| description | Use when the user describes work that spans multiple files/systems, involves architectural decisions, would exceed 9 complexity pts or span multiple sprints, or says "deep plan", "plan this feature", or "let's plan [complex thing]". Produces folder-based plans with an entry-point doc plus individually executable sub-plans. |
| user-invocable | true |
| tier | flexible |
| kind | process |
Run: `bash "$(git rev-parse --show-toplevel)/bin/harness-update-check"`
- `UPGRADE_AVAILABLE ` → tell the user: "agent-harness is available (you have ). Run `/harness-update` to pull it in." Then continue.
- `JUST_UPGRADED ` → tell the user: "agent-harness upgraded → ." Then continue.
- No output → continue silently.
Deep Plan
Plan a complex feature or workstream by doing thorough architecture analysis, identifying risks and one-way doors, then decomposing into executable sub-plans with a parallelization strategy.
This produces a folder of plans that build-plan can execute individually.
<input_document> #$ARGUMENTS </input_document>
When to use this vs other planning skills
| Skill | Scope | Output | Scale |
|---|
/ad-hoc-plan | Quick fix, small feature | Single .md file | ≤3 complexity pts |
/deep-plan | Complex feature, architectural change | Folder: 00-*.md + sub-plans | >9 pts or multi-sprint |
/plan-sprint | Full week's goals breakdown | Multiple single-file plans | Full sprint |
Use /deep-plan when:
- The work spans multiple systems or requires coordinated changes
- There are architectural decisions with long-term consequences
- The work has internal parallelization opportunities
- A single plan file would exceed ~150 lines
- The user describes something that "feels big" or has unclear scope
Phase 1: Understand the Problem
1. Load context
Read the current week's goals and existing sprint plans to understand the landscape.
2. Interrogate the request
Complex work deserves hard questions upfront. Pick the 2-3 most relevant:
- "What would success look like?" — Get a concrete picture of the end state.
- "What breaks if we don't do this?" — Distinguish between urgent and important.
- "What's the one-way door here?" — Identify decisions expensive to reverse.
- "Is this one workstream or several?" — Sometimes it's 2-3 independent improvements that don't need deep planning.
- "How does this connect to the demo script?" — If it doesn't serve a demo scene, ask why it's this week's work.
Wait for the user's answers before proceeding.
Phase 2: Deep Architecture Exploration
Use up to 3 Explore agents in parallel, each with a focused search mission:
- Agent A: Current implementation — how things work today, data flows, write paths
- Agent B: Integration points — what systems touch this, what depends on it
- Agent C: Patterns and precedent — how similar problems were solved elsewhere in the codebase
Each agent should return file paths with line numbers, concrete code snippets, and observations about gaps or risks.
Synthesize findings
- What exists — Working code, established patterns, useful primitives
- What's missing — Gaps between current state and desired state
- What's fragile — Code with hidden assumptions or scaling limits
- What's a one-way door — Decisions baked in that constrain future options
Phase 3: Architecture Analysis & Risk Assessment
One-way door analysis
For each architectural risk:
- Current behavior — What the code does today (file:line references)
- Why it's a one-way door — What makes this expensive to change later
- Cost of fixing later — What a retroactive fix would require
- Recommendation — Fix now, fix later, or accept the tradeoff
Security review
For workstreams touching authentication, data access, external APIs, or user input:
- Check workspace/tenant isolation on new queries
- Check input validation on new endpoints
- Check credential handling for new integrations
- Check access control on new mutations
Document findings. Critical issues become blocking sub-plans.
What's NOT a one-way door
Explicitly call out decisions that are safe to defer — this prevents scope creep.
Phase 4: Design & Questioning
Use a Plan agent to design the implementation approach with the full architecture analysis context.
Challenge the design
- "Is this the simplest thing that works?" — Push back on unnecessary abstractions.
- "What happens if we ship half of this?" — Can sub-plans be shipped independently?
- "Where will we regret this in 3 months?" — New code creates one-way doors too.
Present the design to the user with your concerns. Wait for input on tradeoffs before finalizing.
Phase 5: Sub-Plan Decomposition
Break the workstream into individually executable sub-plans.
Decomposition principles
- Each sub-plan is independently shippable. It has its own branch, tests, and PR.
