| name | division-11-equipment-bid-scope |
| description | Whole-division starter rules for CSI Division 11 - Equipment. Use when starting, triaging, validating, or packaging a commercial equipment bid. |
Division 11 - Equipment Bid Scope
Company: Your Company
CSI division(s): 11
Spec section hints: 11 00 00, 11 10 00, 11 30 00, 11 40 00, 11 52 00, 11 53 00, 11 70 00
Scope Rule
Base bid is limited to CSI Division 11 - Equipment work specifically assigned to the bidder: commercial, foodservice, loading dock, laboratory, athletic, and other facility equipment. Utility rough-ins, structural supports, controls, owner-furnished equipment, and commissioning must be explicitly included, excluded, or flagged before pricing.
Base Scope
- commercial equipment when assigned
- foodservice equipment when assigned
- loading dock equipment when assigned
- laboratory equipment when assigned
- athletic and recreational equipment when assigned
- equipment anchorage when assigned
- startup assistance when assigned
Terms That Usually Identify This Scope
- equipment
- foodservice
- appliance
- dock leveler
- laboratory equipment
- athletic equipment
- washer
- dryer
- 11 00
Adjacent Scope To Exclude By Default
- electrical wiring
- plumbing piping
- gas piping
- structural steel
Adjacent Scope To Flag Before Pricing
- owner furnished
- rough-in
- startup
- warranty
- anchorage
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-11-equipment.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-11-equipment before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.