| description | Load when the user wants to drive a non-trivial goal to completion under rigorous sub-agent orchestration, or invokes `/goal-skill`. Triggers: "drive this goal to completion", "subagent-driven development", "SDD", "orchestrate this build", "run this end-to-end with reviewers", "build this properly with planning and validation", or setting a substantial multi-step feature/fix that warrants planned-then-reviewed-then-implemented-then-validated execution. Use for work too large or risky for a single straight-line pass.
|
| tags | ["goal","orchestration","sdd","sub-agents","planning","review","validation"] |
| alwaysApply | false |
Goal-Skill v2 — subagent-driven goal completion, fork the builders, keep the judges clean
You are the orchestrator. Like multi-review and council, you do not write
production code yourself — you dispatch sub-agents, read their results, gate the
transitions between phases, and drive convergence loops until the goal is genuinely
reached. Your value is judgment at the gates, not typing in the editor.
You are also the single writer of the task doc and its dependency map. Sub-agents
report back to you; they never write the map or the session registry themselves.
A "goal" is reached when validation passes against criteria the user agreed to —
not when the code looks done, not when tests you invented pass, not when you're tired
of iterating.
When to invoke
/goal-skill (primary entry)
- "drive this goal to completion" / "build this properly" / "orchestrate this"
- "subagent-driven development" / "SDD"
- A non-trivial feature or fix the user wants executed with planning + review + validation rigor.
Do NOT use it for: trivial one-file edits, quick questions, or work where a single
implementer pass is obviously enough. Orchestration spends real tokens. Match the
machinery to the size of the goal — the tier router below exists precisely so a small
goal doesn't pay large-goal ceremony. If the goal is small, say so and just do it.
The two-lane model (read this before dispatching anything)
v2's core idea: one base session accumulates all goal context. Builders fork from it
once and are resumed on every loop round — only the delta is new tokens. Judges stay
clean and fresh every round, meeting the work only through the task doc.
| Lane | Who | Context | Rule |
|---|
| Builders | goal-planner, goal-implementer ×N | CLI sessions, forked once, resumed per round | Fork inherits full context at cache-read price (~10%); resume pays only the delta |
| Judges | goal-plan-reviewer ×N, reviewer, goal-validator | Claude Code Agent-tool subagents | Always clean and fresh; fed only the task doc / diff — never forked, never resumed |
The task doc is the only channel between lanes — persistent, auditable, and
resumable across sessions.
Never fork a judge. Inherited framing anchors the verdict toward rubber-stamping.
A judge that only ever meets the work through the artifact stays independent.
Builder session mechanics (proven — use these exact flags)
Builders are spawned and driven via the claude CLI, not the Agent tool:
-
Spawn the planner (once, at Phase 1):
claude -p "<goal + context>" --output-format json --model <tier-model> < /dev/null
< /dev/null matters: a headless -p invocation with no stdin redirect can hang
waiting for input. Always redirect stdin explicitly. Parse the JSON response for
session_id and record it in the Session registry (below).
-
Resume the same builder for a revision round (only the delta is new tokens):
claude -p --resume <session_id> "<the delta — new findings only>" --output-format json < /dev/null
-
Fork an implementer from the planner session (Phase 4, once per task in a wave):
claude -p --resume <plannerId> --fork-session "<task Tn from the dep map>" \
--permission-mode acceptEdits --allowedTools "Write" "Edit" "Bash" \
--output-format json --model sonnet < /dev/null
--fork-session mints a new session id that inherits the planner's full context;
the planner's original session is untouched and stays resumable. Capture the new id
into the registry under impl-<taskId>.
The permission flags are not optional. A headless -p session has no interactive
permission prompt: an implementer forked without them stalls at its first Write with a
"please approve" final message and ZERO files changed (observed 2026-07-18 calendar
run — cost a wasted spawn + an extra resume round). Builders that must write always
get --permission-mode acceptEdits --allowedTools "Write" "Edit" "Bash" at fork time.
The planner and its revision resumes stay read-only — never give them write flags.
-
Re-fork on repeated failure (same finding twice): fork fresh from the planner
again rather than continuing to resume a session that is arguing with itself.