- Shared context lives in the entry point. Architecture decisions go in
00-*.md.
- Dependency graph is explicit. Which sub-plans can run in parallel? Which must be sequential?
- Each sub-plan follows the standard template from
plan-sprint.
Parallelization strategy
For each sub-plan, identify:
- Which files it touches (non-overlapping file footprints enable parallelism)
- Which sub-plans must complete first
- Estimated complexity (pts)
- Recommended merge order
Include a time budget table:
| Sub-plan | Complexity | Can parallel? | Dependencies |
|---|
Phase 6: Write the Plan Folder
docs/plans/YYYY-wNN/sprint-plans/<workstream-slug>/
00-architecture-analysis.md # Entry point
G1-<descriptive-slug>.md # Sub-plan (executable by build-plan)
G2-<descriptive-slug>.md # Sub-plan
Entry point document (00-*.md) must include:
- Context — Why this workstream exists
- Current state summary — What works today
- One-way door analysis — Core architectural assessment
- Security review findings — If applicable
- Decisions that are NOT one-way doors — What's safe to defer
- Execution strategy & parallelization — Dependency graph, time budget
- Sub-plan index — Table linking to each sub-plan
Phase 6.5: Self-Review
Before integrating with the sprint, run this checklist against the entry-point doc (00-*.md) AND each sub-plan. Every item must pass on every doc. If any item fails, edit the doc and re-run Phase 6.5 — do not proceed to Phase 7 with known gaps.
The first item is automated. The remaining five require re-reading the doc and confirming each check yourself.
-
Placeholder scan. Run bin/test-plan-self-review <doc-file> on the entry-point doc and on each sub-plan. Exit 0 = clean; exit 1 = found one of TBD, XXX, ???, implement later, as needed, appropriate. Every match must be removed or replaced with concrete content.
-
File-footprint completeness. For each sub-plan, every Implementation Step that creates or modifies a file must list that file in the File Footprint section under Creates or Modifies. Diff the two sets and fix mismatches. (The entry-point doc has no implementation steps; skip this check on 00-*.md.)
-
Type/name consistency across sub-plans. Workstream-wide check: extract every type name, function name, and config key referenced in the entry-point doc. Confirm every sub-plan uses the same spelling and casing. Inconsistency between sub-plans is a real failure mode here — they were drafted as a set, but each was written separately.
-
Workstream scope check. Re-read the workstream goal in 00-*.md. For each sub-plan in the index, state in one sentence why it serves the workstream goal. If you can't, the sub-plan is scope creep — drop it or fold it into another sub-plan. Then within each sub-plan, repeat the per-step scope check from /plan-sprint Phase 4 item 4.
-
Ambiguity check. For each Implementation Step in each sub-plan, is the action unambiguous? Flag every ambiguous step and rewrite it concretely. (Same standard as /plan-sprint Phase 4 item 5.)
-
Done-criteria reachability. For each sub-plan, every item in its Done Criteria checklist must be testable by an Implementation Step. Also: the workstream Done criteria in 00-*.md must be covered by the union of sub-plan Done Criteria — if a workstream criterion is not addressed by any sub-plan, either add a sub-plan or drop the criterion.
Cannot check all 6 boxes? Edit the doc(s) and re-run Phase 6.5. Do not proceed to Phase 7 with unchecked items.
Phase 7: Integrate with Sprint
Update the goals document
Add the workstream to the Sprint Plan table in the goals doc. Link to the 00-*.md entry point.
Commit and push
git checkout -b docs/<workstream-slug>
git add docs/plans/YYYY-wNN/sprint-plans/<workstream-slug>/
git commit -m "docs(plans): add <workstream> architecture analysis and sprint plans"
git push -u origin docs/<workstream-slug>
gh pr create ...
Guidelines
- Architecture analysis is the deliverable, not the sub-plans. The sub-plans follow naturally from a good analysis.
- One-way doors are the priority filter. When scoping what's launch-critical vs. deferrable, ask: "Can we fix this later without a migration?" If yes, it can wait.
- Challenge early, not late. Ask hard questions in Phase 1, not Phase 5.
- Keep sub-plans independently valuable. If shipping G1 without G2 makes things worse, they should be one plan.