Writing Implementation Plans
Overview
Write comprehensive implementation plans assuming the engineer has zero context for our codebase and questionable taste. Document everything they need to know: which files to touch for each task, code, testing, docs they might need to check, how to verify it. Give them the whole plan as bite-sized tasks. DRY. YAGNI. Frequent commits.
Assume they are a skilled developer, but know almost nothing about our toolset or problem domain. Assume they don't know good test design very well.
Announce at start: "I'm using the techne:writing-implementation-plans skill to create the implementation plan."
Save plans to:.techne/tasks/YYYY-MM-DD-<feature-name>/phase_##.md
Critical: Design Plans Provide Direction, Not Code
Design plans are intentionally high-level. They describe components, modules, and contracts — not implementation code. This is by design.
You MUST generate code fresh based on codebase investigation. Do NOT copy code from the design document. Even if a design plan contains code examples (it shouldn't, but some might), treat them as illustrative only.
Why this matters:
Design plans may be days or weeks old
Codebase state changes between design and implementation
Investigation reveals actual patterns, dependencies, and constraints
Your code must work with the codebase as it exists NOW
The design plan tells you WHERE you're going. Codebase investigation tells you HOW to get there from where you are.
Before Starting
REQUIRED: Verify scope and codebase state
1. Scope Validation
Count the phases/tasks in the design plan.
If design plan has >8 phases: STOP. Refuse to proceed.
Tell the user:
"This design has [N] phases, which exceeds the 8-phase limit for implementation plans. Please rerun this skill with a scope of no more than 8 phases. You can:
Select the first 8 phases for this implementation plan
Break the design into multiple implementation plans
Simplify the design to fit within 8 phases"
If already implementing phases 9+: The user should provide the previous implementation plan as context when scoping the next batch.
2. Review Mode Selection
After scope validation, ask how to handle phase reviews:
Use AskUserQuestion:
Question: "How would you like to review the implementation plan phases?"
Options:
- "Write all phases to disk, I'll review afterwards"
- "Review each phase interactively before writing"
Track this choice - it affects the per-phase workflow below.
3. Codebase Verification
You MUST verify current codebase state before EACH AND EVERY PHASE. Use morphe:codebase-investigator to prove out your hypotheses and to ensure that current state aligns with what you want to write out.
YOU MUST verify current codebase state before writing ANY task.
DO NOT verify codebase yourself. Use morphe:codebase-investigator agent.
Provide the agent with design assumptions so it can report discrepancies:
Dispatch one subagent morphe:codebase-investigator to understand testing behavior for this project.
DO NOT prescribe new requirements around testing. Follow how the codebase does it.
For example: do NOT stipulate TDD unless you understand the scope of the problem to be a predominantly functional one OR you receive direction from a human otherwise and do not assume that mocking databases or other external dependencies is acceptable.
If you find problems that are difficult to test in isolation with mocks, you should surface questions to the human operator as to how they want to proceed.
Instruct the subagent to seek out CLAUDE.md or AGENTS.md files that include details on testing behavior, logic, and methodology, and include file references for you to provide in your plan for the executor to pass to its subagents.
Dispatch a second subagent morphe:codebase-investigator (simultaneously) with:
"The design assumes these files exist: [list with expected paths/structure from design]"
"Verify each file exists and report any differences from these assumptions"
"The design says [feature] is implemented in [location]. Verify this is accurate"
"Design expects [dependency] version [X]. Check actual version installed"
Example query to agent:
Design assumptions from docs/plans/YYYY-MM-DD-feature-design.md:
- Auth service in src/services/auth.ts with login() and logout() functions
- User model in src/models/user.ts with email and password fields
- Test file at tests/services/auth.test.ts
- Uses bcrypt dependency for password hashing
Verify these assumptions and report:
1. What exists vs what design expects
2. Any structural differences (different paths, functions, exports)
3. Any missing or additional components
4. Current dependency versions
Review investigator findings and note any differences from design assumptions.
"Modify src/index.ts:45-67" (investigator confirmed exists, checked line numbers)
"No changes needed to config.py" (investigator confirmed already correct)
If codebase state differs from design assumptions: Document the difference and adjust the implementation plan accordingly.
4. External Dependency Research
When phases involve external libraries or dependencies, research them before writing tasks.
Use a tiered approach—start with documentation, escalate to source code only when needed.
Tier 1: Internet Researcher (default)
Use morphe:internet-researcher for:
Official documentation and API references
Common usage patterns and examples
Standard specifications (OAuth2, JWT, HTTP, etc.)
Best practices and known gotchas
This handles ~80% of external dependency questions. Most integration work follows documented patterns.
Tier 2: Remote Code Researcher (escalation)
Use morphe:remote-code-researcher when:
Documentation doesn't cover your edge case
You need to understand internal implementation for extension/customization
Docs describe what but you need to know how
Behavior differs from docs and you need ground truth
You're extending or hooking into library internals
Decision Framework
Phase involves external dependency?
├─ No → morphe:codebase-investigator only
└─ Yes → What do we need to know?
├─ API usage, standard patterns → morphe:internet-researcher
├─ Standard/spec implementation → morphe:internet-researcher
├─ Implementation internals, extension points → morphe:remote-code-researcher
└─ Both local state + external info → morphe:combined-researcher
When to Dispatch
Dispatch morphe:internet-researcher when phase mentions:
External packages/libraries to integrate
Third-party APIs to call
Standards to implement (OAuth, JWT, OpenAPI, etc.)
