원클릭으로
rai-epic-plan
Sequence epic stories into milestones and dependencies. Use after epic design.
Codex 또는 Claude로 설치 이 Prompt를 복사해 Codex, Claude 또는 다른 어시스턴트에 붙여 넣으면 Skill 페이지를 검토하고 설치를 진행할 수 있습니다.
메뉴
Sequence epic stories into milestones and dependencies. Use after epic design.
Codex 또는 Claude로 설치 이 Prompt를 복사해 Codex, Claude 또는 다른 어시스턴트에 붙여 넣으면 Skill 페이지를 검토하고 설치를 진행할 수 있습니다.
SOC 직업 분류 기준
Interactive adapter setup for Jira and Confluence. Detects available backends, discovers projects/spaces, generates validated YAML config. 3-4 questions max.
Evaluate design proportionality using Beck's four rules. Use after implementation.
Root cause analysis using the method best suited to the bug. Phase 3 of bugfix pipeline.
Push branch, create MR, verify artifacts complete. Phase 7 of bugfix pipeline.
Execute fix tasks with TDD and all validation gates. Phase 5 of bugfix pipeline.
Decompose fix into atomic TDD tasks. Phase 4 of bugfix pipeline.
| name | rai-epic-plan |
| description | Sequence epic stories into milestones and dependencies. Use after epic design. |
| allowed-tools | ["Read","Grep","Glob","Bash(rai:*)"] |
| license | MIT |
| metadata | {"raise.work_cycle":"epic","raise.frequency":"per-epic","raise.fase":"4","raise.prerequisites":"epic-design","raise.next":"story-start","raise.gate":"","raise.adaptable":"true","raise.version":"2.4.0","raise.visibility":"public","raise.inputs":"- scope: file_path, required, previous_skill\n","raise.outputs":"- scope: file_path, next_skill\n","raise.aspects":"introspection","raise.introspection":{"phase":"epic.plan","context_source":"scope doc from epic-design","affected_modules":[],"max_tier1_queries":3,"max_jit_queries":3,"tier1_queries":["sequencing patterns for {strategy} ordering","estimation patterns for {size} epics","milestone patterns for multi-story epics"]}} |
Transform the story list from /rai-epic-design into a sequenced implementation plan with milestones, parallel work streams, and progress tracking.
When to use: After /rai-epic-design has produced a scope document with stories. Before starting first story.
When to skip: Very small epics (2-3 stories) with obvious linear sequence. Emergency fixes.
Inputs: Epic scope document (work/epics/e{N}-{name}/scope.md), calibration data (if available).
Before starting Step 1, you MUST execute the PRIME protocol:
.raise/rai/learnings/rai-epic-design/{work_id}/record.yaml. Enrich epic-design's record with downstream: {scope_clear: bool, stories_sequenceable: bool}.rai graph query. If graph is unavailable, note and continue.Load and understand the epic scope document:
Order stories using these strategies (in priority order):
| Strategy | When | Rationale |
|---|---|---|
| Risk-first | High uncertainty features | Tackle unknowns early while energy is high and time for pivots remains |
| Walking skeleton | Architecture unproven | Build minimal E2E path first to prove architecture |
| Quick wins | Need momentum | Early deliverable value, validate tooling |
| Dependency-driven | Hard blockers exist | Unblock others on critical path |
For each story, document: position, rationale, dependencies (hard/soft/external), what it enables.
JIT: Before choosing sequencing strategy, query graph for ordering patterns and calibration data →
aspects/introspection.md § JIT Protocol
Identify parallel opportunities: Stories with no mutual dependencies, different codebase areas, or independent concerns can run concurrently.
Every story has sequencing rationale. Critical path identified. Parallel opportunities documented.Create 2-4 intermediate checkpoints:
| Milestone | Typical scope | Purpose |
|---|---|---|
| M1: Walking Skeleton | 1-3 stories (smallest E2E) | Prove architecture, enable integration |
| M2: Core MVP | 50-70% of stories | Demonstrate value, gather feedback |
| M3: Feature Complete | 100% planned stories | Ready for polish |
| M4: Epic Complete | Done criteria met | Ready for /rai-epic-close |
Per milestone: stories included, success criteria (verifiable), demo capability.
JIT: Before defining milestones, query graph for calibration patterns and checkpoint strategies →
aspects/introspection.md § JIT Protocol
Integration checkpoint: For epics with multiple components (client/server, CLI/API, frontend/backend), schedule an E2E integration milestone before the final story. This checkpoint runs real infrastructure (docker compose, actual DB) and verifies cross-story contracts (auth headers, payload schemas, parameter limits). Unit tests with mocks cannot catch these mismatches — only real E2E validates the seams between stories.
At least 2 milestones defined with clear success criteria. Multi-component epics include E2E integration checkpoint.Add progress tracking to epic scope using templates/plan-section.md:
Append the implementation plan section to work/epics/e{N}-{name}/scope.md. Include:
Present plan to human for review before starting first story.
Scope document updated. Plan reviewable in <5 minutes. Human acknowledges.| Item | Destination |
|---|---|
| Implementation plan | Appended to work/epics/e{N}-{name}/scope.md |
| Plan template | templates/plan-section.md |
| Next | /rai-story-design for first story in sequence |