Skip to main content
Manusで任意のスキルを実行
ワンクリックで
nesquena
GitHub クリエイタープロフィール

nesquena

1 件の GitHub リポジトリにある 13 件の収集済み skills をリポジトリ単位で表示します。

収集済み skills
13
リポジトリ
1
更新
2026-07-20
リポジトリマップ

skills がある場所

収集済み skill 数が多いリポジトリを、このクリエイターカタログ内の比率と職業範囲とともに表示します。

リポジトリエクスプローラー

リポジトリと代表的な skills

issue-capture
ソフトウェア開発者

Capture issue-shaped reports that have not reached the tracker yet. Divert suspected vulnerabilities, dedupe across every surface, and stage genuinely new actionable items in the pre-tracker queue. Never files or replies on the public tracker. Watcher role, Band A.

2026-07-20
action-watchdog
ソフトウェア開発者

Independently fact-check the autonomous actions the system took (issue closes, labels, capture marks, etc.) against live ground truth, and alarm on any mismatch. Run on a schedule. This is what makes Band-A public actions safe.

2026-07-20
issue-triage
ソフトウェア開発者

Triage tracker issues — initial reply under a confidence gate, label, milestone, sprint-candidate, and the dropped-ball "reporter waiting on us" surfacer. Use for ongoing issue-tracker hygiene.

2026-07-20
pr-deep-review
ソフトウェア品質保証アナリスト・テスター

Deep-review a routed PR and run the authoritative quality gate before merge. Reads the whole diff, reproduces, runs the layered gates fresh, bounces with a fix-spec or fixes mechanical blockers. Stages 3-4 of the PR lifecycle.

2026-07-19
pr-triage
ソフトウェア品質保証アナリスト・テスター

Screen and route an open pull request — fit/scope screen, marginal-benefit screen, and lane routing. Use at the front of the PR pipeline before any deep review. Stages 0-2 of the PR lifecycle.

2026-07-19
contributor-trust
ソフトウェア開発者

Aggregate the contributor trust ledger into a shrunk-and-decayed reliability score that weights review priority and gate intensity — never a reason to skip a gate. Band A, no LLM: classification happens upstream at close, this is arithmetic over an existing event log.

2026-07-19
release-pipeline
ソフトウェア開発者

Merge an all-clear PR and ship it — rebase, merge preserving attribution, tag, deploy, verify it's actually live, close PR/issues with credit, update the trust ledger. Stages 5-6 of the PR lifecycle. Runs only after pr-deep-review's gate is all-clear.

2026-07-19
triage-scoreboard
ソフトウェア開発者

Compute and render the living, ranked triage board of open work — mechanical + judgment dimensions into a composite rank, with evidence-readiness tags. Run on a schedule so the board is always current.

2026-07-19
このリポジトリの収集済み skills 13 件中、上位 8 件を表示しています。
1 件中 1 件のリポジトリを表示
すべてのリポジトリを表示しました