ワンクリックで
en50128-lifecycle-phase-checklists
Per-phase gate checklists (Phase 1–9) with SIL-annotated criteria for all COD gate-check operations
Codex または Claude でインストール この Prompt をコピーして Codex、Claude、または他のアシスタントに貼り付けると、Skill ページを確認してインストールできます。
メニュー
Per-phase gate checklists (Phase 1–9) with SIL-annotated criteria for all COD gate-check operations
Codex または Claude でインストール この Prompt をコピーして Codex、Claude、または他のアシスタントに貼り付けると、Skill ページを確認してインストールできます。
SOC 職業分類に基づく
Project management and coordination for EN 50128 railway software development
Project management and coordination for EN 50128 railway software development
Software quality assurance techniques and auditing for EN 50128 railway software
Software testing methodologies with coverage analysis for EN 50128 C programs using Unity test framework
Software verification with static analysis and coverage for EN 50128 railway software per Section 6.2
V&V Manager coordination and independent V&V authority for SIL 3-4 EN 50128 projects
| name | en50128-lifecycle-phase-checklists |
| description | Per-phase gate checklists (Phase 1–9) with SIL-annotated criteria for all COD gate-check operations |
| license | Proprietary |
| compatibility | opencode |
| metadata | {"standard":"EN 50128:2011","domain":"railway-software","role":"lifecycle-coordinator"} |
Load trigger: Load at the start of any @cod gate-check <phase> or @cod start-phase <phase>.
Apply only the section for the target phase; the others are reference.
Deliverables for each phase: see DELIVERABLES.md (Annex C Table C.1) and
activities/phase-N-*.yaml §gate_check §criteria. These checklists cover quality,
technique, and SIL-specific criteria not captured in the deliverables matrix.
Quality criteria:
Team organization:
ORGANIZATION.md for SIL-tiered charts)SIL-specific:
Requirements quality:
Traceability:
Safety:
EN 50128 Table A.2 techniques:
SIL-specific:
Architecture quality:
Design quality (C-specific):
Traceability:
Safety design:
EN 50128 Table A.3 techniques:
SIL-specific:
Design quality:
SIL-specific:
Code quality (C-specific):
Static analysis (MANDATORY SIL 3–4; HR SIL 2):
Unit testing:
Code review (MANDATORY all SIL levels):
Traceability:
EN 50128 Table A.4 techniques:
Integration execution:
Integration testing:
Traceability:
EN 50128 Table A.6 techniques:
SIL-specific:
Validation testing:
Requirements validation:
Independence (SIL 3–4):
Customer acceptance:
EN 50128 Table A.7 techniques:
SIL-specific:
Independence (MANDATORY SIL 1–4 per §6.4.1.1; exempt SIL 0 per §6.4.1.2):
Assessment activities:
Findings:
Safety Authority:
Release package:
Deployment:
Maintenance:
Configuration management: