Incremental Delivery
Ship work as a series of small, working steps. Each increment compiles, runs, passes its tests,
and could in principle be merged. Big-bang changes hide bugs until the end — when ten moving parts
fail together and [[fault-recovery]] becomes a archaeology project.
Incremental delivery is how you keep reviewable diffs, known-good checkpoints, and fast
feedback on risky ideas. It's not "move slower" — it's fail fast on small surfaces instead of slow
at the finish line.
Default build skill: pair with [[test-first]] to prove each slice, [[work-planning]] to order slices,
[[git-flow]] to commit at green, [[browser-checks]] for UI slices, and [[migration-path]] when each
slice must stay backward-compatible.
When to Use
- Any implementation beyond a trivial one-line edit
- A feature that would otherwise be a large, hard-to-review PR
- Risky or unfamiliar territory — new API, new datastore, new UI pattern
- Long-running work spanning days or multiple sessions
- Others need to integrate with your branch mid-flight
- AI-generated code that tends toward huge unverified diffs
Skip heavy slicing for truly trivial, isolated fixes (typo, single constant) — still run checks before
push.
Process
1. Plan slices before coding — vertical beats horizontal
Start from [[spec-first]] or [[work-planning]]. List increments — each independently demonstrable.
Vertical slice (prefer): thin path through all layers that does one real thing end-to-end.
Slice 1: POST /orders with one hardcoded SKU → persists row → returns id (no payment)
Slice 2: Validate cart payload + real SKUs from DB
Slice 3: Payment redirect on success
Horizontal slice (avoid as first increments): whole layer with no user-visible outcome.
Bad first slices: "all models", "all API routes", "all CSS" — nothing works until the end
Walking skeleton / steel thread: smallest end-to-end path — even ugly — then harden and expand.
| Feature type | First slice example |
|---|
| API | One endpoint, happy path, real persistence |
| UI page | One section, real data, one state |
| Background job | Process one message type, log success |
| Migration | Expand schema nullable; deploy before backfill ([[migration-path]]) |
| Refactor | One module moved; all tests green; behavior unchanged |
Each slice should answer: "What can I demo or test after this?" If nothing — slice smaller.
2. Size increments for review and rollback
Target increments that:
- Fit in one focused session (hours, not days)
- Produce a diff reviewers can understand in one pass ([[review-gate]])
- Leave a revertible checkpoint if deploy goes wrong ([[launch-readiness]])
| Too big | Right size |
|---|
| Entire checkout flow | Guest can submit email on checkout step 1 |
| All admin CRUD | List view with pagination |
| "Implement auth" | Login form posts; session cookie set; protected route redirects |
If a slice feels large, split: data path then polish; read path then write path; happy
path then error states ([[ui-craft]]).
3. The increment loop
For each slice, repeat until the spec is satisfied:
1. Define slice outcome — one sentence + how you'll verify
2. Implement minimum to reach outcome (pair with [[test-first]] when logic-heavy)
3. Verify immediately — tests, run app, browser if UI ([[browser-checks]])
4. Commit at green ([[git-flow]]) — one logical change
5. Integrate often — rebase/merge main; don't drift for days
6. Next slice
Verify before the next slice starts. A failure you ignore compounds — you won't know which slice
introduced it.
Stop rule: If you've written a lot without running anything — stop, run tests, get back to
green, commit or stash. Never stack unverified work.
4. Verify each increment — prove it works
Verification matches the slice — not always full suite theater:
| Slice type | Verify with |
|---|
| Logic / service | Unit/integration test ([[test-first]]) |
| API | Contract test + curl/httpie; check response body |
| UI component | Story or render test + [[browser-checks]] on wired page |
| Migration | Migration up on staging DB; row counts; app still boots |
| Config/deploy | CI green; smoke in staging ([[pipeline-ops]]) |
Demo the slice when possible — 30-second screen share beats "tests pass" for alignment.
For UI, don't wait until the whole page is pretty — prove the wiring early (data shows up, button
does something).
