| description | Selects a subset of use cases for a sprint, refines requirements, evolves the entity model and use case diagram, generates specs and designs, and produces a sprint readiness report. Treats requirements, entity model, and use case diagram as living documents that evolve per sprint while protecting delivered use cases as immutable. Use when the user asks to "prepare a sprint", "scope a sprint", "refine for sprint", "get use cases ready for delivery", "sprint planning", or mentions sprint preparation, sprint scoping, or delivery readiness.
|
Prepare Sprint
Instructions
Select, refine, and validate a subset of use cases for sprint-scoped delivery. Accepts use case IDs
as $ARGUMENTS (e.g., UC-001 UC-002 UC-003). If no arguments are provided, display the status
table from Phase 1 and ask the user which use cases to include.
This skill produces sprint-scoped artifacts in docs/sprints/next-sprint/ and ensures every
selected use case has a complete specification and frontend design derived from refined
requirements before delivery begins.
Prerequisites
The following must exist before running this skill:
docs/requirements.md — the broad requirements (from /requirements or human-authored)
docs/use_cases.puml — the use case diagram with UC IDs, actors, and relationships (from /use-case-diagram)
docs/entity_model.md — the entity model with Mermaid ER diagram (from /entity-model)
docs/wireframes/index.html — the project wireframe (from /generate-wireframe)
If any prerequisite is missing, stop and tell the user which /command to run first.
The use case diagram is the structural backbone. It provides the canonical UC IDs, actor
assignments, and dependency relationships (includes/extends) that this skill operates on. The
requirements file provides the substance — functional requirements, NFRs, business rules, and
acceptance criteria. Both are required inputs and are read together.
Nexa Rules Gate
Read and follow ${CLAUDE_PLUGIN_ROOT}/shared/readiness/NEXA_RULES_GATE.md.
Immutability Rule — Delivered Use Cases
Delivered use cases are immutable. A use case is delivered if docs/delivery/UC-XXX-iterations.md
exists and the use case has passed evaluation.
The following rules apply to delivered use cases:
- NEVER modify a delivered use case specification (
docs/use_cases/UC-XXX.md)
- NEVER modify a delivered use case design (
docs/designs/UC-XXX-design.html)
- NEVER rename, renumber, split, or merge a delivered use case
- NEVER select a delivered use case for inclusion in a sprint
- NEVER modify the delivered use case's entry in
docs/use_cases.puml (except adding new
relationships that point TO it from new use cases)
- NEVER modify the delivered use case's mapped requirements in
docs/requirements.md
If sprint refinement reveals that a delivered use case needs changes (bug fix, enhancement,
behavioral change), that change MUST be documented as a change request using the /change-request skill:
- Run
/change-request with a description of the needed change and the delivered UC as the reference
- The CR-XXX document describes only the delta — what changes from the delivered behavior
- The CR is tracked and delivered as a separate work item (not a new use case)
- Do NOT create a new UC to represent a behavioral change to a delivered use case
This rule exists because the delivered use case spec is the as-built contract. The implementation,
tests, and evaluation all reference it. Changing it retroactively invalidates the entire delivery chain.
Living Documents
These project artifacts evolve with each sprint:
docs/requirements.md — Updated with refined, added, or deprecated requirements.
Keep the file clean — no inline provenance tags. The sprint changelog records what
changed and why; git blame provides the history.
docs/entity_model.md — Updated with new entities, attributes, or relationships
discovered during refinement. Entity changes must be reflected in a Prisma migration.
docs/use_cases.puml — Updated when use cases are added, split, or merged.
Only undelivered use cases may be structurally changed. Delivered entries are frozen.
All changes to living documents are proposed in Phase 3, reviewed by the user, and applied in
Phase 4. The sprint changelog records every change for traceability.
DO NOT
- Skip Phase 1 status assessment — always show the current state before proceeding
- Proceed past Phase 3 without user review and approval
- Modify any delivered use case spec, design, or diagram entry (see Immutability Rule)
- Select delivered use cases for sprint inclusion
- Create new use cases to represent behavioral changes to delivered use cases — use
/change-request instead
- Apply changes to living documents without user approval
- Generate specs or designs using broad requirements — always use refined requirements
- Invent use cases that have no basis in requirements or the use case diagram
- Add inline provenance tags to
docs/requirements.md — use the changelog instead
- Skip the external dependency audit — every selected UC must be checked for third-party
accounts, API keys, infrastructure, manual configuration, and secrets before proceeding
- Include a use case that depends on a technical task (TT-XXX) unless that TT is resolved or included in the sprint
Sprint Directory
All sprint-scoped artifacts go in:
docs/sprints/next-sprint/
This is always the upcoming or in-progress sprint. When a sprint is completed,
/sprint-complete archives it to sprint-N/ (e.g., sprint-1/, sprint-2/).
