Skip to main content
Manus에서 모든 스킬 실행
원클릭으로
telus-labs
GitHub 제작자 프로필

telus-labs

1개 GitHub 저장소에서 수집된 20개 skills를 저장소 단위로 보여줍니다.

수집된 skills
20
저장소
1
업데이트
2026-07-05
저장소 지도

skills가 있는 위치

수집된 skill 수가 많은 주요 저장소와 이 제작자 카탈로그 내 비중, 직업 분포를 보여줍니다.

저장소 탐색

저장소와 대표 skills

platform-deploy
소프트웨어 개발자

Platform Developer: Stage 8 deploy task. Adapter-driven deployment — read config.yml for the adapter, follow adapter instructions, write deploy-log.md and stage-08.json.

2026-07-05
platform-build
네트워크·컴퓨터 시스템 관리자

Platform Developer: Stage 4 build task. Docker Compose setup, infra config, PR summary authoring, and Stage 4 gate writing for the platform workstream.

2026-07-01
verification-beyond-tests
소프트웨어 품질 보증 분석가·테스터

G7 — apply property-based testing, mutation testing, and formal verification as a stage-06d sub-stage. "Tests pass" becomes the floor; this skill raises the ceiling. Use after stage-06 PASS, when the diff contains pure functions / critical business logic / state machines worth verifying beyond examples.

2026-06-26
audit
소프트웨어 개발자

Run a structured codebase audit — map architecture, assess health (compliance / tests / docs), perform deep analysis (security / performance / code quality), and synthesize a prioritized roadmap. Use this skill when the user says things like 'audit the codebase', 'understand this project', 'find problems', '/audit', or '/audit-quick'. Phases produce machine-friendly markdown outputs under docs/audit/ that downstream commands (like the implement skill) consume to know where to start work.

2026-06-17
qa-test-authoring
소프트웨어 품질 보증 분석가·테스터

QA Developer: Stage 6 test-authoring phase. Map every acceptance criterion to at least one test, write the test suite, and produce pipeline/pr-qa.md. Does NOT run the suite — that is the test-execution phase (skills/qa-test-execution/SKILL.md).

2026-06-14
observability-verification
소프트웨어 개발자

Verify at Stage 6c that every metric, log, and trace promised in the design-spec is actually emitted by the shipped code. Runs on full and hotfix tracks only. Produces the stage-06c gate. Use when the platform role owns observability sign-off after build and QA.

2026-06-14
platform-pre-review
소프트웨어 개발자

Platform Developer: Stage 4a pre-review task. Run lint, type-check, SCA, license check, security trigger, and hygiene checks. Produce pipeline/gates/stage-04a.json.

2026-06-14
qa-augmentation
소프트웨어 품질 보증 분석가·테스터

QA Developer: Stage 4c-qa post-red-team test augmentation. Write regression tests for every addressed red-team finding before Stage 5 begins. Only fires after red-team WARN/PASS following fix cycles.

2026-06-14
이 저장소에서 수집된 skills 20개 중 상위 8개를 표시합니다.
저장소 1개 중 1개 표시
모든 저장소를 표시했습니다