| name | tgd-verification-before-completion |
| description | Enforces evidence-based verification before claiming any work is complete. Use when about to claim work is complete, fixed, or passing — requires running verification commands and confirming output before making any success claims. Evidence before assertions, always. |
Verification Before Completion
Overview
Claiming work is complete without verification is dishonesty, not efficiency.
Core principle: Evidence before claims, always.
Violating the letter of this rule is violating the spirit of this rule.
The Iron Law
NO COMPLETION CLAIMS WITHOUT FRESH VERIFICATION EVIDENCE
If you haven't run the verification command in this message, you cannot claim it passes.
The Gate Function
BEFORE claiming any status or expressing satisfaction:
1. IDENTIFY: What command proves this claim?
2. RUN: Execute the FULL command (fresh, complete)
3. READ: Full output, check exit code, count failures
4. VERIFY: Does output confirm the claim?
- If NO: State actual status with evidence
- If YES: State claim WITH evidence
5. ONLY THEN: Make the claim
Skip any step = lying, not verifying
Common Failures
| Claim | Requires | Not Sufficient |
|---|
| Tests pass | Test command output: 0 failures | Previous run, "should pass" |
| Linter clean | Linter output: 0 errors | Partial check, extrapolation |
| Build succeeds | Build command: exit 0 | Linter passing, logs look good |
| Bug fixed | Test original symptom: passes | Code changed, assumed fixed |
| Regression test works | Red-green cycle verified |