This skill always writes to next-sprint/.
If docs/sprints/next-sprint/ already exists and contains a readiness-report.md, warn
the user that a previous sprint preparation exists and ask whether to overwrite or abort.
Pipeline
Execute these phases in order.
Phase 1: Print Scope
Assess the current state of all use cases in the project using BOTH the requirements and the
use case diagram as input.
- Read
docs/use_cases.puml — extract all UC IDs, names, actors, and relationships
(includes/extends/dependencies). This is the canonical list of use cases.
- Read
docs/requirements.md — identify the functional requirements (FR-XXX), their priorities,
and their mapped use cases. Cross-reference FRs to UC IDs from the diagram.
- Read
docs/entity_model.md — note the current set of entities for later validation.
- Scan
docs/use_cases/ for existing specification files.
- Scan
docs/designs/ for existing design files.
- Check if
docs/designs/DESIGN_RULES.md exists.
- Scan
docs/delivery/ for iteration logs (indicating a use case has been delivered).
- Scan
docs/change_requests/ for existing CR documents — note each CR's ID, title, status
(Open / Implemented / Done), and referenced UC. For Done CRs, check whether the UC file has
an ## Amendments section listing the CR and whether docs/requirements.md reflects the change.
Print a status table with delivered use cases clearly separated:
## Project Status
### Delivered (immutable)
| UC ID | Name | Delivered In | Dependencies |
|--------|--------------------|-------------------|--------------|
| UC-001 | Register with Email | sprint-1 | None |
| UC-001A| Verify Email | sprint-1 | UC-001 |
### Undelivered (available for sprint)
| UC ID | Name | Spec | Design | Priority | Dependencies | Mapped FRs | Status |
|--------|---------------------|------|--------|----------|-----------------------|---------------------|---------|
| UC-001B| Login | No | No | P2 | UC-001A (delivered) | FR-AUTH-01..04 | Ready |
| UC-003 | Onboarding Wizard | No | No | P3 | UC-001A (delivered) | FR-ONB-01..09 | Ready |
| UC-005 | Volunteer Profile | No | No | P4 | UC-003 | FR-PROF-01..09 | Blocked |
### Change Requests
| CR ID | Title | References | Status | Live Docs Synced |
|--------|--------------------------------|------------|-------------|------------------|
| CR-001 | Replace Role with Department | UC-007 | Done | ⚠️ UC-007 amendments missing |
| CR-002 | Add audit log to checkout | UC-012 | Open | — |
- UC IDs and names: From
docs/use_cases.puml (the canonical source)
- Spec: "Yes" if
docs/use_cases/UC-XXX.md exists, "No" otherwise
- Design: "Yes" if
docs/designs/UC-XXX-design.html exists, "No" otherwise
- Priority: From requirement priorities in
docs/requirements.md if available, "—" otherwise
- Dependencies: From
docs/use_cases.puml relationships; annotate whether each is delivered
- Mapped FRs: Functional requirements from
docs/requirements.md that trace to this UC
- Status: "Ready" if all dependencies are delivered or in scope, "Blocked" otherwise
- Live Docs Synced: For Done CRs — ✅ if both UC amendments and requirements entry are updated; ⚠️ with detail if either is missing; — for non-Done CRs
If docs/change_requests/ does not exist or is empty, omit the Change Requests section.
Also print a brief requirements coverage summary and design rules status:
### Requirements Coverage
- **Total FRs:** 80 | **Mapped to UCs:** 72 | **Unmapped:** 8 (FR-AUTH-05, FR-MSG-07, ...)
- **Total UCs:** 15 | **Delivered:** 2 | **Remaining:** 13
- **Change Requests:** 2 total (1 Done, 1 Open) | **Live Doc Gaps:** 1 (CR-001)
### Design Rules
- **Status:** ✅ `docs/designs/DESIGN_RULES.md` exists | ⚠️ No design rules defined
If design rules do not exist, print a recommendation:
Recommendation: Before generating designs, consider creating docs/designs/DESIGN_RULES.md
with project-wide layout rules (shared header/footer, sidebar, navigation patterns, etc.).
These rules are enforced by /design-screens, /implement, and /evaluate. Without them,
each screen is designed in isolation and may miss shared elements like headers and footers.
Phase 2: Select Use Cases
- If $ARGUMENTS contains use case IDs: use those as the selected set.
- If $ARGUMENTS is empty: ask the user which use cases to include in the sprint.
- Reject any delivered use case IDs — remind the user of the immutability rule and that
changes to delivered UCs must be new use cases.
- Display the selected set with their current status (subset of the Phase 1 undelivered table).
- Confirm with the user before proceeding.
Step gate: User must confirm the selected use case set before proceeding.
