Software configuration management for EN 50128 railway software
Codex 또는 Claude로 설치 이 Prompt를 복사해 Codex, Claude 또는 다른 어시스턴트에 붙여 넣으면 Skill 페이지를 검토하고 설치를 진행할 수 있습니다.
SOC 직업 분류 기준
Project management and coordination for EN 50128 railway software development
Project management and coordination for EN 50128 railway software development
Software quality assurance techniques and auditing for EN 50128 railway software
Software testing methodologies with coverage analysis for EN 50128 C programs using Unity test framework
Software verification with static analysis and coverage for EN 50128 railway software per Section 6.2
V&V Manager coordination and independent V&V authority for SIL 3-4 EN 50128 projects
| name | en50128-configuration |
| description | Software configuration management for EN 50128 railway software |
| license | Proprietary |
| compatibility | opencode |
| metadata | {"standard":"EN 50128:2011","domain":"railway-software","role":"configuration-manager"} |
Primary user: CM agent. Load this skill before any CM operation.
Read these before any operation — do not invent rules.
| File | Answers |
|---|---|
std/EN50128-2011.md §6.6 | Change control nine aspects (a–i), §6.6.4.2 re-entry |
std/EN50128-2011.md §6.6.3 | CM normative output documents |
std/EN50128-2011.md §6.2.4.7–8 | VER functional completeness obligation; VER evidence retention |
std/EN50128-2011.md §6.2.4.13(a) | VER report content: identity/configuration of items verified |
std/EN50128-2011.md §6.3.4.9–10 | VAL verification-complete check; baseline stated in Validation Report |
std/EN50128-2011.md §9.1.4.2–3 | Baseline recording and reproducibility |
std/EN50128-2011.md §9.1.4.13 | Deployment Record as tracked evidence artifact |
std/EN50128-2011.md §9.2.4 | Maintenance-phase change assessment and Software Change Records |
std/EN50128-2011.md D.48 | SCM records every version of every significant deliverable |
tasks/BASELINE_MANAGEMENT.md | Authoritative baseline lifecycle: Diagram 1 (gate map), Diagram 2 (creation procedure), terminology, role boundaries |
activities/baseline-management.yaml | Machine-readable form of tasks/BASELINE_MANAGEMENT.md — primary runtime reference for CM baseline capability |
DELIVERABLES.md | Annex C Table C.1 deliverable matrix; per-item 2nd-check assignments |
activities/deliverables.yaml | Machine-readable deliverable catalogue |
WORKFLOW.md | Authority structure (Diagram 1), per-phase loop (Diagram 2), CCB re-entry (Diagram 4) |
document-registry.yaml (this skill dir) | Canonical document-to-path and evidence-to-path lookup table |
The following terms are NOT used in EN 50128:2011 and MUST NOT appear in any CM deliverable, agent output, or template:
| Forbidden term | Source standard | EN 50128 equivalent / correct clause |
|---|---|---|
| FCA (Functional Configuration Audit) | MIL-STD-973 / IEEE 828 | Functional completeness is VER's obligation — §6.2.4.7 |
| PCA (Physical Configuration Audit) | MIL-STD-973 / IEEE 828 | CM presence-check at baseline: §6.6, D.48 |
See tasks/BASELINE_MANAGEMENT.md Terminology note for the complete EN 50128 mapping.
| # | Technique | Ref | SIL 0 | SIL 1–2 | SIL 3–4 |
|---|---|---|---|---|---|
| 5 | Software Configuration Management | D.48 | M | M | M |
| 7 | Traceability | D.58 | R | HR | M |
| 8 | Data Recording and Analysis | D.12 | HR | HR | M |
SCM is MANDATORY at ALL SIL levels. Traceability and Data Recording are MANDATORY at SIL 3–4.
CM is the sole authority for this structure. All agents MUST call query-location before
writing any file. The layout below is normative for every project workspace.
