| name | plan-work |
| model | opus |
| description | PLANNING SPINE STEP 3 of 3 — Plan the work: write detailed implementation tasks into the active epic capsule (specs/epics/eNN-slug/). Produces countable-story-format .md specs and runnable -tasks.yaml files. Use after slice-tasks (step 2). Not a substitute for scope-work (step 1) or slice-tasks (step 2). |
story: e45s29
Plan Work
Spine position: Step 3 — scope-work → slice-tasks → plan-work.
Produce a detailed, verifiable implementation plan in the active epic capsule directory (specs/epics/eNN-slug/). Output: a story spec .md file (countable-story-format) and a decoupled eNNsYY-tasks.yaml with runnable verify commands. "I think it works" is not a step.
HARD GATE — Do NOT proceed with a plan until the task's success criteria are clear. If success is ambiguous, run define-success first to convert the task into "step → verify: " pairs.
RECURSIVE DISCIPLINE — This lifecycle applies to EVERY task, including updating these skills. Never skip planning because a task is "meta" or "just documentation."
Pre-flight
Read: release-plan.yaml, product/SCOPE_LATEST.yaml, active epics/<capsule>/epic.yaml, tech-architecture/tech-stack.md, product/GLOSSARY_LATEST.yaml.
ZOOM-OUT MANDATE (v1.17.0) — If modifying an existing module: (1) State the module's purpose. (2) Name its callers. (3) List its contracts. Cannot answer all three? Stop — scope is misunderstood.
If this plan touches an existing module, run assess-impact first to understand blast radius.
DISCOVERY MANDATE (v1.18.0) — For external API integration, verify the API signature via local docs or search and quote at least one technical detail in the step's context.
MULTIPLE INTERPRETATIONS (HARD GATE) — If the task admits ≥2 valid interpretations, list them and get a user decision before drafting any steps.
COMPLEXITY PUSHBACK (HARD GATE) — Every new abstraction MUST include a one-sentence "Reason for Depth." If it can't be filled non-trivially, the abstraction is premature — use inline code instead.
SLOPCHECK (HARD GATE) — For every external package, tag it [OK], [SUS], or [SLOP]. [SUS]/[SLOP] require human approval before execution.
Invocation modes
- Default: full plan with zoom-out mandate, impact assessment, slopcheck
--fast: Skip zoom-out and impact assessment. Use for tasks under 3 BCPs with no module interface changes.
Process
Timing: bash scripts/bp-timing.sh start plan-work at invocation; bash scripts/bp-timing.sh end plan-work before handoff.
-
Explore — Use Explore subagent to understand affected modules, existing test patterns, similar prior art, and dependencies.
-
Draft steps — Break implementation into the smallest possible steps where each step leaves the codebase working, has one observable outcome, and can be verified with a single command. Red-flag check: name any rationalization you caught before moving to step 3.
-
Write capsule story spec + tasks — Output two files inside the active epic capsule. See REFERENCE.md for file formats and the plan-template. Each task MUST include a risk: field (P0 | P1 | P2 | P3) based on BCP + story type heuristics (see REFERENCE.md). If a test plan artifact (specs/tech-architecture/eNN-TEST_PLAN_LATEST.md) exists, read it and inherit its P0/P1 risk classifications and scenario IDs (SC-eNNsYY-P0-NN). Each task optionally includes a security: field (none / low / medium / high) sourced from the epic's specs/security/epics/<id>/THREAT_MODEL.md. Tasks with security: medium or security: high MUST include "no new security findings in affected paths" in their verify steps. Each task should also include an allure: block to drive test reporting: severity: maps risk to Allure severity (P0→critical, P1→high, P2→normal, P3→minor), and categories: is a list of relevant tags like "Security Review", wave names, or test categories (see REFERENCE.md for the full template).
Requirement delta tags (e45s29): When a story modifies existing behavior, the story spec § Requirements MUST use OpenSpec-style delta tags with mandatory before/after content:
| Tag | When | Required content |
|---|
ADDED | New requirement | Full requirement text |
MODIFIED | Changed behavior | Before: prior behavior · After: new behavior |
REMOVED | Retired requirement | Before: what existed · After: (removed) + rationale |
RENAMED | ID or title change only | Before: old ID/title · After: new ID/title |
Net-new stories (greenfield) use ADDED only. MODIFIED/REMOVED/RENAMED without before/after blocks fail the plan-work gate.
-
Verify step format — Every step MUST follow: N. <What to do> → verify: <runnable command>. See REFERENCE.md for good/bad examples.
4a. Cross-artifact consistency pass (HARD GATE — e45s04) — Before handoff, run:
bash scripts/lib/plan-consistency-check.sh specs/epics/<capsule>/
Print CRITICAL / HIGH / MED findings. CRITICAL or HIGH blocks code generation — fix capsule artifacts first. MED requires explicit user acknowledgment.
4b. tasks.yaml failing ledger (e45s06) — Every new task entry starts with status: failing. Only flip to status: passing after its verify: command exits 0 during develop-tdd or verify-work. Never pre-mark passing at plan time.
- Review with user — Confirm step order, granularity, and that verify commands are runnable in this project.
Lifecycle Gates (e45s09)
| Gate | When | Pass condition |
|---|
| Pre-Implementation | Before kickoff-branch / first RED commit | Root-cause stated for bugs; assess-impact done for module changes; plan-consistency-check PASS |
| Validation | Story marked done | All tasks status: passing; verify evidence in specs/verifications/ |
| Reopen-don't-refile | Regression on shipped story | Reopen existing story/bug — do not create duplicate capsule entries |
After writing capsule tasks, suggest kickoff-branch (if not already on a feature branch) then build-epic, execute-plan, or develop-tdd.