Phase 3: Refine Requirements and Propose Changes
This is the core refinement phase. It produces three outputs:
- Refined requirements for the sprint scope
- Proposed changes to the entity model
- Proposed changes to the use case diagram
Refinement depth is proportional. Use cases that already have detailed flows, business rules,
and entity mappings in docs/requirements.md get a light-touch review (verify completeness, flag
ambiguities). Use cases with skeletal descriptions get deep refinement (resolve ambiguities, add
business rules, detail acceptance criteria, flesh out alternative flows).
Step 3a: Refine Requirements
- Read
docs/requirements.md in full.
- Read
docs/use_cases.puml for the selected use cases' actor assignments, relationships, and
structural context.
- For each selected use case, identify the functional requirements (FR-XXX) that map to it:
- Match by name, user story content, and entity references
- Cross-reference with
docs/use_cases.puml actor-to-use-case mappings
- Include NFRs and constraints that apply to the selected scope
- Assess the refinement depth needed for each UC:
- Light-touch (UC already has detailed flows, business rules, entity mapping in requirements):
Verify completeness, flag ambiguities or contradictions, confirm acceptance criteria are testable
- Deep refinement (UC has skeletal description, missing business rules, no entity mapping):
Resolve ambiguities, add business rules, detail acceptance criteria, identify missing
alternative flows, specify entity interactions
- The refinement process must:
- Resolve ambiguities by making explicit decisions (document the decision and rationale)
- Add missing business rules implied by the use case relationships
- Ensure acceptance criteria are specific and testable
- Identify new requirements implied by the selected use cases but missing from requirements.md
- Flag open questions that require human input
Decision Provenance: Every decision made during refinement must be classified as either:
- EXPLICIT — Directly stated in the requirements, refinement documents, or user input. Quote the source.
- INFERRED — Deduced by the agent based on context, patterns, or common sense. State the reasoning.
This distinction must be documented in the requirements refinement proposal and carried through to implementation tickets.
Step 3b: Propose Entity Model Changes
- Read
docs/entity_model.md.
- For each entity referenced in the refined requirements and in
docs/use_cases.puml:
- Check if it exists in the entity model
- Check if all needed attributes exist
- Check if relationships are correctly modeled
- Produce a change proposal listing:
- New entities to add (with attributes, types, relationships)
- New attributes to add to existing entities
- New relationships between existing entities
- Modified attributes (type changes, new constraints)
Step 3c: External Dependency Audit
For each selected use case, run through this checklist to detect dependencies that require
provisioning, configuration, or human action outside the codebase:
- External accounts or API keys — Does this UC integrate with a third-party service
(OAuth provider, payment gateway, email/SMS service, maps API, etc.)? If yes: who
provisions the developer/production credentials? Are they already available?
- Infrastructure provisioning — Does this UC require infrastructure that doesn't exist
yet (message queue, object storage bucket, CDN, search index, cron scheduler)?
- Manual configuration — Does this UC depend on configuration that must be done in an
external system (DNS records, webhook URLs registered with a partner, allowlist entries)?
- Third-party contracts or approvals — Does this UC depend on an agreement, approval,
or sandbox access from an external party?
- Environment variables or secrets — Does this UC introduce new secrets that must be
provisioned in each environment?
For every "yes" answer:
- Create a technical task (TT-XXX) that describes the provisioning/configuration work.
- Add the technical task as a dependency of the use case in the diagram changes (Step 3d).
- Ask the user whether the prerequisite is already satisfied. If the user confirms it's
done, mark the TT as pre-satisfied in the proposal rather than creating a new task.
This audit prevents discovering missing credentials or infrastructure mid-implementation.
Step 3d: Propose Use Case Diagram Changes
- Read
docs/use_cases.puml.
- Based on the refined requirements, determine if:
- Any selected (undelivered) use case should be split into multiple use cases
- Any selected (undelivered) use cases should be merged
- New use cases are needed that were not in the original diagram
- Use case relationships (includes/extends) need updating
- Remember: delivered use cases in the diagram are untouchable
- Produce a change proposal listing each modification with rationale.
Output
Produce docs/sprints/next-sprint/requirements-refinement-proposal.md:
# Requirements Refinement Proposal
| | |
|---|---|
| **Sprint** | next-sprint |
| **Use Cases in Scope** | UC-XXX, UC-YYY, UC-ZZZ |
## Scope Summary
[2-3 sentences describing what this sprint delivers]
## Refined Requirements
### Existing Requirements (sprint-relevant)
| ID | Title | Priority | Mapped UCs | Refinement Depth | Notes |
|--------|--------------|----------|------------|------------------|-------|
| FR-001 | Create Task | High | UC-003 | Light-touch | Already detailed |
| FR-015 | ONG Verify | High | UC-007 | Deep | Missing business rules |
### New Requirements (discovered during refinement)
| ID | Title | User Story | Priority | Mapped UCs | Rationale |
|--------|--------------|------------|----------|------------|-----------|
| FR-020 | Audit Trail | As a ... | Medium | UC-003 | [Why needed] |
### Refinement Details
#### FR-001: Create Task (light-touch)
**Assessment:** Already well-specified in requirements.md. No changes needed.
**Ambiguities found:** None.
#### FR-015: ONG Verify (deep refinement)
**Original:** [quote from requirements.md — skeletal description]
**Refined:**
- [Resolved ambiguity: what documents must the ONG upload?]
