| description | Runs the implementation team from a finished research report — reads IMPLEMENTATION-PLAN.md (phases, file ownership, acceptance criteria) and the SUMMARY with ADRs, spawns teammates by phase (sequential or parallel), and verifies the result via build/typecheck/tests. On completion, **automatically writes a single EvidencePack via forgeplan MCP** (`mcp__forgeplan__forgeplan_new` + `forgeplan_update` + `forgeplan_link`) so the build lands in the artifact graph — no manual step required (CLI fallback if MCP not connected; explicit warning if neither available, never a silent skip). Use when research is already done (via research or manually) and only "execute the plan" is left. Triggers (EN/RU) — "build from research", "execute IMPLEMENTATION-PLAN", "implement based on research report", "имплементируй по research", "выполни план", "/build". |
| origin | forgeplan |
Build from Research
Turns a finished research report with IMPLEMENTATION-PLAN.md into real code.
Does not do research itself — it expects the artifacts to already exist. Builds
on team.
Project Context (read first)
If /setup has been run in the project, concrete commands and paths live in:
@docs/agents/build-config.md — build/test/lint/typecheck commands (the
primary input for this skill)
@docs/agents/paths.md — where research reports live and where new code goes
Check via test -f docs/agents/build-config.md. If present — use those commands
instead of the pnpm/cargo examples below. If not — auto-detect via
package.json / Cargo.toml / go.mod / pyproject.toml / Makefile.
Never hardcode pnpm/cargo/npm — pick the runtime by project files.
When to Use
research finished and saved IMPLEMENTATION-PLAN.md.
- An external research-pack with a finished plan (phases, files, acceptance
criteria) was received.
- The user said: "build from research/reports/X", "выполни план",
"имплементируй по research-у".
When Not to Use
- Research not done yet — start with
research.
- No plan, only an idea — use
sprint (it does its own
research).
- Code review needed — use
audit.
Prerequisites
$ARGUMENTS = path to the research report directory. Inside it MUST contain:
| File | Purpose |
|---|
IMPLEMENTATION-PLAN.md | Phases + file ownership + LOC estimates + acceptance criteria |
00-SUMMARY.md (or SUMMARY.md) | Executive summary + ADRs |
CONTINUATION-PROMPT.md | (optional) Stage-by-stage prompts, useful for long pipelines |
If IMPLEMENTATION-PLAN.md is missing — tell the user, suggest:
- Run research first (
research).
- Or build the plan manually (
sprint, Step 2).
Process
Step 0: Validate Input
ls "$ARGUMENTS/"
test -f "$ARGUMENTS/IMPLEMENTATION-PLAN.md" || echo "missing"
test -f "$ARGUMENTS/00-SUMMARY.md" || test -f "$ARGUMENTS/SUMMARY.md" || echo "missing"
If $ARGUMENTS is not provided — show the available research directories:
find . -maxdepth 4 -name "IMPLEMENTATION-PLAN.md" -path "*/research/*" 2>/dev/null
ls research/reports/ 2>/dev/null
Step 1: Read the Plan
Read("$ARGUMENTS/IMPLEMENTATION-PLAN.md")
Read("$ARGUMENTS/00-SUMMARY.md")
Read("$ARGUMENTS/CONTINUATION-PROMPT.md") # if present
Extract:
- Phases: name, priority (P0/P1/P2), effort, dependencies.
- Team composition: which agents are needed.
- File ownership map — each agent has its own files.
- Acceptance criteria — how we'll know a phase is done.
Step 2: Present to the User
## Build Plan from: {research-dir}
### Available Phases
| Phase | Name | Priority | Effort | Dependencies |
|---|---|---|---|---|
| 1 | {from PLAN} | P0 | 2 weeks | None |
| 2 | {from PLAN} | P0 | 3 weeks | None |
| 3 | ... | P1 | ... | Phase 2 |
### Team Composition
| Role | subagent_type | Phases |
|---|---|---|
| backend-dev | general-purpose | 1, 2 |
| frontend-dev | general-purpose / nextjs-developer | 1, 3 |
| test-writer | general-purpose | All |
### Which phases do we build?
- "all" — all sequentially
- "1,2" — specific ones
- "parallel 1,2" — in parallel (if no deps)
- "1" — only one
Wait for the user's choice.
Step 3: Prepare Context
For each selected phase from IMPLEMENTATION-PLAN.md, extract:
- Task list (file paths, LOC estimates, test counts).
