phase-workflow
Use this skill to plan and complete software projects from a zero-based project direction
while keeping work phase-based, testable, and recoverable across Codex sessions.
Mandatory Invocation
If phase-workflow applies, first open this SKILL.md in the current turn.
Then read only the needed reference file for the current decision.
Hook-injected reminders do not count as skill invocation. Project AGENTS.md rules do not
replace opening this skill when the skill applies. Do not rely on compressed chat history or
remembered phase-workflow rules.
Before mutating files, state the active authorization branch: plan-change, phase start gate,
post-gate execution, approach confirmation, status/handoff update, or recovery-record
mutation.
Resource Navigation
Load only the resource needed for the current decision:
- Read
references/phase_policy.md when starting, exiting, renumbering, or splitting a phase.
- Read
references/change_request_policy.md when a new request appears during an active phase.
- Read
references/handoff_protocol.md when resuming work in a new window or ending a work round.
- Read
references/verification_policy.md before marking a phase complete or reporting test status.
- Copy from
templates/ when creating phase notes, handoff notes, TODOs, or decision records
in a target project.
- Copy
templates/project_context_template.md as PROJECT_CONTEXT.md when adopting an
existing structured project.
- Use
examples/ only when the user needs a concrete pattern for an empty-folder start,
existing structured project re-baselining, change request, new-window handoff, or optional
ChatGPT/MCP planning. Use examples/chatgpt_mcp_planning_example.md for a ChatGPT/MCP
planning example.
When To Use This Skill
Use this skill when the user is working on:
- A project planned from a zero-based project direction.
- Empty repositories and new projects.
- An existing codebase with a clear structure that needs re-baselining toward a complete
delivery path.
- A project where MVP is a possible milestone, not the universal project frame.
- A Phase 0 initialization.
- A phase-based development plan.
- Scope control for an evolving project.
- New-window handoff after prior Codex work.
- Mid-phase change request handling.
- Updates to
TODO.md, DECISIONS.md, phase notes, or handoff documents.
When Not To Use This Skill
Do not use this skill when:
- The user is only asking a simple question.
- The user explicitly asks for a direct small bug fix in a project that has not adopted
phase-workflow, or explicitly opts out of phase-workflow for that request.
- The project is mature and already has a process the user does not want to change.
- The project state is unclear, heavily tangled, or lacks an identifiable entrypoint,
verification command, or current goal.
- The current task does not need long-term context management.
- The repository has higher-priority development instructions.
In a project that has adopted phase-workflow, a direct small bug fix is still governed by
phase-workflow. Classify it as Phase X.2 unless the user explicitly opts out of phase-workflow
for that request. An opt-out does not rewrite project workflow records; it only scopes that
request outside the workflow.
Core Workflow
For each phase:
- Lock phase scope.
- Prepare fixtures/examples.
- Write failing tests.
- Complete the real capability inside the declared phase boundary.
- Verify with actual commands.
- Update
TODO.md, phase notes, and handoff/current-state.
- Move to the next phase only after verification.
Optional ChatGPT/MCP Planning
Phase 15 introduces optional ChatGPT/MCP planning guidance without changing the default
Codex-only workflow.
Codex-only remains the default compatible path. In that path, Codex reads bounded recovery
context from project files, shows gates, validates authorization, executes commands, and edits
files after confirmation.
ChatGPT/MCP planning with Codex execution is optional. In that path, ChatGPT may use the
read-only MCP companion through an available connector path to read bounded project context
and generate a short handoff prompt for Codex. Codex still validates local files, phase
gates, authorization branch, and stop conditions before execution.
Do not treat MCP planning as required. Codex-direct MCP planning is not supported by Phase 15.
The local MCP companion must not call Codex, run codex exec, start Codex, or use Codex as a
compression backend.
Default Recovery Snapshot
For ChatGPT/MCP planning, the local MCP companion reads the same bounded recovery context
Codex would read by default. Read AGENTS.md. Read the needed skill entry or reference
guidance. Read the first 80-120 lines of the compact handoff or current-state file, when
present. Read only current TODO.md sections: current phase, active task, blockers, next
tasks, and do-not-do-yet.