-
Verify on disk before trusting any builder report. After every implementer
run/resume returns, check git status --porcelain on its owned files BEFORE gating,
reviewing, or updating the registry. A confident report plus an empty diff means the
session never actually built — permission stall, role drift back to planner, or a
silent error. Resume or re-fork it; never let the report stand in for the work.
(Both failure modes are real: the 2026-07-18 permission stall and the earlier 7-lane
role-binding drift were each caught exactly this way.)
Fork base = the PLANNER session, never the orchestrator's own chat. The
orchestrator's Claude Code conversation is not CLI-resumable — builders always branch
from the planner's CLI session, not from you.
Keep the base lean. Messy exploration (grepping around, reading half-relevant
files) happens in throwaway Explore agents dispatched before the fork point. A fat
base session taxes every fork that inherits it.
Session registry (pinned format — write exactly this block into the task doc)
The orchestrator writes this block into the task's technical_details in Phase 3 and
keeps it updated as builders are spawned/forked. This is the literal format — do not
improvise a different shape:
## Session registry
planner: <session_id> # from claude -p --output-format json
planner-refork: <session_id | —> # set only if a fresh re-fork happened
impl-<taskId>: <session_id> # one line per implementer, forked from planner
e.g. impl-T4: abcd1234
Any later session can resume a builder by looking up its id here — this is what makes
a v2 goal recoverable across separate orchestrator sessions.
Commitment ritual (do this FIRST — non-negotiable)
Before dispatching anything, YOU MUST:
- Announce: restate the goal back to the user in one sentence, and say "I'm running
the goal-skill v2 orchestration."
- Create a TodoWrite list with the phases (tier-appropriate — see router below) as
items. This is your accountability mechanism — a phase is not done until its exit
gate passes.
- Track convergence rounds in TodoWrite, not a fixed cap. For each loop, the todo
text carries the live state, e.g.
Phase 2: plan review (round 2 — new findings, resuming planner). This makes the loop externally observable so you cannot silently
loop forever or stop early.
Skipping the ritual is the first step toward abandoning the loops. Don't.
Tier router (inline, before Phase 1)
Classify the goal S / M / L using the same thresholds multi-review's router uses for
diff size/domain (see that skill for the exact bands) applied to the estimated scope
of the goal rather than an existing diff:
| Tier | Ceremony |
|---|
| S — trivial/small, single file or two | Skip plan review entirely. No dependency map. One serial implementer. |
| M — moderate, several files, one clear owner per file | 1 plan-review lens. Dependency map only if more than one file-owning task exists. |
| L — large, cross-cutting, or many files | 2–3 plan-review lenses in parallel. Full dependency map required. |
Hot-path override: if the goal touches auth, crypto, env/secrets, or database
migrations, force tier L regardless of estimated size. These surfaces don't get
to skip rigor because the diff looked small.
Model/effort by tier:
- Planner model: L → opus, M/S → sonnet (set via
--model at spawn).
- Planner always thinks xhigh — the dependency map must be right, or the whole wave
structure is unsafe.
- Implementers always think high.
Orchestration flow
flowchart TD
P0[Phase 0 — one batched ask to the user] --> PT[Tier router: S / M / L, hot-path override]
PT --> P1[Phase 1 — goal-planner: FORK once, plan + dep map, xhigh]
P1 --> P2{Phase 2 — plan-reviewers, clean, parallel: all SOLID?}
P2 -->|new blocking findings| R1[RESUME planner with the delta]
R1 --> P1
P2 -->|same findings repeat| RF1[one fresh RE-FORK of the planner]
RF1 --> P1
P2 -->|still stuck after re-fork, or valve at 8 rounds| ESC1[ESCALATE to user — do NOT proceed]
P2 -->|all SOLID| P3[Phase 3 — persist plan + dep map + session registry as a dreamcontext task]
P3 --> P4[Phase 4 — implementers FORK per task, parallel waves, high]
P4 --> GATE{build + test gate between waves}
GATE -->|FAIL| R2[RESUME the owning implementer]
R2 --> P4
GATE -->|pass, last wave done| P5{Phase 5 — reviewer, clean, once: PASS?}
P5 -->|FAIL, new findings| R3[RESUME the owning implementer]
R3 --> P4
P5 -->|FAIL, same findings repeat| RF2[re-fork the implementer fresh]
RF2 --> P4
P5 -->|still stuck, or valve at 8 rounds| ESC2[ESCALATE to user — do NOT proceed]
P5 -->|PASS| P6{Phase 6 — goal-validator, clean, evidence: PASS?}
P6 -->|FAIL| R4[RESUME the owning implementer]
R4 --> P4
P6 -->|PASS| DONE[Goal reached — validation passed, mark task completed + tell the user]
Phase 0 — Scope & validation method (ONE batched ask)
Before any sub-agent runs, ask the user one batched message covering everything you
need up front, then go hands-off until the final report:
- Confirm the goal in one sentence ("Is this the goal: …?").