- [Added business rule: Admin must respond within 48 hours]
- [Added alternative flow: incomplete submission handling]
- [Acceptance criteria: list specific testable criteria]
**Decisions:**
| Decision | Provenance | Source/Reasoning |
|----------|------------|------------------|
| ONG must upload registration certificate | EXPLICIT | FR-015: "valid registration documents" |
| 48-hour admin response SLA | INFERRED | Industry standard; no explicit SLA in requirements |
| Incomplete submissions trigger email reminder | INFERRED | UX best practice; requirements silent on handling |
## Entity Model Changes
### No changes needed
[Or list changes:]
### New Entities
#### PaymentMethod
| Attribute | Type | Constraints | Rationale |
|-----------|------|-------------|-----------|
| id | UUID | PK | Standard |
| name | String | Required | Referenced by UC-003 step 4 |
### Modified Entities
#### User
| Change | Attribute | From | To | Rationale |
|--------|-------------|------|------------|-----------|
| Add | cancelledAt | — | DateTime? | Needed for UC-003 cancellation flow |
### New Relationships
| From | To | Type | Rationale |
|------|----|------|-----------|
| Reservation | PaymentMethod | Many-to-One | UC-003 refund routing |
## Use Case Diagram Changes
### No changes needed
[Or list changes:]
### Split Use Cases
| Original (undelivered) | Split Into | Rationale |
|------------------------|------------|-----------|
| UC-010 | UC-010a: Basic Import, UC-010b: Bulk Validation | Too complex |
### New Use Cases
| UC ID | Name | Actor | Rationale |
|--------|--------------|---------|-----------|
| UC-015 | Audit Trail | System | Discovered during refinement |
### Updated Relationships
| Change | Detail | Rationale |
|--------|--------|-----------|
| Add include | UC-003 includes UC-015 | Triggers audit |
## Technical Tasks (External Dependencies)
[Technical tasks discovered by the external dependency audit. If none, state "No external
dependencies detected."]
| TT ID | Name | Required By | Status | Notes |
|--------|-------------------------------|-------------|--------------|-------|
| TT-010 | Provision Google OAuth App | UC-045 | New | Need Google Developer Console access |
| TT-011 | Provision LinkedIn OAuth App | UC-046 | New | Need LinkedIn Developer account |
| TT-012 | Configure S3 Bucket for Uploads | UC-020 | Pre-satisfied | User confirmed bucket exists |
**Questions for the user:**
- [List questions about who provisions credentials, whether accounts exist, etc.]
### Change Requests for Delivered Use Cases
[If refinement reveals that a delivered UC needs behavioral changes, file a CR — do NOT create a new UC.
Run `/change-request` after this sprint preparation is complete.]
| Delivered UC | Issue | Recommended Action |
|--------------|-------|--------------------|
| UC-001 | Missing email notification | Run `/change-request` — reference UC-001, describe the missing notification delta |
## Open Questions
[Ambiguities requiring human input. If none, state "No open questions."]
Present the requirements refinement proposal to the user for review.
Step gate: User must review and approve the requirements refinement proposal before proceeding. The user may:
- Approve as-is
- Request changes (update the proposal and re-present)
- Remove proposed changes they disagree with
- Add use cases to the sprint scope if new ones were proposed
Phase 4: Apply Approved Changes
Apply the user-approved changes from Phase 3 to the living documents.
Step 4a: Update Requirements
- Open
docs/requirements.md.
- For each new requirement approved by the user:
- Add it to the appropriate section following the existing format and structure
- For each refined requirement with deep changes:
- Update the requirement text in place with the refined content
- Do NOT remove existing requirements. Deprecated requirements are marked
[Deprecated — replaced by FR-XXX].
- Keep
docs/requirements.md clean — no inline sprint provenance tags. The changelog
in the sprint directory records what changed.
Step 4b: Update Entity Model
- Open
docs/entity_model.md.
- Apply approved entity changes:
- Add new entities with their attributes and relationships
- Add new attributes to existing entities
- Add new relationships
- Update the Mermaid ER diagram
- Flag for migration: After updating the entity model, note that
/prisma-migration
must be run before /deliver-use-case to keep the database schema in sync. Record this
in the sprint readiness report.
Step 4c: Update Use Case Diagram
- Open
docs/use_cases.puml.