Do not read full PLAN.md, full TODO.md, DECISIONS.md, full handoff files, or phase notes
by default. Treat those as targeted or on-demand reads. Do not route MCP snapshot reads
through Codex.
On-Demand Planning Reads
For ChatGPT/MCP planning, keep the Phase 15.2 default snapshot as the default. Use on-demand
reads only when planning needs more context: scope conflict, missing verification, unclear
phase boundary, explicit history request, or a specific PLAN.md section, phase note, or
DECISIONS.md entry.
Name a concrete file, heading, or section for each on-demand read. Do not read the whole
project history. Record source refs for every on-demand read. On-demand reads remain
read-only: do not write files, execute commands, or route reads through Codex.
ChatGPT-to-Codex Handoff
For ChatGPT/MCP planning, ChatGPT may first produce a planning-only draft start gate preview
labeled draft_start_gate_preview: 1. The preview can include current phase, goal, non-goals,
split decision, verification loop, and confirmation status when present in MCP planning
context. It is non-authoritative and not Codex execution authorization. Codex must still show
the authoritative start gate after local revalidation and wait for separate Codex-side
execution confirmation before any mutation.
For ChatGPT/MCP planning, produce a short copyable handoff for Codex. Required handoff fields:
project_id, optional workspace_id, mode, source_refs, snapshot_id,
requested_action, and stop_condition. mode must be ChatGPT/MCP planning with Codex execution.
Do not include full project history or full file contents. Include a stop condition such as
show the next phase gate only or execute only the current confirmed phase and stop. Do not
treat the handoff as a source of truth or execution authorization. Codex must revalidate local
files, phase gates, authorization branch, and stop condition before execution.
Handoff recognition is header-based. Do not infer ChatGPT/MCP handoff mode from natural
language alone. Missing header means ordinary Codex-only conversation. A valid header includes
phase_workflow_handoff: 1, mode: ChatGPT/MCP planning with Codex execution, project_id,
source_refs, snapshot_id, requested_action, and stop_condition. workspace_id is
required when multiple local checkouts or ambiguity exist. Missing required fields, mismatched
project identity, missing source refs, unclear stop condition, or wrong mode fails closed
before execution. A valid handoff remains planning input only, not a source of truth or
execution authorization. Codex must revalidate local files, phase gates, authorization branch,
and stop condition before execution.
Direct conversation with Codex remains Codex-only. Codex must not route its own planning,
recovery reads, local validation, command execution, or file mutations through MCP. MCP is
only for ChatGPT-side planning reads. Codex may configure, start, check status, and stop the
local MCP companion after user confirmation, but service management does not make Codex
planning use MCP.
Project Identity And Setup Card
For ChatGPT/MCP planning, define a project identity and setup card before asking ChatGPT to
plan against a local project. Required setup card fields: project_id, optional
workspace_id, display_name, workspace_root, and allowed_files.
project_id is the stable identity for the project. workspace_id distinguishes multiple
local checkouts of the same project. display_name is human-facing only. workspace_root
stays in the local MCP registry. allowed_files is the explicit read allowlist for MCP
planning.
Do not use display_name as an identity anchor. Do not include workspace_root in the copied
Codex handoff unless local validation needs it. Treat the setup card as connector
configuration guidance, not execution authorization.
Project Configuration And Local Registry
For ChatGPT/MCP planning, create project MCP configuration only after an explicit user request.
Explicit user request is required before creating or updating project MCP configuration or the
local registry. Project-local MCP config lives under .phase-workflow/mcp/project.json. The
project config stores schema_version, project_id, display_name, and allowed_files.
The project config must not store the local absolute workspace_root.
The local MCP registry lives at ~/.phase-workflow/mcp/registry.json. The local registry
stores project_id, workspace_id, workspace_root, port, endpoint, and PID or lock
metadata. project_id is generated once for the project and stored in project config.
workspace_id is generated per local checkout and stored in the local registry. Missing or
ambiguous project_id or workspace_id fails closed. Configuration writes stay inside the
selected project and the documented local registry path.
Local Read-Only MCP Lifecycle
For ChatGPT/MCP planning, keep the local companion lifecycle lightweight. Support only start,
status, and stop guidance. Bind to loopback by default. Track the running process with a PID
or lock file. Report port conflicts explicitly. Fail closed when project_id is missing,
unknown, or ambiguous.