- "How should this goal be validated — unit/integration tests, or a manual
checklist?" (Playwright/browser E2E is not supported; if the user needs it, tell
them so and agree on the closest supported method.)
- If the project declares custom task fields (
_dream_context/overrides/task.md)
with ask: true, ask for those values now (human judgment, not something to
fabricate).
- If the project has roadmap objectives (
_dream_context/core/objectives/
non-empty), ask which objective(s) this goal serves, unless it's obvious.
Capture all answers in TodoWrite — they are written into the task in Phase 3. Never
skip this question. A goal with no agreed validation method cannot be "reached" —
you'd be grading your own homework.
If you are running fully autonomously with no user available, default the validation
method to "the project's existing test suite must pass (npm test) plus a build",
record that you chose it, and surface it for confirmation.
Phase 1 — PLAN (builder, fork once)
Do any messy pre-fork exploration in throwaway Explore agents first — keep the
planner's base lean. Then spawn one goal-planner CLI session per the mechanics
above, at the tier-appropriate model, thinking xhigh. Give it the confirmed goal + the
relevant skills to load. Record its session_id in the Session registry.
It returns a file-by-file plan; it does NOT write code or the task doc. A plan that
says "update the relevant files" is rejected — resume it with that feedback.
For M and L tiers, the plan must also include a dependency-map table with
exactly these columns:
task | files owned | depends on | wave | contract
Safety rules the planner must apply when building the map:
- Same file → same lane. Tasks that touch the same file are auto-dependent — never
scheduled in the same wave.
- Contracts pinned. Exact signatures/types for every cross-task interface, so
parallel tasks can't diverge.
- Bounded. Max ~3 concurrent implementers per wave. The map exists only for M/L
tiers — S is one serial implement, no map.
Phase 2 — PLAN REVIEW (judges, clean, parallel)
Dispatch goal-plan-reviewer Agent-tool subagents in parallel, in a single message,
lens count per tier (S: skip this phase entirely; M: 1 lens; L: 2–3 lenses):
- pragmatist — scope/YAGNI.
- critic — correctness/assumptions, and (when a dep map exists) whether the map
itself is safe: contracts pinned, no same-file tasks in the same wave, waves acyclic.
- security — only when the goal is hot-path (auth/crypto/env/migrations).
Each reviewer is fed only the plan text from the task doc — never the planner's
session. Each returns SOLID | NEEDS_WORK + blocking findings.
Convergence by signal, not a counter:
- All reviewers
SOLID → proceed to Phase 3.
- New blocking findings →
--resume the same planner session with the delta.
- The same findings repeat after a resume → do one fresh re-fork of the planner
from its original session, and try again.
- Still stuck after the re-fork → ESCALATE to the user with the unresolved
findings — do NOT silently proceed.
- Safety valve: 8 rounds total. This is spend protection, not a definition of
done — hitting it means escalate, same as a genuine stuck loop. It does not mean
"good enough, proceed."
Phase 3 — TASK DOC + SESSION REGISTRY (the validated plan becomes the source of truth)
Once the plan is SOLID, persist it as a dreamcontext task — the existing task system
is the single source of truth from here on (no parallel doc), and you are its single
writer:
dreamcontext tasks create "<sentence-style goal name>" -p high -w "<why>"
dreamcontext tasks insert <slug> acceptance_criteria "<criterion>"
dreamcontext tasks insert <slug> acceptance_criteria "Validation method: <user choice>"
dreamcontext tasks insert <slug> technical_details "<file-by-file plan + dependency-map table>"
dreamcontext tasks insert <slug> technical_details "<the Session registry block, pinned format above>"
dreamcontext tasks insert <slug> constraints "<decisions, out-of-scope>"
dreamcontext tasks status <slug> in_progress "plan validated; implementing"
If <slug> already exists, de-collide (append a short suffix) rather than clobbering.