- Apply approved diagram changes:
- Add new use cases
- Split undelivered use cases (remove original, add new IDs)
- Add/update relationships
- NEVER modify entries for delivered use cases — only add new relationships pointing to them
- If use cases were split or renumbered:
- Delete old (undelivered) spec files that no longer apply
- Delete old (undelivered) design files that no longer apply
- Old specs/designs for undelivered UCs are safe to remove because they haven't been
implemented against
Step 4d: Save Change Log
Produce docs/sprints/next-sprint/changelog.md:
# Sprint Change Log
**Sprint:** next-sprint
## Requirements Changes
| Action | ID | Title | Detail |
|-------------|--------|-------------|--------|
| Added | FR-020 | Audit Trail | New requirement discovered during refinement |
| Refined | FR-015 | ONG Verify | Added business rules, alternative flows, acceptance criteria |
| Deprecated | FR-003 | Legacy Auth | Replaced by FR-020 |
## Entity Model Changes
| Action | Entity/Relationship | Detail |
|------------------|-------------------------|--------|
| Added entity | PaymentMethod | New entity with id, name |
| Added attribute | User.cancelledAt | DateTime?, for cancellation flow |
| Added relationship | Reservation → PaymentMethod | Many-to-One |
## Use Case Diagram Changes
| Action | UC ID | Detail |
|----------|--------|--------|
| Split | UC-010 → UC-010a, UC-010b | Basic Import + Bulk Validation |
| Added | UC-015 | Audit Trail (system-triggered) |
| Added | UC-016 | Registration Email (change request for delivered UC-001) |
## Technical Tasks (External Dependencies)
| Action | TT ID | Name | Required By | Status |
|--------|--------|----------------------------|-------------|--------|
| Added | TT-010 | Provision Google OAuth App | UC-045 | Pending |
| Noted | TT-012 | Configure S3 Bucket | UC-020 | Pre-satisfied |
## Migration Required
[Yes/No — if entity model changed, /prisma-migration must run before delivery]
Phase 5: Validate Dependencies
Check that the sprint is viable after all changes have been applied.
-
Entity validation: For each entity referenced in the refined requirements, verify it exists
in the updated docs/entity_model.md. All entity gaps should have been resolved in Phase 4.
If any remain, report as blockers.
-
Prerequisite use case validation: For each selected use case, check its dependencies
(from the updated docs/use_cases.puml):
- If a prerequisite is delivered: OK
- If a prerequisite is in this sprint: OK (note ordering constraint)
- If a prerequisite is neither delivered nor in this sprint: report as blocker
-
Requirements traceability: Verify every selected use case maps to at least one functional
requirement in docs/requirements.md. Flag gaps as warnings.
-
Migration check: If entity model was changed in Phase 4, flag that /prisma-migration
must be run before delivery.
-
External dependency check: For each technical task (TT-XXX) created in the external
dependency audit:
- If marked as pre-satisfied: OK (user confirmed it's done)
- If new and can be done by the team before delivery: OK (note ordering constraint —
TT must be completed before its dependent UC)
- If new and requires external party action with unknown timeline: report as blocker
Print the validation report:
## Dependency Validation
### Blockers (must resolve before proceeding)
| Issue | Type | Affected | Resolution |
|-------|------|----------|------------|
### Warnings (can proceed but note risks)
| Issue | Type | Affected | Notes |
|-------|------|----------|-------|
### Ordering Constraints
| Use Case | Must Come After | Reason |
|----------|-----------------|--------|
### External Dependency Tasks
| TT ID | Name | Required By | Status | Blocker? |
|--------|----------------------------|-------------|---------------|----------|
| TT-010 | Provision Google OAuth App | UC-045 | Pending | Yes — needs external access |
| TT-012 | Configure S3 Bucket | UC-020 | Pre-satisfied | No |
### Pre-Delivery Actions Required
| Action | Skill | Reason |
|--------|-------|--------|
| Run Prisma migration | `/prisma-migration` | Entity model changed |
| Complete TT-010 | Manual | UC-045 depends on Google OAuth credentials |
Step gate: If blockers exist, stop and present them to the user. The user must resolve blockers
before the pipeline can continue.
Phase 6: Generate Specs and Designs
For each selected use case, generate the specification and frontend design using the
REFINED requirements from Phase 3.
Step 6a-pre: Update Wireframe for New Use Cases
If Phase 4 added new use cases or split existing ones, the wireframe must be updated before
generating specs and designs:
- Check if any use case IDs in the sprint scope do NOT have a corresponding screen section
(anchor
#UC-XXX) in docs/wireframes/index.html.
- If missing screens exist, read and follow:
${CLAUDE_PLUGIN_ROOT}/skills/generate-wireframe/SKILL.md
with the missing UC IDs as arguments (e.g., UC-015 UC-016).