- Acceptance criteria.
- File ownership map.
- Dependencies on other phases.
Combine with:
00-SUMMARY.md — ADRs, key decisions.
- The matching stage from
CONTINUATION-PROMPT.md (if present).
- Deep domain reports (e.g.
02-architecture.md, 04-api-design.md).
Step 4: Spawn the Implementation Team
TeamCreate(team_name="build-{topic}"). Structure — as in
team.
Allocation
- backend-dev: schema, stores, services, workers.
- frontend-dev: pages, hooks, components.
- agent-dev (if planned work involves agents/orchestration): executor,
messaging.
- test-writer: tests for all layers.
(Names are illustrative. Actual roster depends on what's in the plan.)
Teammate prompt
You are {role} implementing Phase {N} of "{topic}".
## Required Reading (in this order)
1. {project root}/CLAUDE.md — project rules, conventions, build commands
2. {research-dir}/00-SUMMARY.md — research summary + ADRs
3. {research-dir}/IMPLEMENTATION-PLAN.md — YOUR tasks in Phase {N}
4. {research-dir}/{relevant detail report}.md — domain context (if present)
## Your Tasks (from PLAN, Phase {N})
{paste task table from IMPLEMENTATION-PLAN}
## Acceptance Criteria
{paste from PLAN}
## Project Rules
Follow CLAUDE.md. Plus, specifically:
- {rule 1 — extracted from PLAN or CLAUDE.md}
- {rule 2}
- {rule 3}
## Your Files (strict ownership)
NEW:
- {paths from PLAN file ownership map}
MODIFY:
- {paths}
READ-ONLY (study, don't edit):
- {paths}
## Verification
After completing all tasks:
- Run project's typecheck (e.g., `npm run typecheck`, `pnpm -r exec tsc --noEmit`, `mypy`, `cargo check`)
- Run project's tests for affected packages
- Run project's build for affected packages
Report failures, do not declare done while red.
## After completion
Report back with:
- Files created / modified (paths + LOC)
- Tests added (count, what they cover)
- Verification results (typecheck/tests/build)
- Any blockers or discovered tech debt
- Updated TODO entries (mark [x] for done, add [ ] for gaps)
Bake project red lines into the prompt (marketplace#169)
If the project has hard constraints — host-isolation, a read-only-proxy
allow-list, primitive-ownership boundaries, or any other rule a phase MUST
NOT violate — paste them verbatim into every teammate's "## Project
Rules" block, not just "follow CLAUDE.md". A teammate that reads the raw
constraint text at spawn time can catch a spec-vs-constraint violation
before writing code (e.g. the plan calls for a server endpoint the
project's read-only-proxy rule forbids) instead of after a failed build.
Pull the constraints from CLAUDE.md / AGENTS.md "Hard rules" / "Red
lines" sections if present; ask the user once if none are recorded.
Step 5: Monitor & Coordinate
- Track task completion (TaskList).
- When backend-dev finishes stores → unblock frontend-dev for hooks.
- When test-writer needs types → wait for backend.
- Handle blockers, replan tasks if needed.
- Teammate crashes or times out (marketplace#169): don't ship
unverified. Self-verify — re-run the affected phase's
typecheck/build/tests yourself (Step 6) and read the diff independently
— rather than trusting a partial or absent teammate report. If the
teammate held a
forgeplan_claim (some projects claim-wrap builders the
way sprint does), release it before continuing —
see sprint §4c-bis for the claim-sweep half of this discipline.
Step 6: Verify
Commands depend on the stack (read CLAUDE.md or
package.json/Cargo.toml/pyproject.toml):
pnpm -r exec tsc --noEmit
pnpm --filter "{affected-pkgs}" build
pnpm --filter "{affected-pkgs}" test
mypy {affected-modules}
pytest {affected-tests}
cargo check --all
cargo test {affected-crate}
All three are mandatory: typecheck, build, test. If anything is red — don't
declare the phase done.
Step 7: Evidence Capture (MANDATORY — PRD-077 FR-013)
This step is not optional. When verification passes (typecheck + build +
tests all green) and before updating docs, /build MUST emit one EvidencePack
that captures the build outcome and links it to the parent PRD/RFC. Skipping
= artifact graph stays blind, forgeplan score won't reflect the work, and
forgeplan health reports a missing-evidence blind spot.
Unlike /sprint (multi-wave, multi-EVID, batched), /build is one-shot:
single target, single completion → exactly one EVID.
