Incident Review
Conduct a blameless post-incident review. The purpose is learning, not blame. Systems fail; the question is what we change so they fail less or recover faster.
Timeline reconstruction
Build a detailed, timestamped sequence of events. This is the foundation — get it right before analyzing anything.
- Detection: When did the problem start? When was it detected? How was it detected — alert, customer report, engineer noticed?
- Response: Who responded? When? What was the first action taken?
- Diagnosis: What was investigated? What hypotheses were tested? Which were wrong and why?
- Mitigation: What action stopped or reduced the impact? When?
- Recovery: When was the system fully restored? How was "fully restored" verified?
Use UTC timestamps. Note the gap between each phase — long gaps reveal process problems.
Format the timeline as:
HH:MM UTC — [Event description] (Source: alert/person/log)
Call out any point where information was missing, misleading, or delayed. These are as important as the events themselves.
Impact assessment
Quantify the impact. Vague impact statements lead to vague prioritization of fixes.
- Duration: total time from start of impact to full recovery.
- Customer impact: how many customers affected, what they experienced, whether they noticed.
- Data implications: any data loss, corruption, or exposure? If yes, scope it precisely.
- SLA/SLO impact: did this breach any commitments? Which error budgets were consumed?
- Financial impact: if quantifiable or estimable.
- Downstream effects: did this cause incidents or degradation in other systems?
Root cause analysis
Use the "5 Whys" approach. Keep asking why until you reach a systemic cause, not a human action.
Distinguish between:
- Trigger: the immediate event that started the incident (a deploy, a config change, a traffic spike).
- Root cause: the underlying condition that made the trigger dangerous (missing validation, no circuit breaker, untested failover).
- Contributing factors: everything that made the incident worse or longer (see next section).
Bad root cause: "Engineer deployed a bad config."
Good root cause: "Config validation did not check for invalid values in the rate-limit field, allowing a zero value that caused all requests to be rejected. The deploy pipeline had no canary stage to catch this before full rollout."
The root cause should point to a system or process to fix, never to a person to blame.
Contributing factors
What conditions made this incident possible, worse, or longer to resolve beyond the direct root cause?
Consider each category:
- Monitoring gaps: Was the right thing being measured? Did alerts fire promptly? Were they actionable?
- Runbook quality: Did the runbook exist? Was it accurate? Did it cover this scenario?
- Deployment process: Was there a canary? Was rollback easy? Was the change reviewed?
- Communication: Did the right people know? Was the escalation path clear? Was the status page updated?
- Knowledge distribution: Could only one person diagnose this? Was tribal knowledge involved?
- System complexity: Did the interaction between components make diagnosis harder?
- Time pressure: Was this change rushed? Was it deployed during a high-risk window?
What went well
Explicitly capture what worked during the incident response. This is not optional — it is how you protect and reinforce good practices.
- What was detected or responded to quickly?
- What runbooks or automation helped?
- What communication or coordination worked well?
- What prior investment in resilience limited the blast radius?
Be specific. "Good teamwork" is not useful. "On-call engineer used the database runbook to identify the lock contention within 8 minutes of the alert" is.
Action items
Every action item must be:
- Concrete: specific enough that someone can start working on it immediately.
- Assigned: an owner, not a team. A team is where action items go to die.
- Time-bound: a target date, even if it is approximate.
- Prioritized: P1 (prevents recurrence), P2 (improves detection/response), P3 (general improvement).
Format:
| # | Action item | Priority | Owner | Target date |
|---|
| 1 | Add config validation for rate-limit field (reject zero/negative values) | P1 | @name | YYYY-MM-DD |
| 2 | Add canary stage to deploy pipeline for config changes | P1 | @name | YYYY-MM-DD |
| 3 | Update runbook with rate-limit incident scenario | P2 | @name | YYYY-MM-DD |
Avoid vague items:
- Bad: "Improve monitoring"
- Good: "Add alert for request rejection rate exceeding 5% over 2 minutes on the API gateway, routing to #incidents Slack channel"
Output format
The final document should follow this structure, suitable for sharing with stakeholders:
- Summary — 2-3 sentences: what happened, how long, what was the impact.
- Timeline — timestamped events.
- Impact — quantified.
- Root cause and contributing factors — analysis.
- What went well — reinforcement.
- Action items — table with owners and dates.
Write in third person, past tense, blameless framing. Replace personal names in the narrative with roles ("the on-call engineer") unless the person specifically wants to be named. Keep names only in the action item owner column.