Complete lifecycle workflow examples for COD — SIL 3 full project, SIL 0-1 prototyping, SIL 2 iterative development
Codex 또는 Claude로 설치 이 Prompt를 복사해 Codex, Claude 또는 다른 어시스턴트에 붙여 넣으면 Skill 페이지를 검토하고 설치를 진행할 수 있습니다.
메뉴
Complete lifecycle workflow examples for COD — SIL 3 full project, SIL 0-1 prototyping, SIL 2 iterative development
Codex 또는 Claude로 설치 이 Prompt를 복사해 Codex, Claude 또는 다른 어시스턴트에 붙여 넣으면 Skill 페이지를 검토하고 설치를 진행할 수 있습니다.
SOC 직업 분류 기준
Project management and coordination for EN 50128 railway software development
Project management and coordination for EN 50128 railway software development
Software quality assurance techniques and auditing for EN 50128 railway software
Software testing methodologies with coverage analysis for EN 50128 C programs using Unity test framework
Software verification with static analysis and coverage for EN 50128 railway software per Section 6.2
V&V Manager coordination and independent V&V authority for SIL 3-4 EN 50128 projects
| name | en50128-lifecycle-examples |
| description | Complete lifecycle workflow examples for COD — SIL 3 full project, SIL 0-1 prototyping, SIL 2 iterative development |
| license | Proprietary |
| compatibility | opencode |
| metadata | {"standard":"EN 50128:2011","domain":"railway-software","role":"lifecycle-coordinator"} |
Load trigger: Load this skill when a user asks for a workflow example, or when COD needs to illustrate the command sequence for a complete lifecycle or a specific SIL level.
# Phase 0: Initialization
@cod plan --sil 3 --project train_door_control
# Creates LIFECYCLE_STATE.md; sets Strict Gatekeeper mode
# Generate system-level documents (select from TYPICAL-SYSTEMS.md catalogue)
@cod generate-system
# Generates: System-Requirements-Specification.md, System-Architecture-Description.md,
# System-Safety-Requirements-Specification.md, System-Safety-Plan.md
# → docs/system/
# Phase 1: Planning
@pm execute-phase 1
# PM: SQAP, SCMP
# COD coordinates independently: VMGR → VER (SVP); VMGR (SVaP) [independence requirement]
@cod gate-check planning
# Phase 2: Requirements [USER APPROVAL required before REQ activities]
@pm execute-phase 2
# PM → REQ (SRS from system docs), SAF (hazard analysis), TST (Overall SW Test Spec)
# Track B: COD → VMGR → VER → QUA → VMGR → VAL → QUA → VMGR → COD
@cod gate-check requirements
# Phase 3: Architecture & Design
@pm execute-phase 3
# PM → DES (SAS, SDS, interface specs), SAF (FMEA/FTA update)
# Track B: full approval chain
@cod gate-check design
# Phase 4: Component Design
@pm execute-phase 4
# PM → DES (Component Design Specs, Component Test Specs)
# Track B: VER + VMGR approval
@cod gate-check component-design
# Phase 5: Implementation & Unit Testing
@pm execute-phase 5
# PM → IMP (C code, MISRA C:2012, complexity ≤10), TST (unit tests, 100% branch + condition)
# QUA code review (mandatory); VER static analysis; VMGR approval
@cod gate-check implementation-testing
# Phase 6: Integration
@pm execute-phase 6
# PM → INT (integration), TST (integration tests, performance)
# Track B: full approval chain
@cod gate-check integration
# Phase 7: Validation [COD coordinates VAL directly — PM has no role]
@pm execute-phase 7
# COD → VAL (system testing, acceptance) → QUA → VMGR
# VMGR approval required; VMGR decision cannot be overridden
@cod gate-check validation
# Phase 8: Assessment (mandatory SIL 1–4, §6.4.1.1; SIL 0 exempt §6.4.1.2)
# External ISA/ASR reviews all lifecycle artifacts — no platform agent for this role
# COD monitors for ASR completion signal (manual entry in LIFECYCLE_STATE.md)
@cod gate-check assessment
# Phase 9: Deployment
@pm execute-phase 9
# PM → CM (final baseline, release package, deployment records)
@cod gate-check deployment
# Status at any time
@cod status
@cod plan --sil 0 --project prototype # Optional for SIL 0-1 (Advisory mode)
@pm execute-phase 2 # Requirements (no mandatory user approval gate)
@pm execute-phase 3 # Basic design
@pm execute-phase 5 # Implement and test (statement + branch coverage HR)
@pm execute-phase 6 # Integration
@pm execute-phase 7 # Validation
@cod gate-check validation # COD provides warnings; does not block transitions
@cod plan --sil 2 --project iterative_system
@cod generate-system
@pm execute-phase 1 # Planning: SQAP, SCMP, SVP, SVaP
@cod gate-check planning
# First iteration
@pm execute-phase 2 # Requirements (user approval required at SIL 2)
@cod gate-check requirements # Semi-strict: justification required if incomplete
@pm execute-phase 3 # Architecture & Design
@cod gate-check design
@pm execute-phase 4 # Component Design
@cod gate-check component-design
@pm execute-phase 5 # Implement (MISRA C:2012); unit test (branch coverage M)
@cod gate-check implementation-testing
@pm execute-phase 6 # Integration
@cod gate-check integration
@pm execute-phase 7 # Validation
@cod gate-check validation
@pm execute-phase 9 # Deployment: baseline, release package
@cod gate-check deployment
@cod status # Overall lifecycle progress and compliance summary