| name | metric-lock |
| description | Use when evaluation metrics, protocol, datasets, or splits have been confirmed in the research plan — enforces immutability of locked evaluation components without explicit user authorization |
Metric Lock (Discipline Layer)
Overview
Changing evaluation metrics after confirmation is not optimization — it is goalpost-moving. This skill activates after plan freeze (G2) and remains in effect until project end.
Core principle: Locked means locked. No silent modifications.
Violating the letter of this rule is violating the spirit of this rule.
The Iron Law
EVALUATION METRICS, ONCE CONFIRMED, ARE IMMUTABLE WITHOUT USER PERMISSION
What Is Locked
After G2 plan freeze, the following are immutable:
- Primary metrics (e.g., F1, BLEU, AUC)
- Evaluation protocol (e.g., k-fold, held-out test, leave-one-out)
- Datasets and splits (train/val/test partitions, exact files)
- Random seeds
- Baseline list and their configurations
What Is Allowed
Secondary/supplementary metrics may be added for additional analysis. They cannot replace primary metrics and cannot be used to override primary metric conclusions.
Change Request Process
IF you believe a locked item must change:
1. EXPLAIN: What exactly needs to change?
2. JUSTIFY: Why is the current version flawed?
3. PROVE: Show evidence the locked version is defective (not just suboptimal)
4. WAIT: User decides — not you
5. LOG: Record old value, new value, reason in change_log
Skip any step = unauthorized modification = academic misconduct
Red Flags — STOP
- Quietly changing evaluation script parameters
- Reporting a different metric than the one locked
- Weakening baseline configuration after seeing results
- Using a different data split than specified
- Rounding, clipping, or post-processing metrics differently than protocol
- "Forgetting" a baseline that was performing well
Rationalization Prevention
| Excuse | Reality |
|---|
| "This metric isn't quite right" | You argued for it in Phase 3. To change, go through the change request process. |
| "A different metric shows better results" | That's exactly why changing is forbidden. |
| "The community now prefers X" | If true, convince the user. Don't change silently. |
| "Just adding a supplementary metric" | Adding secondary is fine. Replacing primary is not. |
| "The baseline used a different metric" | Adapt the baseline, don't change your protocol. |
| "It's a minor adjustment" | Minor adjustments to locked items require user approval. Always. |
| "The metric has a known limitation" | All metrics do. Document the limitation; don't swap the metric. |
The Bottom Line
Locked item + no user approval = do not touch
Unauthorized modification of evaluation components is academic misconduct. No exceptions.