ChatGPT-side planning uses an already running companion only through an available connector
path. For remote ChatGPT, prefer OpenAI Secure MCP Tunnel when available; keep loopback
endpoint details for same-machine development and smoke tests. Do not let ChatGPT start
Codex, start the local companion, or execute project commands. Do not add a Web UI, database,
cloud sync, issue tracker integration, or complex CLI.
Built-In Read-Only MCP Companion
For projects that have adopted phase-workflow, use the built-in read-only MCP companion only
when the user explicitly asks to enable optional ChatGPT/MCP planning for that project.
Use scripts/phase_mcp_lifecycle.py for configure/start/status/stop only after explicit user
request and confirmation. Use scripts/phase_mcp_setup_output.py after the selected workspace
reports running to prepare ChatGPT setup guidance and a starter ChatGPT planning prompt.
Do not hard-code unstable ChatGPT product UI steps; provide connection guidance, project
identity, workspace identity, allowed files summary, and starter prompt. The final Codex
handoff is ChatGPT output after MCP-assisted planning, not Codex configuration output.
Do not make Codex read, plan, validate, execute, or mutate files through MCP. Direct Codex
conversation remains Codex-only unless a valid ChatGPT/MCP handoff header is pasted back and
passes local validation.
OpenAI Secure MCP Tunnel
Use OpenAI Secure MCP Tunnel as the preferred remote ChatGPT connection path when available.
Local loopback remains the local development path for same-machine development and smoke
tests. Secure Tunnel keeps the MCP server private and uses outbound tunnel-client
connectivity instead of public inbound project ports.
Secure Tunnel setup output is ChatGPT connector guidance, not Codex execution authorization.
It may include tunnel_id, profile name, selected project_id, selected workspace_id,
target type, stdio or HTTP target guidance, tunnel-client command guidance, lifecycle
guidance, and diagnostics guidance. The final Codex handoff remains ChatGPT output after
MCP-assisted planning.
Secure Tunnel availability depends on account, Platform tunnel, organization/workspace,
ChatGPT connector UI, workspace association, and permissions. If the tunnel is not visible or
connector calls fail, check workspace association, Tunnels Read and Tunnels Use, rerun
tunnel-client doctor --profile <name> --explain, and confirm
tunnel-client run --profile <name> is still healthy.
Port conflicts remain local companion issues. Secure Tunnel is not public exposure and does
not require exposing arbitrary project ports publicly. Do not promote ngrok or public URL
tunneling as the primary supported MCP connection path. Do not imply that Secure Tunnel is
universally available. Do not store OpenAI API keys, tunnel runtime keys, or other tunnel
secrets in project config, local registry, handoff prompts, README examples, or tests.
Authorization Model
Use this single authorization model before applying the detailed rules below. When two signals
conflict, use the narrower authorization and stop at the next required gate.
| Signal | Authorizes | Does not authorize | Required stop |
|---|
| Plan-change confirmation | planning-file updates only | Tests, code, scripts, migrations, restores, or other technical files | Stop after planning files |
| Phase start request | phase analysis and visible start gate only | Execution, file edits, or current-phase mutations | Stop after the gate |
| Post-gate execution confirmation | current-phase technical mutations that pass mutation preflight | Next-phase work, multi-phase execution, planning-file mutations, recovery-record mutations, or unstated approach choices | Stop when the current phase exits |
| Approach confirmation | approved non-trivial approach inside the current phase | Phase boundary changes or broader scope | Stop if the approach is rejected |
| Mutation preflight pass | The checked current-phase mutation branch | Failed-gate, unconfirmed, wrong-branch, next-phase, or multi-phase mutations | Stop before files if any check fails |
| Phase violation detected | read-only recovery audit and chat-visible incident report before user choice; recovery record repairs after user choice | New implementation, next-feature work, continuing the violated flow, or pre-choice record repair | Stop before record repairs until the user chooses keep-and-audit or rollback |
This model keeps plan-change confirmation, phase start requests, post-gate execution
confirmation, approach confirmation, mutation preflight, and phase violation recovery as
separate controls. They cannot substitute for each other and do not authorize multi-phase
execution. A successful authorization does not authorize next-phase work and does not
authorize multi-phase execution.