{workspace_root}/
├── LIFECYCLE_STATE.md
├── changes/
│ └── CR-<YYYYMMDD>-<NNN>.md # one file per change request
├── baselines/
│ └── <baseline-name>/
│ └── manifest.yaml # CI manifest (Steps 4–5 in tasks/BASELINE_MANAGEMENT.md Diagram 2)
│
├── phase-1-planning/
│ ├── Software-Quality-Assurance-Plan.md
│ ├── Software-Configuration-Management-Plan.md
│ ├── Software-Verification-Plan.md
│ ├── Software-Validation-Plan.md
│ ├── reports/
│ │ └── Software-Quality-Assurance-Verification-Report.md
│ └── evidence/ # no evidence artifacts in Phase 1
│
├── phase-2-requirements/
│ ├── Software-Requirements-Specification.md
│ ├── Overall-Software-Test-Specification.md
│ ├── reports/
│ │ └── Software-Requirements-Verification-Report-template.md
│ └── evidence/ # no evidence artifacts in Phase 2
│
├── phase-3-architecture-design/
│ ├── Software-Architecture-Specification.md
│ ├── Software-Design-Specification.md
│ ├── Software-Interface-Specifications.md
│ ├── Software-Integration-Test-Specification.md
│ ├── Software-Hardware-Integration-Test-Specification.md
│ ├── reports/
│ │ └── Software-Architecture-and-Design-Verification-Report.md
│ └── evidence/
│ └── design-analysis/ # FMEA/FTA raw outputs, analysis tool logs
│
├── phase-4-component-design/
│ ├── Software-Component-Design-Specification.md
│ ├── Software-Component-Test-Specification.md
│ ├── reports/
│ │ └── Software-Component-Design-Verification-Report-template.md
│ └── evidence/
│ └── design-review/ # design inspection records, checklists
│
├── phase-5-implementation-testing/
│ ├── src/ # source code tree (IMP-owned)
│ ├── Software-Source-Code-Verification-Report-template.md
│ ├── Software-Component-Test-Report.md
│ └── evidence/
│ ├── static-analysis/ # MISRA checker raw output (.xml/.json)
│ ├── coverage/ # gcov/lcov data files, HTML reports
│ ├── test-logs/ # unit test execution logs
│ └── tool-qualification/ # tool qualification evidence (§7.4.4.14)
│
├── phase-6-integration/
│ ├── Software-Integration-Test-Report.md
│ ├── Software-Hardware-Integration-Test-Report.md
│ └── evidence/
│ ├── integration-test-logs/ # raw test execution logs
│ └── hw-integration-logs/ # hardware integration evidence
│
├── phase-7-validation/
│ ├── Software-Integration-Verification-Report-template.md
│ ├── Overall-Software-Test-Report.md
│ ├── Software-Validation-Report-template.md
│ ├── Tools-Validation-Report-template.md
│ ├── Release-Note.md
│ └── evidence/
│ ├── system-test-logs/ # system/acceptance test execution logs
│ └── validation-records/ # VAL evidence per §6.3.4
│
├── phase-8-assessment/
│ ├── Software-Assessment-Plan.md
│ ├── Software-Assessment-Report.md
│ └── evidence/
│ └── assessor-records/ # ASR review notes, checklists (§6.4.4.10)
│
├── phase-9-deployment/
│ ├── Software-Release-and-Deployment-Plan.md
│ ├── Software-Deployment-Manual.md
│ ├── Release-Notes.md
│ ├── Deployment-Records.md
│ ├── Deployment-Verification-Report.md
│ └── evidence/
│ └── deployment-records/ # §9.1.4.13 deployment evidence
│
└── phase-10-maintenance/
├── Software-Maintenance-Plan.md
├── Software-Change-Records.md
├── Software-Maintenance-Records.md
├── Software-Maintenance-Verification-Report-template.md
└── evidence/
└── maintenance-logs/ # change execution records
SQAP, SRS, COMPTESTRPT).document-registry.yaml (this skill dir) → get phase_dir and filename.{workspace_root} from .workspace JSON → examples/<project_name>/.{workspace_root}/{phase_dir}/{filename}.static-analysis, coverage, test-log).evidence_type in document-registry.yaml evidence section → get phase_dir and subdir.{workspace_root} from .workspace JSON.{workspace_root}/{phase_dir}/evidence/{subdir}/.For the complete baseline procedure, CM MUST load activities/baseline-management.yaml.
