Division 31 - Earthwork Bid Scope
Company: Your Company
CSI division(s): 31
Spec section hints: 31 00 00, 31 10 00, 31 20 00, 31 23 00, 31 25 00, 31 31 00, 31 50 00
Scope Rule
Base bid is limited to CSI Division 31 - Earthwork work specifically assigned to the bidder: clearing, grading, excavation, fill, compaction, dewatering, earth retention, and subgrade preparation. Site utilities, paving, concrete, landscaping, contaminated soils, rock removal, and survey must be explicitly included, excluded, or flagged before pricing.
Base Scope
- site clearing when assigned
- mass excavation and grading
- trenching and backfill when assigned
- fill and compaction
- subgrade preparation
- dewatering when assigned
- earth retention when assigned
Terms That Usually Identify This Scope
- earthwork
- excavation
- grading
- fill
- backfill
- compaction
- subgrade
- dewatering
- 31 00
Adjacent Scope To Exclude By Default
- site utility
- asphalt paving
- concrete paving
- landscaping
- irrigation
Adjacent Scope To Flag Before Pricing
- rock
- unsuitable soils
- dewatering
- erosion control
- survey
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-31-earthwork.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-31-earthwork before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.