Link the task to any confirmed roadmap objectives (tasks create --objectives a,b or
dreamcontext tasks objectives <slug> a,b). Never leave an obviously-serving task
unlinked, and never overwrite an existing non-empty objectives: list.
If the project declares custom required task fields, set each with --field key=value on create — tasks create hard-fails otherwise.
Log a phase timestamp (dreamcontext tasks log <slug> "PHASE TIMESTAMPS — P3 task doc <time>") — do this at every phase transition from here on, so the final report
gets a timing breakdown for free.
Phase 4 — IMPLEMENT (builders, parallel waves, fork + resume)
For each task in the current wave, fork an implementer from the planner session per
the mechanics above (--resume <plannerId> --fork-session), at sonnet, thinking high.
Capture each fork's session_id into the registry under impl-<taskId>. Every
implementer must load the engineering skill — non-negotiable.
Wave execution rules (mirrors the dependency map exactly):
- Max 3 concurrent implementers.
- Implementers only touch the files listed as
files owned for their task — this is
what makes the parallel waves safe.
- Build + test gate between waves. A gate FAIL routes back to
--resume on the
specific owning implementer for that file — not a broader re-implement.
- Report ≠ work. Before running the gate, verify each implementer's owned files
actually changed on disk (
git status --porcelain — mechanics rule 5). Empty diff +
confident report = the fork stalled or drifted; resume/re-fork before anything else.
- You are the single writer of the task doc and dependency map. Implementers report
progress and status back to you; they never edit the map or registry directly, and
never write to the task doc concurrently with each other.
- The dependency map (and this wave discipline) exists only for M/L tiers; S tier is
one serial implement with no map.
On a re-implement after a FAIL, --resume the owning implementer's session with the
specific failure — don't churn unrelated code, and don't re-explain what it already
knows from its own context.
Log a phase timestamp at the start and end of each wave.
Phase 5 — CODE REVIEW (judge, clean, once)
Full code review runs once, after the last wave — per-wave gates are build+test
only, not a full review. Dispatch the existing reviewer agent (do NOT create a new
one), clean context. Tell it the base ref/branch so it runs git diff itself — do
not paste a raw diff into its prompt.
Convergence by signal:
PASS → proceed to Phase 6.
- New findings →
--resume the specific owning implementer with the failure.
- The same findings repeat → re-fork that implementer fresh from the planner and
retry.
- Still stuck → ESCALATE to the user with the unresolved findings.
- Safety valve: 8 rounds. Spend protection only, same as Phase 2 — never a
"proceed anyway" signal.
Phase 6 — VALIDATE (judge, clean, evidence — the real gate)
Dispatch one goal-validator (sonnet, clean context). It runs the user-chosen
validation method recorded in the task and returns PASS | FAIL with evidence (exact
command + output).
- FAIL → append the failure report to the task (
dreamcontext tasks log), and route
back to Phase 4 — --resume the owning implementer with the specific failure. Loop
IMPLEMENT → REVIEW → VALIDATE until validation PASSES.
- PASS → the goal is reached. Close it:
dreamcontext tasks status <slug> completed "all criteria met; validation passed via <method>", log the final phase timestamp, then tell the user it's done — what
shipped, the evidence, and the phase-timing report assembled from your logged
timestamps. Only leave it in in_review instead if the validation surfaced something
a human should still eyeball before closing.
Live run state + viewer
The goal-skill pack maintains one live state file per orchestrator session —
concurrent runs in different sessions each get their own file and never clobber each
other. The primary surface is the dreamcontext app: the native live panel (above the
composer in Terminal view, on the live rail in Chat view) + the dock chip render your run
automatically (via the dashboard server) — nothing to start, nothing to announce.
At run start (right after the goal is confirmed, before Phase 1): write the initial
live file (snippet below) with "phase":"plan". That's it — the app picks it up on its
own. Do NOT start the standalone viewer or point the user at localhost unless they
explicitly ask for a browser view outside the app (then:
node .claude/goal-skill-viewer.cjs → http://localhost:4747).
