Parallel Execution
Overview
Execute independent tasks simultaneously in isolated Git worktrees when the saved time justifies coordination overhead.
Announce: "I'm using the parallel-execution skill to run independent tasks in parallel."
Core principle: Parallel only works when tasks are truly independent. One shared file = sequential.
Reference Router
- Decide whether parallelism is allowed and worthwhile: prerequisites and selection
- Analyze files, group dependencies, preview worktrees, dispatch, integrate, and verify: process
- Counter unsafe shortcuts or optimistic independence claims: red flags
Load the full process only after the selection gate passes. Every parallel stream must use an isolated worktree or equivalent isolated workspace; if isolation is unavailable, execute sequentially.
Mandatory Gates
- Selection gate: Require a Git repository, 2+ independent execution streams,
clean state,
gitWorkflow.allowWorktree: true, and time savings greater than
coordination overhead. No unresolved blocker or dependency may remain.
- UI scale-out gate: For UI-bearing streams, the first vertical slice must be
verified against the real provider, the experience baseline must be
VALIDATED, every stream must pin the same contract version, and mock-only
evidence cannot satisfy the gate.
- Independence gate: Inspect actual target files and semantic dependencies
pairwise. Shared files, schemas, generated artifacts, migrations, lockfiles,
sequential contracts, or integration ordering stay in one sequential stream
with a single writer. Schedule only
Blocked by: None or verified dependencies.
- Preview gate: Route remote, base, branch, clean-state, and worktree commands through
git-workflow-operation. Each parallel stream uses its own branch and workspace; never modify the main worktree during parallel work.
- Dispatch gate: Give each agent its workspace, branch, ordered tasks, FSD/issue authority, verification contract, and required orchestration skill. Tasks inside one dependency group remain sequential.
- Approval gate: Never remove a worktree until its resolved target path is validated and the user approves. Preview merge, rebase, cleanup, push, and PR operations before mutation.
- Conflict gate: Never auto-resolve conflicts. A conflict invalidates the independence assumption; resolve manually and rerun the full suite.
- Integration gate: Inspect every branch, integrate using the FSD strategy,
then run full tests, contract/fixture/provider/consumer checks, and
verification-before-completion. Do not claim completion without
merged-system integration verification.
Integration
Used by executing-plans in swarm mode. Use git-workflow-operation, subagent-orchestration, and verification-before-completion for workspace safety, task execution, and final integration.