Do not use the phase violation row to write recovery record repairs before user choice.
Workflow Authority
When phase-workflow applies, it is the highest phase-boundary and authorization workflow for
the work. It controls scope, authorization, phase boundaries, and file-modification
boundaries.
Other workflow behaviors can support execution, but they do not control phase boundaries.
This includes plan executors, test workflows, debugging workflows, refactoring workflows,
migration workflows, code generation helpers, documentation generators, task checklists, and
tool-specific workflows. These workflows can only guide work inside the currently authorized
phase.
They cannot decide phase boundaries, advance to the next phase, or execute multiple phases in
one run.
If a user provides a plan with multiple phases, multiple verification loops, or multiple
independent outputs, even a request such as "implement this plan" only authorizes the
currently confirmed phase. Only the currently confirmed phase may execute. Unconfirmed phases
must stop at a phase gate.
Todo lists, checklists, progress trackers, and update_plan cannot substitute for phase start
gates, split confirmation, approach confirmation, or post-gate execution confirmation.
Do not record batch phase completions such as Phase 1-5 complete, Phase 2/3/4, or
multi-phase migration complete; each phase must have separate status, verification, and
handoff records.
Mutation Preflight
Before repository mutations, run a mutation preflight. Repository mutations include file
writes, deletes, moves, restores, generated tests, generated docs, scripts, migrations, and
implementation changes. Any work that changes repository files must pass mutation preflight
before modifying files.
Mutation Authorization Branches:
- A planning-file mutation requires plan-change confirmation and planning-file scope only; it
does not require post-gate execution confirmation.
- A recovery audit before user choice is read-only and may produce only a chat-visible
incident report.
- A recovery-record mutation requires Phase Violation Recovery and the user's keep-or-rollback
choice. After the user chooses, recovery-record mutations may repair
PLAN.md, TODO.md,
phase notes, and handoff records.
- A status/handoff-record mutation requires current phase execution or phase exit context. It
can update
TODO.md, phase notes, handoff notes, and DECISIONS.md when recording a
durable decision already made inside the authorized phase or phase exit context.
It must record actual verification results when claiming completion or test status. If
verification has not run, record that status honestly and do not claim completion or passing
tests. It can update blocker, unfinished status, handoff, or current-state records without a
fresh verification command when no completion or test status is claimed. It does not
authorize plan changes, new strategy decisions, technical implementation, or recovery
repair.
- A technical mutation requires visible phase start gate, post-gate execution confirmation,
and mutation preflight.
- If the mutation type is unclear, stop before mutating files.
Post-gate execution confirmation authorizes technical mutations only. It does not authorize
planning-file mutations or recovery-record mutations. Planning-file mutations use plan-change
confirmation. Recovery-record mutations use Phase Violation Recovery.
Classify mutation branches by change intent and content, not by file name alone. TODO.md,
phase notes, and handoff notes can contain planning-file mutations or status/handoff-record
mutations. Scope, phase boundary, active task, acceptance criteria, or roadmap changes are
planning-file mutations. Verification results, current status, and handoff summaries are
status/handoff-record mutations.
Do not apply technical mutation gate checks to planning-file mutations or recovery-record
mutations; visible phase start gate and post-gate execution confirmation are technical
mutation checks.
Planning-file mutation checks:
- What planning change has the user confirmed?
- Is every changed file a planning file or planning note?
- Will the work stop after planning-file updates?
- Would this mutation complete multiple phases at once?
Recovery-record mutation checks:
- Is Phase Violation Recovery open?
- Has the user chosen keep implementation and backfill audit, or roll back selected changes?
- Is the mutation limited to repairing planning, phase, and handoff records?
- Does the mutation avoid new implementation?
Status/handoff-record mutation checks:
- Is the update reporting current phase execution, verification, blocker, unfinished status,
handoff, or current-state status?
- Is it limited to
TODO.md, phase notes, handoff notes, or a narrow DECISIONS.md update?
- Is any
DECISIONS.md update limited to recording a durable decision already made inside the
authorized phase or phase exit context?
- Are actual verification results recorded when completion or test status is claimed?
- If verification has not run, does the record say so without claiming completion or passing
tests?
