| name | ship |
| description | Ship a validated change to production - sequences observability and a staged rollout, then gates the outward-facing deploy behind a final go/no-go. Usage /groundwork:ship |
| allowed-tools | ["Bash","Read","Skill","AskUserQuestion"] |
| requires | instrument-observability, staged-rollout |
| disable-model-invocation | true |
Ship
Orchestrator for the ship phase — the last leg of the lifecycle, after the change is built, validated, and reviewed. It sequences the ship disciplines and stops at a human go/no-go before anything reaches users.
Step 1: Confirm Validation and Review Passed
Shipping presupposes a clean change. Confirm both gates already cleared:
- Validation passed — see [[validate]].
- Review passed — see [[review-pr]].
Check for evidence (a green validation run, an approved PR). If you cannot confirm either, stop and ask the user to run [[validate]] / [[review-pr]] first. Do not re-run them here; this skill assumes they are done.
Step 2: Sequence the Ship Disciplines
Dispatch the two disciplines in order via the Skill tool. Each is dual-tier, so this leaf may call them. Do not parallelize — the rollout depends on the instrumentation.
(Architecture decisions are recorded earlier, during design-architecture — there is no decision-capture step here.)
Skill(skill="groundwork:instrument-observability") — make the change observable (structured logs, RED metrics, trace spans, symptom alerts). Run before rollout: the rollout's monitoring window watches these signals.
Skill(skill="groundwork:staged-rollout") — produce the pre-launch checklist, feature-flag gating, the staged/canary ramp, and the written rollback plan.
Carry each skill's verification result forward. If any reports its Verification incomplete, surface that to the user at Step 3 rather than silently proceeding.
Step 3: Final Go / No-Go Gate
Before any outward-facing deploy step (flipping the canary flag on, promoting a stage, releasing), stop and ask the user with AskUserQuestion:
{
"questions": [{
"question": "Validation and review passed. Observability instrumented, staged rollout plan and rollback ready. Proceed to begin the rollout?",
"header": "Go / No-Go",
"options": [
{ "label": "Go", "description": "Begin the staged rollout starting at the canary stage" },
{ "label": "No-Go", "description": "Stop — something needs attention first" }
],
"multiSelect": false
}]
}
- No-Go → stop. Report what's outstanding; do not deploy.
- Go → proceed to begin the staged rollout (the canary stage) per the plan from Step 2. Never skip this gate, even if every prior step is green — a human owns the decision to expose the change to users.
Verification