You (the orchestrator, single writer of YOUR run's file) then maintain
_dream_context/tmp/.goal-skill-live.${CLAUDE_CODE_SESSION_ID}.json at every
phase transition, loop-back, and implementer state change:
mkdir -p _dream_context/tmp \
&& find _dream_context/tmp -name '.goal-skill-live*.json' -mmin +180 -delete 2>/dev/null \
; cat > "_dream_context/tmp/.goal-skill-live.${CLAUDE_CODE_SESSION_ID:-solo}.json" <<EOF
{"goal":"<slug>","session":"${CLAUDE_CODE_SESSION_ID:-}",
"started":"<run-start ISO8601>","updated":"<now ISO8601>",
"phase":"impl","iters":{"plan":2,"review":2},
"impl":{"wave":1,"waves":3,"forks":[{"s":"done"},{"s":"run"},{"s":"wait"}]}}
EOF
(the find … -delete opportunistically sweeps abandoned runs older than 3h; it is
best-effort — never let it block a write)
-
Per-session filename: the file is named by YOUR $CLAUDE_CODE_SESSION_ID, so
two goal-skill runs in two different Claude Code sessions of the same project each
keep their own live state — both renderers scan every .goal-skill-live*.json in
_dream_context/tmp/ and pick the run matching the viewing session. (The legacy
unsuffixed .goal-skill-live.json is still read for back-compat.)
-
session: ALWAYS include it exactly as above (the shell expands
$CLAUDE_CODE_SESSION_ID). It scopes the live surfaces to YOUR session — other
Claude Code sessions open on the same project stay clean. Without it the run state
leaks into every session of the project.
-
phase: plan | review | task | impl | codereview | validate | done.
-
iters.<phase>: loop count for that phase — the renderers glow hotter the more it
looped (×2 yellow, ×3 bright, ≥4 red).
-
impl.forks[].s: run | done | wait | fail — one dot per implementer fork;
wave/waves show wave progress.
-
Set "phase":"done" on Phase-6 PASS, then delete YOUR file after the final
report (also delete on escalation):
rm -f "_dream_context/tmp/.goal-skill-live.${CLAUDE_CODE_SESSION_ID:-solo}.json"
— never rm the whole glob; another session's run may be live. A file older than
3h is treated as abandoned and ignored by the renderers.
-
Never let live-state upkeep block a phase; it is telemetry, not a gate.
-
Optional standalone viewer (on request only): .claude/goal-skill-viewer.cjs
serves http://localhost:4747 — phase nodes with arrows, loop-back arcs that glow
hotter per iteration, implementer forks as satellite dots around IMPL, wave counter,
and a run-switcher chip row when more than one session has a live run. Same JSON, no
extra upkeep. Useful when the user works outside the dreamcontext app.
-
node .claude/goal-skill-demo.cjs drives a fake run through every phase — useful to
demo the live surfaces without spawning agents.
Convergence rules (how the loops end)
- Loops converge on a signal, never a fixed round count. All judges SOLID/PASS →
proceed. New blocking findings → resume the builder with the delta. The same findings
repeating after a resume → one fresh re-fork, then retry. Still stuck after the
re-fork → escalate.
- The safety valve is 8 rounds, and it exists purely to protect spend — hitting it
means escalate, exactly like a genuine stuck loop means escalate. It is never license
to declare "good enough" and proceed.
- Before each loop-back, update the TodoWrite round state so the loop stays externally
observable.
- "Reached the goal" is defined by Phase 6 validation passing — nothing else.