- Does it avoid plan changes, technical implementation, and recovery repair?
Technical mutation checks:
- What is the current phase?
- Has the visible phase start gate been shown?
- Is there a separate post-gate execution confirmation?
- Does this mutation belong only to the current phase?
- Would this mutation complete multiple phases at once?
If any answer fails, stop before mutating files. Do not use one mutation to complete multiple
phases; split the work or return to the appropriate phase gate.
Phase 0.2 is a planning baseline only. Phase 0.2 allows planning records only: PLAN.md,
TODO.md, phase notes, handoff notes, planning baselines, roadmaps, and candidate Phase 1
goals. During Phase 0.2 there are no
tests, code skeletons, migrations, file restores, technical implementation, scripts, or
non-planning technical documentation. Non-planning technical documentation includes API docs,
architecture docs, migration guides, usage docs, module docs, or generated technical docs. Do
not treat planning records as technical deliverables. In short: no tests, code skeletons,
migrations, file restores, or technical implementation. After Phase 0.2, stop before Phase 1.
Plan-change confirmation only authorizes planning-file updates, then stop. It does not
authorize tests, code, scripts, migrations, restores, or other technical files.
Phase Violation Recovery
Use Phase Violation Recovery when an approved phase boundary has already been crossed. This is
a mandatory recovery flow, not permission to continue implementation.
When a phase violation is discovered:
- Stop new implementation immediately.
- Do not continue to the next feature.
- Do not keep implementing while recovery is open.
- Before the user chooses keep-and-audit or rollback, recovery audit is read-only.
- Audit files and records changed outside the approved phase boundary as a read-only step.
- Report a chat-visible incident report that marks
implementation happened outside approved phase boundary.
- The chat-visible incident report should record which files, tests, migrations, restores,
docs, and status records were affected.
- Ask the user to choose: keep implementation and backfill audit, or roll back selected
changes.
- Do not write recovery record repairs before the user chooses.
- After the user chooses, repair
PLAN.md, TODO.md, phase notes, and handoff records.
- Make the state honest and recoverable so a new Codex session can resume without chat
history.
Operating Rules
- Keep one phase focused on one user-value loop or end-to-end capability loop.
- A phase can be small, but it must not be hollow. It must complete the real capability
inside the declared phase boundary.
- Preview, smoke, contract-only, stub, fake, or simulated behavior is acceptable only when the
phase boundary, user-facing labels, artifact fields, and acceptance criteria explicitly say
so.
- Do not treat UI, job, progress, artifact, and result surfaces as complete when the real
execution path is not connected.
- Before starting a major phase or sub-phase, output a visible phase start gate.
- The phase start gate must include the current phase, goal, non-goals, split decision,
verification loop, and confirmation status.
- Before starting a major phase, report whether the scope is one single verification loop.
- A request to start a phase is not confirmation. It only authorizes phase analysis and the
phase start gate.
- Do not treat "start Phase X" as confirmation. Do not treat "begin Phase X", "continue
Phase X", "enter Phase X", or similar English requests as execution confirmation either.
- Do not write
Confirmation status: received in your current request unless the current
message is a clear confirmation after the gate has already been shown.
- Always stop after reporting the phase start gate. Execution requires a separate user response
after the phase start gate is displayed.
- After plan-change update, a later request to start, continue, enter, or execute an
already-recorded Phase X.N only authorizes the phase start gate; it does not authorize
execution. The start gate must stop before execution.
- Plan-change confirmation, phase start request, and post-gate execution confirmation cannot
substitute for each other. Post-gate execution confirmation authorizes technical mutations
only; it does not authorize planning-file mutations or recovery-record mutations.
- Plan Mode is optional. When Plan Mode is enabled and this skill applies, Codex must activate
and follow phase-workflow first.
- Plan Mode cannot bypass phase-workflow activation, phase boundary change checks, phase
start gates, or post-gate execution confirmation.
- In Plan Mode, plan, phase, scope, or design-change requests must go through
phase-workflow classification before returning a proposed plan.
- Plan Mode proposed plan cannot substitute for plan-change confirmation, phase start request,
and post-gate execution confirmation. Plan Mode does not authorize execution.
- If the user gives an ambiguous response, ask a short explicit confirmation question and do
not edit files.
