliverable type, such as
deliverable_{name}.md, report_{name}.md, or review-packet.md.
- Do not create or manage
_phase-state.md — that is the delegating orchestrator's responsibility.
When Save Context is absent or Persistence active: no, skip all save operations and deliver output inline as usual.
References
references/workflow.md for the detailed operating sequence and decision rules.
references/examples.md for concrete request patterns and response shapes.
Packaging Notes
Package SKILL.md, references/workflow.md, and references/examples.md together. Keep generated reports and archives outside the skill directory.