Algorithm
1. Identify parent_artifact_id:
- Read IMPLEMENTATION-PLAN.md (or 00-SUMMARY.md) for a "Parent: PRD-NNN"
or "RFC: RFC-NNN" reference at the top.
- If not present, grep the plan body for PRD-NNN / RFC-NNN / SPEC-NNN.
- If still nothing, ask the user: "Which PRD/RFC does this build inform?"
(Standard+ depth requires an artifact; Tactical may skip — note in report.)
2. Build the EVID title:
"{plan-name}: implementation complete — {N} phases / {M} files / {T} tests"
3. MCP-first (when mcp__forgeplan__forgeplan_new is in the tool list):
a) evid = mcp__forgeplan__forgeplan_new(kind="evidence", title=<title>)
b) mcp__forgeplan__forgeplan_update(id=evid["id"], body=<body — see template>)
c) mcp__forgeplan__forgeplan_link(
source=evid["id"], target=parent_artifact_id, relation="informs"
)
d) relay evid["_next_action"] into the final report
4. Shell fallback (MCP tools absent):
a) forgeplan new evidence "<title>" # capture EVID-MMM from output hint
b) $EDITOR .forgeplan/evidence/EVID-MMM-*.md # paste body template
c) forgeplan link EVID-MMM <parent_artifact_id> --relation informs
5. If MCP+CLI both unavailable (no forgeplan binary on PATH):
- DO NOT silently skip
- WARN explicitly: "MCP+CLI both unavailable. Capture this evidence
manually after the build:" then print the would-have-been commands +
the body template so the user can paste verbatim.
6. Activation prompt (optional, single):
"EVID-MMM created (draft). Activate now? [Y/n]"
- Default Y for interactive sessions; auto-skip when called from /autorun
- On Y: mcp__forgeplan__forgeplan_activate(id=evid["id"])
OR forgeplan activate EVID-MMM
EvidencePack body template
Required structured fields keep R_eff from collapsing to 0.1 (CL0 penalty).
Defaults below are appropriate for build runs — sprint-style measurement
against IMPLEMENTATION-PLAN acceptance criteria.
## Structured Fields
verdict: supports
congruence_level: 3
evidence_type: measurement
## Build summary
- Plan: {path to IMPLEMENTATION-PLAN.md}
- Parent artifact: {PRD-NNN / RFC-NNN}
- Phases executed: {1, 2, 3 | "all" | "phase 1 only"}
- Teammates spawned: {role-1, role-2, ...}
## Files created / modified
- NEW ({count}): {list — truncate top 5 + "+ N more"}
- MODIFIED ({count}): {list — truncate top 5 + "+ N more"}
## Tests added
- Count: {N}
- Coverage: {what they cover — bullet 2-3 items}
- Pass rate: {N/N passing}
## Verification
- typecheck: ✓ ({command, e.g., `pnpm tsc --noEmit`})
- build: ✓ ({command})
- tests: ✓ ({command})
- lint: ✓ ({command, if run})
## Acceptance criteria validation
{paste the AC table from IMPLEMENTATION-PLAN.md and tick ✓/✗ each row}
## Blockers / tech debt discovered
{from teammate reports — if none, write "None."}
Why one EVID, not per-phase
A /build invocation is the unit of completion: the plan was read once,
the team spawned once, verification ran once. One EVID per build keeps the
artifact graph clean. If a build is split across sessions (incremental
phases over days), prefer updating the same EVID body (re-emit forgeplan update id=EVID-MMM body=...) rather than creating a new EVID per session —
keeps the trail single-threaded. The forgeplan-aware flow in the existing
"Forgeplan integration" section already calls this out.
Do NOT skip when verification is red
Step 6 already requires green typecheck + build + tests before declaring the
phase done. Step 7 (evidence) runs only after Step 6 passes — so a red build
correctly skips evidence (because the build itself isn't a completion). If
the user explicitly accepts a partial build, emit the EVID with
verdict: weakens and a body section listing what failed; this is the
honest record.
Step 8: Update Docs
-
TODO files — [x] for completed, [ ] for gaps.
-
KNOWN-ISSUES.md — if bugs were discovered along the way.
-
RFC (if present) — Implementation Log + Sprint Insights. See
rfc.
