| description | Resolve a shipped-order discrepancy — customer received different items than Katana recorded. Pull the customer-facing record, locate the linked Katana SO/MO, decide whether a BOM-driven split is needed (when an assembled good shipped as its component parts), then apply correct_manufacturing_order + correct_sales_order with operator-judgment gates between phases. Verify against the source of truth at the end. |
| argument-hint | [order id from source-of-truth system] |
| allowed-tools | ["mcp__katana-erp__get_sales_order","mcp__katana-erp__get_manufacturing_order","mcp__katana-erp__get_manufacturing_order_recipe","mcp__katana-erp__list_sales_orders","mcp__katana-erp__correct_manufacturing_order","mcp__katana-erp__correct_sales_order","mcp__katana-erp__modify_manufacturing_order","mcp__katana-erp__modify_sales_order","mcp__katana-erp__check_inventory","mcp__katana-erp__create_stock_adjustment"] |
/correct-shipped-build — shipped-order discrepancy resolution
PURPOSE
When a customer received different items than Katana recorded — wrong
ingredient on a finished good, wrong line item on a sales order, or a
finished good that shipped as its components — restore Katana to ground
truth without losing the original close-state metadata (done_date,
picked_date, per-production timestamps, fulfillment tracking).
CRITICAL
- Ground truth is the customer-facing record, not Katana. Pull the
Shopify / e-commerce / fulfillment-system order first; treat it as
authoritative. Don't assume Katana's recorded fulfillment is right —
this skill exists because it isn't.
- Preview every correction before applying. Both
correct_manufacturing_order
and correct_sales_order default to preview=true for a reason. The
operator should read the planned action list and confirm before any
mutations land.
- Both MO and SO may need correction, in this order. When a finished
good's recipe was wrong (consumed the wrong ingredient), fix the MO
first — that's the upstream truth. Then fix the SO if its line items
also drifted. SO line items can reference variants the MO produced, so
MO-first is the safer order.
- Inventory side-effects belong to a separate decision. If the
finished good was disassembled mid-fulfillment — i.e. an assembled
good was broken into its BOM components and shipped as parts — the
MO/SO corrections alone don't reshuffle inventory. That's
split_via_bom's job. Don't conflate the two; decide explicitly
whether a split is needed.
STANDARD PATH
Phase 1 — Pull the source-of-truth record
Ask the operator for the source-system order id (Shopify order, etc.).
Read the customer-facing record and write down what actually shipped:
SKUs, quantities, condition / assembly state. This is the expected
state every later phase compares against.
If you have a Chrome tab or other tool already open on the order, use it.
Otherwise the operator may need to open it manually and read off the
relevant fields.
Phase 2 — Locate the linked Katana SO and MO
list_sales_orders(customer_id=..., delivered_after=..., delivered_before=...)
Filter by customer name + delivery date window to find the candidate SO.
Once you have the SO id:
get_sales_order(order_id=...)
Inspect:
- SO line items — what Katana thinks shipped
linked_manufacturing_order_id on each row — the upstream MO, if any
If a row has a linked MO:
get_manufacturing_order(order_id=...)
Note the MO's variant_id (the finished good) and the status (DONE /
PARTIALLY_COMPLETED).
get_manufacturing_order defaults to include_rows="blocking", which
hides recipe rows whose ingredients are in stock. To inspect the full
recipe before deciding what to correct, fetch the dedicated recipe view:
get_manufacturing_order_recipe(manufacturing_order_id=...)
This returns every recipe row regardless of ingredient-availability
status — that's what you want when figuring out which row consumed the
wrong variant.
Phase 3 — Decide whether a split is needed
A split means: the finished good produced by the MO was disassembled
into its BOM components before shipment, and the customer received the
components instead of the assembled good.
Operator-judgment criteria:
- The customer-confirmed item list (phase 1) lists individual component
SKUs instead of the assembled SKU.
- The MO produced a single assembled good, but the SO's line item now
needs to reference component SKUs.
- The warehouse / fulfillment notes confirm the split.
If yes, plan to use split_via_bom in phase 6. If no, skip phase 6.
If split_via_bom is not yet shipped (issue #543 still open at the time
of writing), document the intended split — finished-good variant id,
location id, quantity, and the timing — and proceed without it. The
MO/SO corrections still land cleanly; the inventory reshuffling can be
applied as a follow-up when the tool ships.
Phase 4 — Correct the MO (if the recipe was wrong)
If the MO consumed the wrong ingredient (e.g., the wrong variant of a
component, or an incorrect quantity per unit):
correct_manufacturing_order(
id=...,
ingredient_changes=[
{
old_variant_id: <variant currently on the recipe row>,
new_variant_id: <variant that was actually consumed>,
planned_quantity_per_unit: <if changed; otherwise omit>,
},
...