- Verify: Every user-facing use case in scope has a wireframe screen section.
This ensures specs and designs are informed by the wireframe's screen structure.
Step 6a: Generate Use Case Specifications
For each selected use case, in dependency order:
- If
docs/use_cases/UC-XXX.md already exists AND the use case was not split or
renumbered in Phase 4, skip but log for the readiness report.
- Otherwise, read and follow:
${CLAUDE_PLUGIN_ROOT}/skills/use-case-spec/SKILL.md
with the use case ID as the argument.
Important: When generating the spec, use the refined requirements from
docs/sprints/next-sprint/requirements-refinement-proposal.md as the primary source of business
rules, acceptance criteria, and behavioral details — not the broad docs/requirements.md.
Also read docs/use_cases.puml for the UC's actor, relationships, and structural context.
- Verify: The file exists and contains Overview, Main Success Scenario, Alternative Flows,
Postconditions, and Business Rules sections.
Step gate: All selected use case specification files must exist before proceeding.
Step 6b: Generate Frontend Designs
Design rules check: Before generating any designs, check if docs/designs/DESIGN_RULES.md
exists. If it does NOT exist, ask the user:
No project design rules found (docs/designs/DESIGN_RULES.md). Design rules define shared
layout elements (header, footer, sidebar), navigation patterns, and other constraints that
apply to every screen. Without them, designs may be inconsistent.
Would you like to define design rules now, or proceed without them?
If the user wants to define rules, help them create docs/designs/DESIGN_RULES.md before
generating designs. If they choose to proceed without, continue and log it in the readiness report.
For each selected use case, in dependency order:
-
If docs/designs/UC-XXX-design.html already exists AND the use case was not changed
in Phase 4, skip.
-
Skip if the use case has no user-facing interaction (e.g., background jobs, system-triggered
processes with no UI). Log the skip reason.
-
Otherwise, launch an isolated agent (using the Agent tool) to produce the design
from a clean context. The agent must NOT have access to sprint planning context,
implementation details, or conversation history — it works only from the specification,
wireframe, entity model, and design examples.
Agent prompt:
You are an independent frontend designer. Read and follow the complete instructions in
${CLAUDE_PLUGIN_ROOT}/skills/design-screens/SKILL.md.
Create a screen design artifact for $UC_ID.
Your inputs (read these and nothing else):
- Use case specification:
docs/use_cases/$UC_ID.md
- Entity model:
docs/entity_model.md (if it exists)
- Wireframe:
docs/wireframes/index.html
- Design rules:
docs/designs/DESIGN_RULES.md (if it exists)
- Existing theme files in
docs/designs/ (if they exist)
- Example files in the skill's
examples/ directory
Your output: docs/designs/$UC_ID-design.html
Do NOT read implementation code, sprint planning documents, requirements refinement
proposals, or any file outside of the inputs listed above. Your design must be based
solely on the use case specification and wireframe.
-
Verify: The file docs/designs/UC-XXX-design.html exists and contains at least one
screen definition (check for design-screen class in the HTML).
Step gate: All applicable frontend design files must exist before proceeding.
Phase 7: Sprint Readiness Report
Run a focused analysis on only the sprint-scoped use cases and produce the readiness report.
What to analyze
Structural checks:
- Spec completeness — Every selected use case has a specification with all required sections.
- Design completeness — Every user-facing selected use case has a design artifact.
- Entity coverage — All entities referenced in sprint use case specs exist in
docs/entity_model.md.
- Migration readiness — If entity model changed, has
/prisma-migration been run? If not, flag.
- Cross-use-case consistency — Use cases that depend on each other have compatible
postconditions/preconditions. Delivery order is clear.
- Business rule consistency — No conflicting business rules across the sprint use cases.
- Requirements traceability — Every sprint FR maps to a use case; every sprint use case maps
to at least one FR.
- Pre-existing spec warning — Use cases that had pre-existing specs (not generated from refined
requirements) are flagged. Their specs may not reflect the refined business rules.
Content validation (cross-references generated specs and designs against refined requirements):
- Requirements-to-spec fidelity — For each selected use case, compare the refined requirements
(from
docs/sprints/next-sprint/requirements-refinement-proposal.md) against the generated spec
(docs/use_cases/UC-XXX.md). Flag business rules, acceptance criteria, or behavioral details
in the refined requirements that are missing or contradicted in the spec.
- Spec-to-design fidelity — For each user-facing use case, compare the spec's main success
scenario steps and alternative flows against the design (
docs/designs/UC-XXX-design.html).
Flag steps that have no corresponding UI element, missing form fields implied by entity
attributes, and interaction states (loading, error, empty) not represented in the design.
- Entity-to-spec field coverage — For each entity referenced in a spec, verify that the spec's
data inputs/outputs match the entity model's attributes. Flag entity attributes that are
referenced in the spec but missing from the entity model, and entity attributes that exist
in the model but are never referenced in any sprint spec (warning only — may be used by
other use cases).