That file is the machine-readable form of tasks/BASELINE_MANAGEMENT.md (ISA PASS) and is the
single authoritative runtime reference for:
baselines[] — gate-to-baseline map (8 gates, triggers, CI scope, VER/VAL requirements)baseline_creation_procedure — 7-step procedure (Steps 1–7; pre-conditions, RACI, checks)change_request_baseline_path — CR re-entry steps CR1–CR8 and archival rulesterminology — EN 50128 audit concept ownership table (no FCA/PCA)cm_role_boundary — what CM does and does NOT do at a baseline eventrole_responsibilities — per-role RACI at baseline creationBaseline name → gate → trigger — quick index (detail in baseline-management.yaml):
| Gate | Baseline Name | VER report | VAL role |
|---|---|---|---|
| 1 | planning-baseline | SQAVR | 2nd check (items 1,3,4; item 5 exempt) |
| 2 | requirements-baseline | REQVER | 2nd check |
| 3 | design-baseline | ARCHDESIGNVER | 2nd check |
| 4 | component-design-baseline | COMPDESIGNVER | 2nd check |
| 5 | implementation-baseline | SOURCECODEVER | 2nd check |
| 6 | integration-baseline | VER review (INTVER produced in Phase 7) | 2nd check |
| 7 | release-baseline ★ | INTVER | Formal VALRPT (§6.3.4.10) |
| 9 | deployment-baseline | DEPLOYVER | 2nd check (items 36–39; item 40 exempt) |
| per-CR | per-cr-baseline | MAINTVER | 2nd check |
★ release-baseline is the most critical. §6.3.4.10 requires VALRPT to explicitly state this
baseline. §9.1.4.3 requires reproducibility throughout the operational lifetime.
Every Software Change Record MUST address all nine aspects (a–i):
| # | Aspect | Key clause |
|---|---|---|
| a | Unique identification of the change | §6.6.4.1(a) |
| b | Recording of the reasons for the change | §6.6.4.1(b) |
| c | Analysis of the consequences of the change | §6.6.4.1(c) |
| d | Approval of the change by authorised personnel | §6.6.4.1(d) |
| e | Updating of all affected documents | §6.6.4.1(e) |
| f | Recording of all affected software items (CIs) | §6.6.4.1(f) |
| g | Implementation, verification and test of the change | §6.6.4.1(g) |
| h | Reporting to all relevant parties | §6.6.4.1(h) |
| i | Maintaining traceability of the change throughout the lifecycle | §6.6.4.1(i) |
§6.6.4.2: ALL changes SHALL initiate a return to an appropriate lifecycle phase.
CM identifies the re-entry scope; COD authorizes re-entry. See WORKFLOW.md Diagram 4
and activities/baseline-management.yaml change_request_baseline_path.
Per §6.6.3, the normative CM outputs are:
changes/The SCMP is a planning input written in Phase 1 per §6.6.4.1; it is not itself a §6.6.3 output.
Results of each verification activity SHALL be retained in a format defined or referenced in the
SVP. CM is responsible for ensuring VER evidence is stored at canonical evidence/ paths and
included in the baseline manifest at each gate. CM stores; VER produces.
| Severity | Condition | CM action |
|---|---|---|
| CRITICAL | Document written to unregistered path | Invoke PM immediately via task tool |
| CRITICAL | Baseline created without COD authorization (gate-check not passed) | Invoke PM immediately via task tool |
| CRITICAL | CI changed without an approved CR | Invoke PM immediately via task tool |
| CRITICAL | VCS tag deleted or force-pushed without CCB approval + Change Record | Invoke PM immediately via task tool |
| MAJOR | Evidence artifact not stored in canonical path | Log; report at next status accounting |
| MAJOR | CR missing one of the nine §6.6.4.1(a–i) aspects | Log; return CR to originator |
| MINOR | Version tag missing or inconsistent | Log; correct at next baseline cycle |
Normative Requirement: EN 50128:2011 §5.3.2.7 requires bidirectional traceability for all deliverables. §6.5.4.14-17 requires traceability to be checked at each phase gate by VER and enforced by COD.