],
preview=true,
)
Review the planned action sequence — revert → recipe edit → recreate
production → re-close with backdated done_date / production_date.
Confirm the captured close-state matches reality. Then re-call with
preview=false.
The tool requires the MO to be in DONE or PARTIALLY_COMPLETED
status. If it's still IN_PROGRESS, use modify_manufacturing_order
directly — there's no close-state to preserve.
Phase 5 — Correct the SO (if line items were wrong)
If the SO's line items don't match what the customer received:
correct_sales_order(
id=...,
line_changes=[
{
old_variant_id: <variant currently on the row>,
new_variant_id: <variant actually shipped>,
quantity: <if changed; must be ≥ already-fulfilled qty>,
price_per_unit: <if changed>,
},
...
],
preview=true,
)
Preview surfaces the planned action sequence — delete fulfillments →
revert → row edits → re-add fulfillments with original picked_date →
re-close. Confirm and re-call with preview=false.
correct_sales_order only updates rows in place. If you need to add
or remove a line item entirely, use modify_sales_order directly —
the close-state restore would otherwise lose the row-id mapping the
fulfillments depend on.
Phase 6 — Apply the BOM-driven split (if decided in phase 3)
Status: deferred. The split_via_bom tool isn't shipped yet
(issue #543). It's intentionally not listed in this skill's
allowed-tools so the skill can load and run today; when the tool
ships, add mcp__katana-erp__split_via_bom to the allowlist and
remove this status callout.
When split_via_bom ships, the call shape will be:
split_via_bom(
variant_id=<finished good>,
location_id=<where the inventory transformation happened>,
quantity=<how many were split>,
stock_adjustment_date=<just before the customer's delivery date>,
preview=true,
)
It generates a single mixed-sign stock adjustment: -quantity of the
finished good, +(quantity × planned_quantity_per_unit) of each BOM
ingredient, cost-balanced to net zero.
Until then: file a follow-up issue documenting the intended split
parameters (finished-good variant id, location id, quantity, timing)
and skip this phase. The MO/SO corrections still leave the records in
the right shape; only the inventory reshuffling is deferred.
Phase 7 — Verify
Re-fetch the corrected records:
get_manufacturing_order(order_id=...)
get_sales_order(order_id=...)
Confirm the close-state restored cleanly: status back to its original
value, dates backdated to the originals, no new "today" timestamps
sneaking in.
Sanity-check inventory on the affected SKUs:
check_inventory(skus_or_variant_ids=[...])
Expected vs. actual stock levels should reconcile against the customer-
confirmed shipment. Negative availability is a red flag — it means the
correction over-corrected somewhere.
Phase 8 — Summarize
Report to the operator:
- Source-system order id — what was being corrected.
- Katana SO and MO ids — links to the corrected records.
- Changes applied — MO recipe rows swapped (with variants), SO line
items updated, split applied (yes/no, with parameters).
- Inventory delta — affected SKUs and the qty change at each.
- Verification — the inventory-check result and any flagged
anomalies.
- Deferred work — if
split_via_bom wasn't available, the
follow-up issue or manual adjustment that's still needed.
EDGE CASES
- No linked MO on the SO — the SO is for a purchased finished good,
not a manufactured one. Skip phase 4 entirely; only the SO needs
correction.
- MO is
IN_PROGRESS — correct_manufacturing_order will refuse.
The MO hasn't shipped yet, so there's no close-state to preserve. Use
modify_manufacturing_order directly.
- Same variant appears on multiple recipe rows / SO rows — the
correction tools refuse on ambiguity. Use
modify_manufacturing_order
/ modify_sales_order with the explicit row id, or split the
correction into two passes that disambiguate by other means.
- New row quantity below the already-fulfilled quantity —
correct_sales_order preflight refuses. Either keep the original
quantity, or fix the fulfillment record manually first.
- Inventory goes negative after corrections — the corrections
over-shot. Likely cause: the MO/SO drift was only a partial
representation of what shipped, and the rest needs a stock adjustment
or a parallel correction on a sibling SO. Don't paper over with a
goodwill stock adjustment without understanding the root cause.
- Customer received a superset (got extras) — corrections alone
won't capture this. Either confirm a picking-error / goodwill add-on
with the warehouse, or treat the extras as a separate incident.
RELATED
- PR #536 —
correct_manufacturing_order, correct_sales_order
- Issue #543 —
split_via_bom (BOM-driven inventory split, pending)
- Issue #523 — Closed-record corrections umbrella
- Issue #532 —
correct_purchase_order (separate workflow; not used here)