- If the target folder is an empty folder, treat Phase 0 initialization as gated work.
- Before Phase 0, classify folder state as
empty folder, existing structured project candidate, existing workflow project, or unclear project state.
- Folder state classification is only a recommendation. It must be reported with evidence and
does not authorize execution.
- For an existing structured project candidate, use Phase 0.1 for workflow adoption and
Phase 0.2 for a planning baseline.
- For an existing workflow project, recover compact current state from project files before
proposing the next phase gate.
- During Phase 0.1, create or fill workflow files and
PROJECT_CONTEXT.md; do not overwrite
existing project files, plan a roadmap, modify application code, refactor, or start a cleanup
campaign.
AGENTS.md is a Phase 0 or Phase 0.1 adoption output. Do not overwrite an existing
AGENTS.md; append a small phase-workflow section. If a phase-workflow section already
exists, do not add it again. Users may explicitly request refreshing the phase-workflow
section after updating this skill; treat that as a maintenance action, not a per-prompt
action.
.codex/hooks.json is a Phase 0 or Phase 0.1 adoption output only when optional
project-level hook support is selected or explicitly requested. Do not overwrite an existing
.codex/hooks.json; merge only the phase-workflow UserPromptSubmit entry. If a
phase-workflow hook entry already exists, do not add it again. A conflicting hook command
or hook location requires user confirmation before replacement. Users may explicitly request
refreshing the .codex/hooks.json hook entry after updating this skill; treat that as a
maintenance action, not a per-prompt action. When creating or refreshing the optional hook
entry, use the target project's absolute path to hooks/phase_workflow_prompt.py in the
hook command. Do not rely on the hook runner's current working directory. Restart Codex and
re-review/trust the hook after changing the absolute hook command. The hook does not
generate AGENTS.md, update .codex/hooks.json, scan project files, restore state, or
invoke the skill directly.
- During Phase 0.2, use
PROJECT_CONTEXT.md and a user-confirmed next project goal to create
a rough planning baseline; do not infer the roadmap from code observations alone.
- Phase 0.1 completion does not authorize Phase 0.2. Phase 0.2 completion does not authorize
Phase 1. Every phase and sub-phase requires its own visible start gate and separate user
confirmation.
- Output a visible Phase 0 start gate before creating any project files.
- Do not create baseline workflow files before user confirmation. Baseline workflow files
include README.md, AGENTS.md, PLAN.md, TODO.md, and DECISIONS.md.
- Split when the user requests a split, when there are multiple independent outputs,
unrelated user-visible capabilities, separate verification loops, or when reviewability,
transparency, phase size, risk, user confidence, or avoiding opaque large phases makes the
phase easier to supervise.
- Do not split only because one coherent phase has several mechanical tasks, but do split when
the user wants a large phase broken down for review.
- Do not automatically start the next phase; wait for explicit user confirmation.
- Do not create fixtures, tests, or implementation changes before user confirmation of the
phase boundary.
- Prefer fixtures/examples before implementation.
- Prefer failing tests before changing behavior.
- Complete only the real capability promised by the active phase boundary; do not add
later-phase behavior, but do not substitute a hollow preview for promised execution.
- Record scope changes before implementing them.
- Run actual verification commands before marking work complete.
- Update project files so the next Codex session can resume without chat history.
- Follow repository instructions when they are more specific than this skill.
Plan-First Execution
Planning records are execution inputs, not after-the-fact summaries.
For scope-changing work, update planning files before technical files. This applies to new
phases or sub-phases, phase splits, New Major Phase work, Phase 0.1 workflow adoption,
Phase 0.2 planning baseline, route changes, changes to the current phase goal, non-goals,
outputs, acceptance criteria, or any request that changes the current PLAN.md or TODO.md
task boundary.
Planning files include PLAN.md, TODO.md, and, when relevant, the active phase note,
handoff note, PROJECT_CONTEXT.md, or DECISIONS.md.
Do not start fixtures, tests, implementation, or other technical file changes until the
relevant plan record exists. Do not use PLAN.md or TODO.md as after-the-fact summaries for
scope-changing work. Prohibited order: Implement first, document plan later.