Official Workflow: This platform uses manual CSV creation as the official traceability workflow. CM reads deliverables and extracts trace relationships into CSV files.
Complete workflow specification: See TRACEABILITY.md Section 13 for:
Tool usage: See tools/README_TRACEABILITY.md for complete command reference and activities/traceability.yaml for machine-consumable T-rule definitions.
CM Responsibilities (from TRACEABILITY.md Section 13.1.1):
| Responsibility | When | Command/Action |
|---|---|---|
| Create traceability CSV files | After document authors complete deliverables | Read documents; extract trace relationships; write CSV files to evidence/traceability/ using naming convention doc{source}_to_doc{target}.csv |
| Validate CSV completeness | Before submitting to VER | python3 tools/workspace.py trace validate --sil {project_sil} |
| Pre-gate check | Before COD gate | python3 tools/workspace.py trace gate-check --phase {phase} --sil {project_sil} |
| Update baselines | After COD gate PASS | Tag CSV files in git with phase baseline |
| Re-trace after CCB changes | After approved Change Request | Update affected CSV files (see TRACEABILITY.md Section 13.4); re-validate |
Mandatory Columns (from TRACEABILITY.md Section 13.1.3):
source_id,source_type,target_id,target_type,link_type,rationale,verified,verified_by,verified_date,source_document,target_document
Example Row:
COMP-001-SKN,component,REQ-SAFE-007,requirement,implements,SKN implements safety interlock requirement,true,VER,2026-03-28,doc9,doc6
Artifact Types: requirement, component, module, function, test_case, interface, hazard
Link Types: implements, traces_to, allocated_to, tests, verifies, refines, derives_from
Storage Location: evidence/traceability/ (in project baseline)
See TRACEABILITY.md Section 13.2 for detailed per-phase workflows. Quick reference:
| Phase | Expected Files | Key T-Rules | Validation Command |
|---|---|---|---|
| 2: Requirements | 3-4 CSV files | T1, T2, T9 | trace gate-check --phase requirements --sil {sil} |
| 3: Architecture & Design | 13-15 CSV files | T3, T4, T5a-c, T8, T9, T10a-b | trace gate-check --phase design --sil {sil} |
| 4: Component Design | 2 CSV files | T6, T11 | trace gate-check --phase component-design --sil {sil} |
| 5: Implementation & Testing | 3 CSV files | T7, T12 | trace gate-check --phase implementation-testing --sil {sil} |
| 6: Integration | 4 CSV files | T12 | trace gate-check --phase integration --sil {sil} |
| 7: Validation | 3 CSV files | T12, T13 | trace gate-check --phase validation --sil {sil} |
Document ID Mapping (from TRACEABILITY.md Section 13.1.2):
Mandatory Tools (from TRACEABILITY.md Section 13.3):
# Validate all CSV files
python3 tools/workspace.py trace validate --sil 3
# Gate check for specific phase
python3 tools/workspace.py trace gate-check --phase design --sil 3
Optional Tools (use with caution):
trace extract — ⚠ OPTIONAL/EXPERIMENTAL (may produce incorrect semantic mappings)trace sync — Synchronize CSV ↔ JSON ↔ Markdown formatstrace query — Query traceability linkstrace visualize — Generate diagramsRecommendation: Always use manual CSV creation; use mandatory validation tools only.
See TRACEABILITY.md Section 13.5 for complete TDC Phase 3 example (19 CSV files, 593 relationships, 100% coverage).
Reference: examples/TDC/evidence/traceability/ contains the complete CSV file set demonstrating manual workflow for SIL 3 project.
See DELIVERABLES.md for SCMR template and requirements (EN 50128:2011 Annex C, Document 27).