-
Memory (if available):
memory_retain("# Build: {topic} — Phase {N} Complete (YYYY-MM-DD)
Implemented: {list}
Tests: {count} passing
Gaps remaining: {list}
Key decisions: {ADRs from research}")
Spec ↔ as-built reconciliation (marketplace#169)
If the parent PRD/RFC mandated something a project red line forbade — and
the team correctly omitted it (per the prompt-baked rule above) — the job
is not done by omission alone. Before the parent artifact is activated
(Step 7's activation prompt), append an "As-Built Reconciliation" section
to its body marking the forbidden mandate superseded-by-build, with the
reason. An artifact whose invariants still claim the forbidden surface
while the code correctly doesn't ship it is a silent lie in the graph —
the next reader (human or agent) trusts the stale mandate. Re-adding the
forbidden surface "to satisfy the spec" is the wrong fix; reconciling the
spec is the right one.
Step 9: Cleanup
Shutdown teammates → TeamDelete(). See cleanup checklist in
team.
Phase Selection Strategies
Parallel phases
If IMPLEMENTATION-PLAN.md has phases without dependencies:
Phase 1 (frontend) + Phase 2 (backend) → parallel
Phase 3 (depends on Phase 2) → sequential after Phase 2
Incremental build
For large plans (7+ phases):
Session 1: Phase 1 + 2 (foundation)
Session 2: Phase 3 + 4 (features) — use CONTINUATION-PROMPT Stage 2
Session 3: Phase 5 + 6 (advanced) — Stage 3
Session 4: Phase 7 (UI polish) — Stage 5
Each session — its own TeamCreate, to keep token usage from ballooning.
Single-phase focus
Quick iteration on one phase:
build research/reports/{dir} --phase 1
Anti-patterns
| Anti-Pattern | Why | Do this instead |
|---|
| Build without reading research | Missing context, wrong patterns | ALWAYS read 00-SUMMARY + relevant detail reports |
| Ignore ADRs | Counter to research decisions | Follow ADRs as law |
| All phases at once | Context overflow | 2-3 phases per session |
| No verify after each | Cascade failures | typecheck + test after every phase |
| Frontend before backend types | Types out of sync | Backend → types → frontend |
| Skip TODO/RFC update | Knowledge lost | Step 8 is mandatory |
| ⛔ Skip post-build evidence emission | Artifact graph blind, R_eff stays at 0.1 | Step 7 is MANDATORY — one EVID per build |
| Silent skip when MCP+CLI both unavailable | User never learns evidence wasn't captured | WARN explicitly with copy-paste commands |
| Auto-activate without prompt | Bypasses user review of generated evidence | Default to [Y/n] prompt; /autorun defers to draft |
Related Skills
research — produces IMPLEMENTATION-PLAN.md.
team — foundation.
sprint — alternative when there's no plan yet.
audit — runs after the build.
rfc — update RFC.
do — chains research → build → audit.
Forgeplan integration
/build is forgeplan-aware end-to-end when forgeplan is on $PATH or
mcp__forgeplan__* tools are exposed:
- Post-verification evidence autopublish — MANDATORY (§Step 7), one EVID
per completed build, linked
informs to the parent PRD/RFC, structured
fields filled by the skill
- Optional activation prompt — interactive sessions get a
[Y/n] for
immediate EVID activation; non-interactive (e.g., /autorun) leaves it
draft for batch activation later
No manual forgeplan new evidence is required after a clean build; the
skill writes it for you. The commands below describe the shape; the skill
calls them.
Before /build (still user's responsibility)
The IMPLEMENTATION-PLAN.md should already reference the parent PRD/RFC (created by /research → /refine → /rfc). If not, create one:
forgeplan route "<scope of the IMPLEMENTATION-PLAN>"
forgeplan new prd "<title>"
forgeplan validate PRD-NNN
During / after /build (skill calls these automatically)
forgeplan new evidence "<plan>: implementation complete — N phases / M files / T tests"
forgeplan link EVID-MMM PRD-NNN --relation informs
forgeplan activate EVID-MMM
forgeplan score PRD-NNN
forgeplan activate PRD-NNN
For /build runs that take multiple sessions (each adding a phase), prefer
forgeplan update id=EVID-MMM body=... on the existing EVID rather than
creating new EVIDs per session — keeps the trail single-threaded. The skill
will create a fresh EVID on each invocation by default; pass the existing
EVID-MMM in the plan's frontmatter to override and update-in-place instead.
Want this orchestrated for you?
/forge-cycle (in forgeplan-workflow) handles the full build + evidence + activate flow when you start from a task description rather than an existing IMPLEMENTATION-PLAN.