Skip to main content
DiegoNogueiraDev
GitHub クリエイタープロフィール

DiegoNogueiraDev

3 件の GitHub リポジトリにある 35 件の収集済み skills をリポジトリ単位で表示します。

収集済み skills
35
リポジトリ
3
更新
2026-07-24
リポジトリエクスプローラー

リポジトリと代表的な skills

graph-accessibility
ウェブ・デジタルインターフェースデザイナー

Accessibility compliance audit using WCAG 2.2 AA standards, ARIA validation, screen reader testing, keyboard navigation, color contrast analysis, and i18n readiness

2026-07-24
graph-analyze
プロジェクト管理専門家

Execute the ANALYZE phase of the lifecycle via the `agf` CLI — PRD creation, requirements, Definition of Ready (7 checks), cross-project learning

2026-07-24
graph-api-design
ソフトウェア開発者

API governance and design audit using OpenAPI/Swagger spec generation, REST maturity model, contract validation, and breaking change detection

2026-07-24
graph-architecture
ソフトウェア開発者

Architecture governance using C4 Model, ADR lifecycle, Architecture Fitness Functions, layer boundary enforcement, and drift detection

2026-07-24
graph-backlog-generation
プロジェクト管理専門家

Human-in-the-loop PLANNING skill — investigates the project (graph + git + harness/gaps) and runs the whole ANALYZE→DESIGN→PLAN chain in one faceted loop to produce a COMPLETE PRD injected as graph backlog (epics, tasks, testable AC) for a separate agent to implement. Applies the project's planning methodologies — Impact Mapping + OKR per epic, JTBD, MoSCoW, WSJF/Cost-of-Delay, User Story Mapping, Example Mapping (Rules/Examples → Given-When-Then AC), SPIDR splitting, INVEST, Definition of Ready, Risk Matrix; the full catalogue lives in the skill body. Stops for the human after each complete PRD and iterates the next cycle from the project's own findings (dogfood). Does NOT implement. Triggers — graph-backlog-generation, gerar backlog, criar PRD, planejar feature, detalhar épico, novo ciclo, "plan the next thing", "what should we build next".

2026-07-24
graph-bug-hunter
ソフトウェア品質保証アナリスト・テスター

Automated bug discovery through static analysis, LSP diagnostics, pattern detection, regression hotspot analysis, and error catalog mining

2026-07-24
graph-bugs
ソフトウェア品質保証アナリスト・テスター

Bug discovery + structured fix (5-Whys) with regression test, driven by the `agf` CLI — zero MCP

2026-07-24
graph-builder-leafcutter
ソフトウェア開発者

Use when an unblocked task exists in the agf graph and you want it built end-to-end — autonomously and perpetually — pulling the next task (WIP=1), investigating, implementing with TDD, learning, and selecting the next until the backlog is exhausted. Use right after graph-backlog-generation injects a backlog, or to make agf dogfood its own backlog. NOT for planning or writing a PRD (that is graph-backlog-generation). Triggers — graph-builder-leafcutter, leafcutter, golden-wren, build loop, implement the backlog, dogfood loop, continuous improvement, self-heal loop, loop de implementação, esgotar backlog, melhoria contínua.

2026-07-24
このリポジトリの収集済み skills 31 件中、上位 8 件を表示しています。
graph-backlog-generation
プロジェクト管理専門家

Human-in-the-loop PLANNING skill — investigates the project (graph + git + harness/gaps) and runs the whole ANALYZE→DESIGN→PLAN chain in one faceted loop to produce a COMPLETE PRD injected as graph backlog (epics, tasks, testable AC) for a separate agent to implement. Applies the project's planning methodologies — Impact Mapping + OKR per epic, JTBD, MoSCoW, WSJF/Cost-of-Delay, User Story Mapping, Example Mapping (Rules/Examples → Given-When-Then AC), SPIDR splitting, INVEST, Definition of Ready, Risk Matrix; the full catalogue lives in the skill body. Stops for the human after each complete PRD and iterates the next cycle from the project's own findings (dogfood). Does NOT implement. Triggers — graph-backlog-generation, gerar backlog, criar PRD, planejar feature, detalhar épico, novo ciclo, "plan the next thing", "what should we build next".

2026-07-19
graph-builder-leafcutter
ソフトウェア開発者

Use when an unblocked task exists in the agf graph and you want it built end-to-end — autonomously and perpetually — pulling the next task (WIP=1), investigating, implementing with TDD, learning, and selecting the next until the backlog is exhausted. Use right after graph-backlog-generation injects a backlog, or to make agf dogfood its own backlog. NOT for planning or writing a PRD (that is graph-backlog-generation). Triggers — graph-builder-leafcutter, leafcutter, golden-wren, build loop, implement the backlog, dogfood loop, continuous improvement, self-heal loop, loop de implementação, esgotar backlog, melhoria contínua.

2026-07-19
3 件中 3 件のリポジトリを表示
すべてのリポジトリを表示しました