Current-scope implementation details, verification results, actual modified file lists,
phase note updates, handoff summaries, and small non-scope-changing corrections can be
recorded after the technical work.
Reviewable Splits And Approach Confirmation
Any phase split is a phase boundary change, regardless of whether the split is requested by
the user or recommended by Codex. Use one split flow for both sources. When a split is needed,
output a split interpretation or phase boundary change proposal first, ask the user to confirm
the planning change before updating planning files, then update PLAN.md, TODO.md, and the
active phase note. After those planning files are updated, stop. Split confirmation only
authorizes planning-file updates, then stop; it does not authorize Phase X.N or any
implementation work.
Phase boundary change confirmation applies to splits, any one-decimal Phase X.N sub-phase,
New Major Phase work, Backlog moves, and phase goal, non-goal, acceptance criteria, or
verification loop changes. Phase X.1 and Phase X.2 are common examples, not the complete
boundary. When Codex recommends a split, it must propose the complete currently visible
sub-phase structure before asking for confirmation. The proposal must assign Phase X.1, Phase
X.2, and later one-decimal numbers to known follow-up sub-phases, and mark uncertain or
out-of-scope work as later phase work or Backlog. Do not create only the immediate next Phase
X.1 and route the user directly to the Phase X.1 start gate. When Codex proposes a new Phase
X.N, it must explain why that sub-phase is needed, show a phase boundary change proposal, and
ask whether to update the plan. After confirmed planning-file updates, Codex stops before
showing the new phase or sub-phase start gate. Show the already-recorded Phase X.N start gate
only after a later user request. Use one decimal level only; do not introduce Phase X.N.M.
After plan-change update, that later request still only authorizes the phase start gate. It
does not authorize execution. The start gate must stop before execution and wait for
post-gate execution confirmation.
Plan Mode is optional, but when it is enabled for a task covered by this skill, Codex must
activate and follow phase-workflow first. Plan Mode cannot bypass phase-workflow activation,
phase boundary change checks, phase start gates, or post-gate execution confirmation. Run the
same classification before returning a proposed plan.
Plan Mode proposed plan cannot substitute for plan-change confirmation, phase start request,
and post-gate execution confirmation. Plan Mode does not authorize execution.
Valid split reasons include reviewability, transparency, phase size, risk, user confidence,
avoiding opaque large phases, multiple independent outputs, unrelated user-visible
capabilities, or separate verification loops.
Approval model:
Split confirmation controls phase boundaries. Phase confirmation controls execution permission. Approach confirmation controls how non-trivial work will be done.
Approach confirmation applies to any phase or sub-phase. If a phase or sub-phase has a
non-trivial execution approach choice, show the proposed execution approach and wait for user
confirmation before modifying related files. A phase confirmation does not approve an unstated
approach.
Non-trivial execution approach choices include algorithms, architecture, libraries or
dependencies, data structures, Markdown document structure, prompt rewrite strategy, template
field design, policy semantics, test strategy, migration or compatibility strategy, and
user-visible output format. Documents, prompts, templates, policies, tests, and code can all
require approach confirmation when the approach affects outputs, maintainability, validation,
or long-term behavior.
If the user rejects the proposed approach, stop execution. Update TODO.md, PLAN.md, or the
active phase note as needed, show a revised approach confirmation, and wait for user
confirmation before continuing.
Do not treat split confirmation as execution approval. Do not treat phase or sub-phase
confirmation as approval for an unstated approach. Do not continue implementation after the
user rejects the approach.
Phase Start Checklist
Before creating fixtures, tests, implementation changes, or any project files for Phase 0,
output a phase start gate and wait for user confirmation.
Identify:
- Current phase.
- Whether the previous phase is complete.
- Folder state:
empty folder, existing structured project candidate, existing workflow project, or unclear project state.
- Current phase goal.
- Current phase non-goals.
- Split decision: keep the current phase, split into Phase X.N, move to a New Major Phase, or
place in Backlog.
- Whether the phase is still one single verification loop.
- Proposed execution approach, when the work has a non-trivial approach choice.
- Inputs.
- Outputs.
- Acceptance criteria.
- Work that is not allowed in this phase.
- For Phase 0, baseline workflow files to create.
- For Phase 0.1, detected existing files, files to create or fill, files not to overwrite,
verification command, and
PROJECT_CONTEXT.md fields.