Verify
→ verify: test -f scripts/lib/plan-consistency-check.sh && bash scripts/lib/plan-consistency-check.sh specs/epics/e45-quality-core/ 2>&1 | head -5
Handoff
Gate: READY -> next: kickoff-branch
Writes: state.yaml handoff.next_skill = kickoff-branch
Plan Work — Reference
Navigation
| Lines | Section |
|---|
| 1 | Title |
| 3–14 | Navigation |
| 16–38 | Output file formats |
| 40–71 | Plan template |
| 73–91 | Verify step format rules |
| 93–131 | Sub-operations (risk, define-success, zoom-out, slopcheck, delta tags) |
Output file formats
Story spec: specs/epics/<capsule>/eNNsYY-<slug>.md
Populated countable-story-format with all 20 sections. Minimum maturity: 3 (Countable). Acceptance criteria in §17.
Task checklist: specs/epics/<capsule>/eNNsYY-tasks.yaml
story_id: e01s01
title: Login
status: failing
bcps: 3
tasks:
- id: 1
description: "Add login form component tests"
verify: "npm test -- login-form.test.tsx"
risk: P1
status: failing
allure:
severity: high
categories:
- "Auth"
- "Security Review"
Allure severity mapping:
P0 → critical
P1 → high
P2 → normal
P3 → minor
categories is a list of relevant tags — wave names, test categories (e.g. "unit", "integration"), or thematic groupings (e.g. "Security Review").
Update specs/epics/<capsule>/epic.yaml manifest to list the story and its BCPs. Run bash scripts/sync-status-from-epics.sh after structural changes.
Plan template
### Story [X.Y]: [title] — Implementation Steps
**type:** feat | fix | refactor
**risk:** P0 | P1 | P2 | P3
**context:** domain | infra
**Context**: [One paragraph: what this story implements and why]
## Steps
1. [Step description] (ref: ADR-NNNN or commit SHA) → verify: `<runnable command>`
2. [Step description] (ref: ADR-NNNN or commit SHA) → verify: `<runnable command>`
...
## Verification Script (Step-by-Step)
[A human-readable, step-by-step script for the user to verify the story's outcome.]
1. [Action 1: e.g. Start the server]
2. [Action 2: e.g. Open browser to http://localhost:3000]
3. [Observation: e.g. Verify that the login modal appears]
## Out of scope
- [Explicit exclusions]
## Risks
- [Anything that could go wrong and how to detect it early]
Verify step format rules
Every step MUST follow this exact format:
N. <What to do> → verify: <runnable command that proves it worked>
Good examples:
1. Add User model with email and name fields → verify: npm test -- user.test.ts
2. Add POST /users endpoint → verify: curl -s -X POST http://localhost:3000/users -d '{"email":"a@b.com"}' | jq .id
3. Add email uniqueness constraint → verify: npm test -- user-uniqueness.test.ts
Bad examples (no verify command):
1. Implement the user creation flow
2. Write tests for the API
Sub-operations
Risk Assignment Heuristics
Every task and story MUST be assigned a risk: level (P0, P1, P2, P3). When specs/tech-architecture/eNN-TEST_PLAN_LATEST.md exists for the epic, defer to its scenario risk mapping (SC-eNNsYY-P0-NN). Otherwise, apply these heuristics based on BCP and story type:
- P0: Critical path, data loss risk, auth/security boundary, external integration, or high BCP (≥ 5).
- P1: Core feature logic, state mutations, standard business value (BCP 3-4).
- P2: Utility functions, UI layout changes, display-only data, low risk (BCP 2).
- P3: Documentation, cosmetic tweaks, CSS variables, zero behavioral change (BCP 1).
verify-work scales its UAT depth based on this field.
Requirement delta tags (e45s29)
When modifying existing behavior in story spec § Requirements:
#### MODIFIED: User can reset password via email link
**Before:** Password reset required admin approval.
**After:** Self-service reset via signed email link (expires 1h).
#### REMOVED: Legacy OAuth1 login
**Before:** OAuth1 provider supported for enterprise SSO.
**After:** (removed) — provider deprecated; OAuth2 only.
Tags: ADDED, MODIFIED, REMOVED, RENAMED. MODIFIED/REMOVED/RENAMED without before/after → plan-work gate FAIL.
Define Success
Before planning, convert task statements into observable "step → verify: " pairs:
- Break the task into observable outcomes (behaviors) rather than implementation steps
- Write pairs in the format:
[What must be true] → verify: <runnable command>
- Challenge completeness: are all required behaviors covered?
- Get user confirmation: "Does this capture everything the task requires?"
- Once confirmed, these pairs become the skeleton for plan-work steps
Zoom-Out Check
When modifying an existing module, confirm scope is understood:
- State the module's purpose — what is it responsible for?
- Name the callers — who depends on it?
- List the contracts — what invariants or interfaces must be preserved?
If you cannot answer all three without deep code archaeology, scope is misunderstood. Clarify with the user before writing steps.
Slopcheck
For every external package proposed in the plan, tag each with one of:
[OK] — package is mature, actively maintained, appropriate scope
[SUS] — suspiciously broad, has maintenance concerns, or unclear fit
[SLOP] — unmaintained, known security issues, or out of scope
[SUS] and [SLOP] require explicit human approval before the step may execute. Document tags inline next to the package name.