Validates compliance with 9 Constitutional Articles and Phase -1 Gates before implementation.
Trigger terms: constitution, governance, compliance, validation, constitutional compliance,
Phase -1 Gates, simplicity gate, anti-abstraction gate, test-first, library-first,
EARS compliance, governance validation, constitutional audit, compliance check, gate validation.
Enforces all 9 Constitutional Articles with automated validation:
- Article I: Library-First Principle
- Article II: CLI Interface Mandate
- Article III: Test-First Imperative
- Article IV: EARS Requirements Format
- Article V: Traceability Mandate
- Article VI: Project Memory
- Article VII: Simplicity Gate
- Article VIII: Anti-Abstraction Gate
- Article IX: Integration-First Testing
Runs Phase -1 Gates before any implementation begins.
Use when: validating project governance, checking constitutional compliance,
or enforcing quality gates before implementation.
2026-01-01
steering skill
Trigger terms: steering, project memory, codebase analysis, auto-update context, generate steering, architecture patterns, tech stack analysis, project structure, analyze codebase, understand project
Use when: User requests involve steering tasks.
2026-01-01
Validates complete requirements traceability across EARS requirements → design → tasks → code → tests.
Trigger terms: traceability, requirements coverage, coverage matrix, traceability matrix,
requirement mapping, test coverage, EARS coverage, requirements tracking, traceability audit,
gap detection, orphaned requirements, untested code, coverage validation, traceability analysis.
Enforces Constitutional Article V (Traceability Mandate) with comprehensive validation:
- Requirement → Design mapping (100% coverage)
- Design → Task mapping
- Task → Code implementation mapping
- Code → Test mapping (100% coverage)
- Gap detection (orphaned requirements, untested code)
- Coverage percentage reporting
- Traceability matrix generation
Use when: user needs traceability validation, coverage analysis, gap detection,
or requirements tracking across the full development lifecycle.
2026-01-01
steering skill
Trigger terms: steering, project memory, codebase analysis, auto-update context, generate steering, architecture patterns, tech stack analysis, project structure, analyze codebase, understand project
Use when: User requests involve steering tasks.
2026-01-01
Validates complete requirements traceability across EARS requirements → design → tasks → code → tests.
Trigger terms: traceability, requirements coverage, coverage matrix, traceability matrix,
requirement mapping, test coverage, EARS coverage, requirements tracking, traceability audit,
gap detection, orphaned requirements, untested code, coverage validation, traceability analysis.
Enforces Constitutional Article V (Traceability Mandate) with comprehensive validation:
- Requirement → Design mapping (100% coverage)
- Design → Task mapping
- Task → Code implementation mapping
- Code → Test mapping (100% coverage)
- Gap detection (orphaned requirements, untested code)
- Coverage percentage reporting
- Traceability matrix generation
Use when: user needs traceability validation, coverage analysis, gap detection,
or requirements tracking across the full development lifecycle.
2026-01-01
Copilot agent that assists with systematic design review using ATAM (Architecture Tradeoff Analysis Method), SOLID principles, design patterns, coupling/cohesion analysis, error handling, and security requirements
Trigger terms: design review, architecture review, ATAM, SOLID principles, design patterns, coupling, cohesion, ADR review, C4 review, architecture analysis, design quality
Use when: User requests involve design document review, architecture evaluation, or design quality assessment tasks.
2026-01-01
Copilot agent that assists with systematic requirements review using Fagan Inspection and Perspective-Based Reading (PBR) techniques
Trigger terms: requirements review, specification review, SRS review, Fagan inspection, perspective-based review, requirements validation, requirements verification, quality gate review, formal inspection, requirements checklist
Use when: User requests involve requirements review, validation, or inspection tasks.
2026-01-01
site-reliability-engineer
Production monitoring, observability, SLO/SLI management, and incident response.
Trigger terms: monitoring, observability, SRE, site reliability, alerting, incident response,
SLO, SLI, error budget, Prometheus, Grafana, Datadog, New Relic, ELK stack, logs, metrics,
traces, on-call, production monitoring, health checks, uptime, availability, dashboards,
post-mortem, incident management, runbook.
Completes SDD Stage 8 (Monitoring) with comprehensive production observability:
- SLI/SLO definitions and tracking
- Monitoring stack setup (Prometheus, Grafana, ELK, Datadog, etc.)
- Alert rules and notification channels
- Incident response runbooks
- Observability dashboards (logs, metrics, traces)
- Post-mortem templates and analysis
- Health check endpoints
- Error budget tracking
Use when: user needs production monitoring, observability platform, alerting, SLOs,
incident response, or post-deployment health tracking.
2025-12-24