- For Phase 0.2,
PROJECT_CONTEXT.md, user-confirmed next project goal, files to update, and
candidate Phase 1 goal.
- Whether user confirmation has been received.
- Confirmation source: a separate user response after the phase start gate is displayed.
- If the response is unclear or ambiguous, ask a short explicit confirmation question before
editing files.
If the boundary is unclear, stop and clarify the phase before editing files.
Phase Exit Checklist
Before marking a phase complete, confirm:
- Tests pass.
- Smoke test passes, when applicable.
- Outputs match the current phase agreement.
TODO.md is updated with current-only tasks.
- Phase note records historical completion details.
- Compact handoff/current-state note is updated.
DECISIONS.md records durable decisions only.
- No unexplained scope expansion occurred.
- Verification results and the recommended next action have been reported.
- User confirmation is received before starting the next phase.
Change Request Policy
Classify mid-phase changes before implementing them:
- One-decimal current-phase sub-phase: Phase X.N.
- Common small scoped addition example: Phase X.1.
- Common current phase bug fix example: Phase X.2.
- New capability or separate verification loop: New Major Phase.
- Valuable but not now: Backlog.
- Project or release boundary expansion idea: record only, do not implement directly.
Every change request should include impact on files, tests, outputs, and acceptance criteria.
If the classification is New Major Phase, update the plan and wait for user confirmation before
implementing it.
Handoff Policy
Do not rely on chat history. Recover context from project files.
At the start of a new window, read compact recovery context in this order:
- Read
AGENTS.md first.
- Read only the first 80-120 lines of the latest compact handoff or current-state file.
- Read only the current phase, active task, blocked, and next task sections of
TODO.md.
Do not read full PLAN.md, DECISIONS.md, PROJECT_CONTEXT.md, full TODO.md, full
handoff files, or full phase notes by default. Treat PLAN.md, DECISIONS.md,
PROJECT_CONTEXT.md, full TODO.md, full handoff files, and phase notes as targeted or
on-demand recovery sources.
Use rg to inspect PLAN.md, DECISIONS.md, PROJECT_CONTEXT.md, or phase notes only when
compact state is missing, conflicting, or explicitly requested. Read older entries only when
scope changes, conflicts, missing verification, unclear decision sources, or explicit history
requests require them.
The compact handoff/current-state file is not a complete history, audit log, phase table, or
PLAN.md summary. Its first 80-120 lines should contain a project summary, current phase,
recently completed work, last verification, blockers, next action, and do-not-do items.
Historical completed task lists belong in phase notes, not in the default TODO.md recovery
area.
PROJECT_CONTEXT.md is an adoption/background baseline, not a routine status file. Update it
only when stable project identity, directory responsibilities, verification commands, or
durable boundaries change.
DECISIONS.md is for durable decisions only. Do not record ordinary phase completion,
verification logs, or execution history there.
DEV_LOG.md is not a baseline workflow file, default recovery source, end-of-round record, or
recovery repair target. Legacy DEV_LOG.md files may remain in adopted projects, but the
workflow no longer requires creating, reading, or updating them.
Phase-exit and end-of-round record updates use the same bounded context rule. Do not read full
PLAN.md, TODO.md, DECISIONS.md, PROJECT_CONTEXT.md, full handoff files, or full phase
notes just to update status records. For TODO.md, read and update only the current phase,
active task, blocked, next task, and do-not-do sections. For PLAN.md, use rg or
heading-scoped reads to locate the relevant phase only when phase boundaries, scope, or
roadmap entries change. For PROJECT_CONTEXT.md, use scoped reads only for adoption or stable
baseline changes. For handoff and phase notes, read only the relevant heading or the first
80-120 lines unless a conflict requires more context.
At the end of each development round, leave a recoverable state by updating the active TODOs,
phase note, and compact handoff/current-state note. Update DECISIONS only for durable
decisions.
Verification Policy
Run actual commands before claiming completion.
Default test command:
python -m pytest -q
Rules:
- Do not use "should run" as a completion standard.
- Do not mark a phase complete when verification fails.
- Record the actual command and result in the phase note or handoff note.
- If a CLI exists, include a smoke test for the CLI.