5. Commit at green — checkpoints are currency
Each green increment is:
- A safe rollback target ([[git-flow]], [[incident-response]])
- A bisect point for [[fault-recovery]]
- A review unit if you open PR early
One logical change per commit — not refactor + feature + lint fix in one blob.
WIP on private branch is fine; before PR, history should tell a story or squash per team convention.
Push slices regularly — laptop loss and silent drift are real risks.
6. Separate behavior from refactor
Mixed diffs are unreviewable and unbisectable:
Commit A: extract OrderService (tests green, no behavior change)
Commit B: add tax calculation (tests new behavior)
Never "while I'm here" refactor across the feature unless refactor is its own slice first
([[simplify]] can guide cleanup passes).
7. Stubs, flags, and dark shipping
Use temporary bridges to keep slices vertical without building everything:
- Stub downstream dependency — real HTTP shape, fake data — replace in slice 2
- Feature flag — ship slice to prod dark; enable for internal users ([[launch-readiness]])
- Interface behind implementation — real caller, fake provider until integration slice
Mark stubs clearly — ticket or comment linking to the slice that removes them. Permanent stubs become
debt.
Expand-contract migrations: each expand/contract step is its own shippable increment
([[migration-path]]).
8. Integrate continuously
Long-lived branches are incremental delivery failure:
- Merge or rebase
main daily (or more) — conflicts grow with time
- Open draft PR early — CI runs; reviewers see direction
- Split oversized work into stacked or sequential PRs — don't land 3k lines Friday
If integration hurts, slices may be too wide or branch lived too long — fix process, not blame git.
9. When a slice goes wrong
- Don't pile on — stop next slice work
- Identify last green —
git log, CI history
- Revert or fix one slice — [[fault-recovery]] with narrow surface
- Re-verify green before continuing
Two broken slices ahead = go back to last green, not forward faster.
10. Scenario playbooks
New API feature
Slice: schema/migration expand → model + one endpoint happy path → validation/errors → authz →
remaining endpoints → contract cleanup.
New UI page ([[design-handoff]])
Slice: route + skeleton layout → one section with real data → remaining sections → states (loading/
empty/error) → responsive/a11y polish → browser-check proof.
Replace legacy module
Slice: adapter calls legacy → move one caller → move next caller → delete legacy when zero callers
([[migration-path]]).
Performance fix ([[perf-budget]])
Measure → one bottleneck fix → measure again → commit. Don't bundle five optimizations.
Bug fix
Repro test ([[test-first]]) → minimal fix green → commit. Not bundled with nearby feature.
Spike / prototype
Time-box; throwaway or harden — if spike code ships, first slice after spike is "make it real"
with tests, not more spike on spike.
AI-generated implementation
Treat output as untrusted: slice by slice, run tests each slice, reject 500-line dumps — regenerate
in smaller chunks.
Common Rationalizations
- "I'll test it once it's all wired up." — Failure could be in any of ten places; you'll find it late.
- "Smaller commits are noisy." — Small green commits are the cheapest debugging and review tool.
- "Refactoring and the feature are the same change." — Mixing makes both impossible to review.
- "It's faster to build it all then fix it." — Integration debugging at the end kills schedules.
- "Vertical slices are harder upfront." — They're easier every day after; horizontal pays pain at the end.
- "We can't ship half a feature." — Dark flags and internal dogfood are shipping; half-built layers aren't.
- "Main moves too fast to merge often." — That's why you merge often; long drift is the problem.
- "Draft PR is embarrassing." — Early PR catches wrong direction cheaply.
Red Flags
- Hundreds of lines written with nothing run yet
- Branch not in a working state for more than a day
- Single commit mixes refactor, feature, and drive-by fix
- "It'll all come together at the end"
- Can't name the last known-good commit
- Horizontal layers built with no end-to-end test path
- Stubs without tickets to replace them
- PR over team size limit with no split plan
- Tests added only in the final slice
- UI built entirely in static mock before any real data wiring
- Increment loop skipped — jumped from plan to "implement feature" task
Verification