- Alternative flow coverage — Check each spec for missing error handling and edge cases
implied by the refined requirements' business rules. Flag business rules that should produce
an alternative flow but have no corresponding flow in the spec.
- Decision provenance — Flag business rules, acceptance criteria, or behavioral details in
the specs that lack clear provenance — unclear whether the decision came from explicit
requirements or was inferred during spec generation. These are high-risk areas that may
need stakeholder validation before implementation.
- Design consistency — Across all sprint designs, check for inconsistent naming, layout
patterns, or interaction patterns for shared concepts (e.g., the same entity displayed
differently in two screens, inconsistent button labels for the same action).
- CR live-doc sync — Scan
docs/change_requests/ for any CR with status Done. For each:
- Check that the referenced UC file (
docs/use_cases/UC-XXX.md) has an ## Amendments
section that includes an entry for this CR
- Check that
docs/requirements.md reflects the behavioral change described in the CR
(the old behavior is gone or deprecated; the new behavior is stated)
- Flag each unsynced CR as a Blocker — live docs that lag behind delivered CRs will
cause the next sprint's specs and designs to be generated from stale requirements
Output
Produce docs/sprints/next-sprint/readiness-report.md:
# Sprint Readiness Report
| | |
|---|---|
| **Sprint** | next-sprint |
| **Use Cases** | UC-XXX, UC-YYY, UC-ZZZ |
## Verdict: READY FOR DELIVERY | BLOCKERS REMAIN
[1-2 sentence summary]
## Changes Applied This Sprint
| Document | Changes | See |
|----------|---------|-----|
| docs/requirements.md | 2 added, 3 refined | changelog.md |
| docs/entity_model.md | 1 entity added, 2 attributes added | changelog.md |
| docs/use_cases.puml | 1 UC split, 1 UC added | changelog.md |
## Design Rules
[✅ `docs/designs/DESIGN_RULES.md` exists — [N] rules defined | ⚠️ No design rules — designs may lack shared layout elements]
## Artifact Status
| UC ID | Name | Spec | Design | Notes |
|--------|--------------------|------------|------------|--------------------------------|
| UC-003 | Cancel Reservation | Generated | Generated | |
| UC-004 | Generate Report | Pre-existing | Generated | Spec predates refined requirements |
| UC-005a| Basic Import | Generated | Generated | Split from UC-005 |
## Delivery Order
Recommended order for running `/deliver-use-case` on each selected use case:
| # | UC ID | Name | Rationale |
|---|--------|--------------------|--------------------------------------------|
| 1 | UC-003 | Cancel Reservation | Dependencies all delivered |
| 2 | UC-005a| Basic Import | No dependency on UC-004 |
| 3 | UC-004 | Generate Report | Depends on delivered UC-002 |
## Technical Tasks (External Dependencies)
| TT ID | Name | Required By | Status |
|--------|----------------------------|-------------|---------------|
[List all TTs from the external dependency audit, or "No external dependencies."]
## Pre-Delivery Actions
| # | Action | Command | Status |
|---|--------|---------|--------|
| 1 | Run Prisma migration for entity changes | `/prisma-migration` | Required |
| 2 | Provision Google OAuth credentials | TT-010 (manual) | Required before UC-045 |
## Gaps
[Gaps found, or "No gaps identified."]
### GAP-001: [Short title]
- **Type:** [Entity Gap | Spec Inconsistency | Design Missing | Business Rule Conflict | Traceability Gap | Requirements Fidelity Gap | Spec-Design Mismatch | Missing Alternative Flow | Decision Provenance Gap | Design Consistency Issue | CR Live-Doc Sync Gap]
- **Severity:** Blocker | Warning
- **Affected:** [use case IDs]
- **Description:** [What is missing or inconsistent]
- **Recommendation:** [Specific actionable next step]
## Sprint Artifacts
- `docs/sprints/next-sprint/requirements-refinement-proposal.md`
- `docs/sprints/next-sprint/changelog.md`
- `docs/sprints/next-sprint/readiness-report.md` (this file)
## Next Steps
[If READY: list the /deliver-use-case commands in order, preceded by any required pre-delivery actions]
[If BLOCKERS: list what must be resolved and which skills to use]
Verdict logic
- READY FOR DELIVERY: No blocker-severity gaps. All specs and designs exist. Pre-delivery
actions are listed. Delivery order is clear. The user can proceed to run pre-delivery actions
followed by
/deliver-use-case for each use case in the recommended order.
- BLOCKERS REMAIN: At least one blocker-severity gap exists. List what must be resolved before
delivery can begin.