Red Flags — STOP, you're about to break the loop
| Thought | Reality |
|---|
| "The plan looks fine, I'll skip plan review." | Plan review is mandatory for M/L tiers. You are not the reviewer. Dispatch them. |
| "One reviewer flagged a minor thing — close enough, proceed." | Not all-SOLID = NEEDS_WORK. Resume, re-fork, or escalate — never skip. |
| "I'll just implement it myself, dispatching is overhead." | The orchestrator never writes production code. Fork an implementer. |
| "Validation is flaky, I'll mark it passed." | A flaky or skipped validation is a FAIL. No PASS without evidence. |
| "I'll let the implementer review its own work." | Self-review is not review. Use the clean-context reviewer. |
| "I'll skip asking the user how to validate, tests are obviously the way." | Phase 0 is non-negotiable. Validation criteria are the user's call. |
| "We've resumed this planner 6 times, but I think the next round fixes it." | Repetition is the signal to re-fork, not to keep resuming a session arguing with itself. |
| "We hit the safety valve — 8 rounds is a lot, let's just ship it." | The valve protects spend; it does not define done. Escalate, don't proceed. |
| "I'll fork a judge so it doesn't have to re-read the diff." | Never fork a judge — inherited framing produces a rubber stamp, not a verdict. |
| "Two implementers can both touch the task doc, I'll sort it out after." | You are the single writer. Implementers report to you; they never write the map/registry. |
| "I'll mark it complete because I think it's done." | Done is defined by Phase 6 validation passing with evidence — not by your hunch. |
| "The implementer's report says it built everything — on to review." | Reports lie when forks stall (permission gate) or drift (role-binding). git status its owned files first; empty diff = nothing happened. |
Rationalization table
| If you think… | The truth is… | So… |
|---|
| "Reviewers will just rubber-stamp, so why iterate?" | Reviewers that rubber-stamp are mis-prompted. Give them a lens and demand a verdict. | Dispatch with distinct lenses; treat NEEDS_WORK as binding. |
| "The validation method doesn't matter much." | It's the entire definition of done. Get it wrong and you ship the wrong thing. | Ask in Phase 0; write it into the task. |
| "Re-implementing after a validation FAIL wastes the work." | Shipping unvalidated work wastes more — it fails in production instead. | Route back to Phase 4, --resume the owning implementer, fix the actual failure. |
| "Escalating after the safety valve looks like I failed." | Escalating at the valve is the disciplined outcome. Silently proceeding is the failure. | Escalate with the specific unresolved findings. |
| "Resuming keeps failing, but forking fresh feels wasteful." | A session that keeps producing the same failure is anchored on bad framing. | Re-fork once from the planner; that's the designed escape hatch, not waste. |
Hard rules
- Orchestrator never writes production code. Dispatch builders.
- Orchestrator is the single writer of the task doc, the dependency map, and the
session registry. Sub-agents report back; they never write these directly.
- Builders (planner, implementers) are CLI sessions, forked once from the planner
and resumed per round via
--resume/--fork-session. Judges (plan-reviewers,
reviewer, validator) are Agent-tool subagents, always clean and fresh, never forked
or resumed.
- Plan reviewers run in parallel, in one message, when the tier calls for review.
- Never skip Phase 0's validation-method question.
complete only after Phase 6 PASS — validation passing with evidence is the
definition of done; never complete on a hunch, and never before validation.
- Tell
reviewer to run git diff itself; don't paste diffs into prompts.
- Convergence is by signal, not a fixed round count. New findings → resume;
repeated → one re-fork → escalate. This is backstopped by an 8-round safety valve
that protects spend and never defines done.
- Same file → same lane. Wave-parallel implementers never share a file.
- Full code review runs once, after the last wave — per-wave gates are build+test
only.
- Every implementer loads the engineering skill. Non-negotiable.
- Feature goals end with integration wiring. When the goal ships a new feature/subsystem, the plan and the final wave MUST apply the project's
knowledge/patterns/feature-integration-pattern.md checklist (skill docs, Entity Router, reference section, sleep docs, sub-agent contracts, skill-pack scan) — a feature the skill doesn't describe is invisible to future sessions.
- Use the
dreamcontext skill throughout — the task doc is the source of truth.
Relationship to other orchestration surfaces
| Surface | Stage | Relationship |
|---|
goal-skill (this) | End-to-end build of a goal | Owns the full plan→implement→validate lifecycle. |
council | Decide between options | Use before a goal if the approach is contested; goal-skill then executes the decision. |
multi-review | Post-implementation review of a multi-domain diff | goal-skill's Phase 5 uses the single reviewer; for large multi-domain diffs, the orchestrator may swap in multi-review instead. Its router thresholds also back the tier router above. |
reviewer agent | Final code gate | Reused directly as Phase 5. |
Slash command wiring
/goal-skill invokes this skill. Natural-language triggers in When to invoke also
load it. (Named goal-skill, not goal, to avoid colliding with the built-in /goal
session-goal command.)