Phase 8: Update Sprints Overview Dashboard
After producing the readiness report, update the project dashboard so it reflects the
sprint being prepared. The dashboard lives at docs/sprints/sprints-overview/ and is
cumulative — it shows all sprints (past and current).
Step 8a: Bootstrap Dashboard (first sprint only)
If docs/sprints/sprints-overview/manifest.json does NOT exist, create the dashboard
infrastructure:
-
Create docs/sprints/sprints-overview/ directory.
-
Create docs/sprints/sprints-overview/manifest.json with the project skeleton:
{
"project": "<project name from docs/requirements.md or repo name>",
"currentSprint": null,
"sprints": [],
"useCases": [],
"documents": [
{ "id": "requirements", "name": "Requirements", "file": "../../requirements.md" },
{ "id": "entity-model", "name": "Entity Model", "file": "../../entity_model.md" },
{ "id": "use-case-diagram", "name": "Use Case Diagram", "file": "../../use_cases.puml" }
],
"wireframe": "../../wireframes/index.html"
}
-
Create docs/sprints/sprints-overview/index.html — the dashboard SPA that reads
manifest.json and renders sprint overviews, use case details, and document viewers.
Use the reference implementation from the skill's project repository as the template.
The dashboard must:
- Have a sidebar with Sprints, Use Cases, and Documents sections
- Show sprint cards with use case grids
- Embed markdown files via an iframe using
md-viewer.html
- Embed HTML design files directly in iframes
- Display PlantUML source inline for
.puml files
- Be responsive (mobile sidebar toggle)
- Use a clean, professional design suitable for stakeholder presentations
-
Create docs/sprints/sprints-overview/md-viewer.html — a markdown renderer page that:
- Accepts a
?file=path/to/doc.md query parameter
- Fetches and renders the markdown using the
marked library (CDN)
- Renders Mermaid diagrams using the
mermaid library (CDN)
- Posts its height to the parent frame for auto-resize
- Has clean typography suitable for embedded viewing
-
Create docs/index.html — a redirect page:
<!DOCTYPE html>
<html lang="en">
<head>
<meta charset="UTF-8">
<meta http-equiv="refresh" content="0;url=sprints/sprints-overview/">
<title>Redirecting to Project Dashboard...</title>
</head>
<body>
<p>Redirecting to <a href="sprints/sprints-overview/">Project Dashboard</a>...</p>
</body>
</html>
Step 8b: Register the Sprint in the Manifest
-
Read docs/sprints/sprints-overview/manifest.json.
-
Determine the sprint name from the readiness report or the sprint scope summary.
-
Determine the sprint ID:
- Count existing sprint entries in the
sprints array
- New ID =
sprint-<count + 1>
-
Add a new sprint entry:
{
"id": "sprint-N",
"name": "Sprint N — <theme from scope summary>",
"date": "<today's date>",
"status": "in-progress",
"useCases": ["UC-XXX", "UC-YYY", "UC-ZZZ"],
"files": {
"readiness": "../next-sprint/readiness-report.md",
"changelog": "../next-sprint/changelog.md",
"refinement": "../next-sprint/refinement-proposal.md"
}
}
-
Set currentSprint to the new sprint ID.
-
Add use case entries to the useCases array for any UCs not already present:
{
"id": "UC-XXX",
"name": "<use case name>",
"spec": "../../use_cases/UC-XXX.md",
"design": "../../designs/UC-XXX-design.html",
"delivery": "../../delivery/UC-XXX-iterations.md"
}
Skip the design field for use cases with no user-facing UI.
Skip the delivery field — it will be populated once the UC is delivered.
-
Write the updated manifest.json.
Step 8c: Report
After updating the dashboard, inform the user:
Dashboard updated: docs/sprints/sprints-overview/index.html
Sprint N registered as in-progress with [N] use cases in scope.
Open the dashboard locally to verify it renders correctly before delivery.
Phase 9: Commit and Push to Main
Sprint preparation modifies living documents and produces sprint artifacts that must be on
main before /sprint-kickoff creates the sprint branch. This phase ensures that.
This phase is mandatory. The skill is not complete until the push succeeds.
Step 9a: Stage Changes
Stage all files changed or created during sprint preparation:
git add docs/
Step 9b: Commit
Create a commit with a message summarizing the sprint scope:
docs(sprint-<N>): prepare — <UC list summary>
Where <N> is the sprint number from the manifest and <UC list summary> is a brief
list of the use case IDs in scope (e.g., UC-003, UC-004, UC-005a).
Step 9c: Push to Main
Push the commit to the remote:
git push origin main
If the push fails (e.g., due to divergence), stop and ask the user to resolve the issue
before proceeding. Do NOT force-push.
Step 9d: Confirm
Sprint preparation committed and pushed to main.
Commit: docs: prepare sprint <N> — <UC list>
You can now run /sprint-kickoff to create the sprint branch and begin delivery.