Standards vs Implementation: Standards questions (e.g., "how does OAuth2 work") are morphe:internet-researcher territory. Implementation questions (e.g., "how does auth0-js store tokens") may require morphe:remote-code-researcher.
Bite-Sized Task Granularity
Each step is one action (2-5 minutes).
For functionality tasks:
"Write the failing test" - step
"Run it to make sure it fails" - step
"Implement the minimal code to make the test pass" - step
"Run the tests and make sure they pass" - step
"Commit" - step
For infrastructure tasks:
"Create the config file" - step
"Verify it works (install, build, run)" - step
"Commit" - step
Task dependencies MUST be explicit and sequential:
Task N requires helper function? Task N-1 creates it.
Task N requires bootstrap credentials? Prior task provisions them.
Never write code that assumes "this will exist somehow."
Task Types: Infrastructure vs Functionality
Match task structure to what the design phase specifies.
The design plan distinguishes between infrastructure phases (verified operationally) and functionality phases (verified by tests). Your implementation tasks must honor this distinction.
Verifies: None — explicitly state this, don't invent ACs for setup phases
Functionality tasks (code that does something):
Tests are deliverables alongside code
Each task lists which ACs it verifies (e.g., "Verifies: AC1.1, AC1.3")
Tests must verify those specific AC cases, not just "test the code"
Phase ends with passing tests for all ACs listed in the phase's AC Coverage
Test behavior, not implementation.
Test that your function produces the right output, not that it called dependencies a certain way
If you refactored internals but behavior stayed the same, would the test still pass? If no, you're testing implementation details.
The AC is the spec: "Invalid password returns 401" means test the response, not verify that bcrypt.compare() was called
What doesn't need tests:
Types (TypeScript compiler verifies these)
Dependencies that have their own tests (don't re-test them through your code)
How you call things (test the result, not the wiring)
Infrastructure/setup (verify operationally)
Subcomponent task grouping. Design plans structure phases as subcomponents: types → implementation → tests. When writing tasks for a subcomponent, wrap them in subcomponent markers (see "Task and Subcomponent Markers" section):
The execution agent uses these markers to identify related tasks. The tests task proves the subcomponent works.
Read the design plan's "Done when" section. If it says "build succeeds," don't invent unit tests. If it says "tests pass for X," ensure tasks produce those tests.
Plan Document Header
Every plan phase document MUST start with this header:
# [Feature Name] Implementation Plan**Goal:** [One sentence describing what this builds]
**Architecture:** [2-3 sentences about approach]
**Tech Stack:** [Key technologies/libraries]
**Scope:** [N] phases from original design (phases [X-Y] if partial implementation)
**Codebase verified:** [Date/time of verification]
---
## Acceptance Criteria Coverage
This phase implements and tests:
### {slug}.AC1: [Criterion heading from design plan]-**{slug}.AC1.1 Success:** [Copied literally from design plan]
-**{slug}.AC1.3 Failure:** [Copied literally from design plan]
### {slug}.AC2: [Criterion heading from design plan]-**{slug}.AC2.1 Success:** [Copied literally from design plan]
---
AC Coverage rules:
Copy AC text literally from the design plan—do not paraphrase
Use the full scoped AC identifier (e.g., oauth2-svc-authn.AC1.1), not bare AC1.1
Include ONLY the ACs this phase implements and tests
Include both the criterion heading ({slug}.AC1) and the specific cases ({slug}.AC1.1, {slug}.AC1.3)
Tasks in this phase must produce tests that verify these specific cases
An AC case may appear in multiple phases if partially addressed, but final phase must complete it
Task and Subcomponent Markers
Wrap every task and subcomponent in HTML comment markers to enable efficient parsing during execution.
The session ID (e.g., a7f3b2) ensures isolation between:
Parallel planning sessions with similar slugs
Retry attempts (if a plan fails and user starts over)
SCRATCHPAD_DIR ensures session isolation. Code reviewers and other subagents should write any temp files here, not to shared locations like /tmp/.
Read the Acceptance Criteria section from the design plan. Acceptance criteria are numbered (AC1, AC1.1, AC1.2, etc.) and define what "done" means. When writing each phase:
Identify which ACs this phase implements (look at design phase's "Done when" + component responsibilities)
Copy those AC entries literally into the phase's "Acceptance Criteria Coverage" header section
Ensure tasks produce tests that verify each listed AC case
For each phase N, create these tasks with dependencies:
- [ ] Phase NA: Read [Phase Name] from {DESIGN_PATH}
→ blocked by: Phase (N-1)D (or nothing if N=1)
- [ ] Phase NB: Investigate codebase for Phase N and activate relevant skills
→ blocked by: Phase NA
- [ ] Phase NC: Research external deps (Phase N)
→ blocked by: Phase NB
- [ ] Phase ND: Write {PLAN_DIR}/phase_0N.md
→ blocked by: Phase NC
VERBATIM TASK NAMES — DO NOT PARAPHRASE. Copy task names exactly as shown above. "Investigate codebase for Phase N and activate relevant skills" must include "and activate relevant skills" — that phrase triggers skill activation after compaction. Paraphrasing loses critical instructions.
After all phase tasks, create finalization task:
Before creating the Finalization task, check if .techne/implementation-plan-guidance.md exists. If it does, include its absolute path in the task description:
# If .techne/implementation-plan-guidance.md exists:- [ ] Finalization: Run morphe:code-reviewer over all phase files (guidance: [absolute path to .techne/implementation-plan-guidance.md]), fix ALL issues including minor ones
→ blocked by: all Phase *D tasks
# If .techne/implementation-plan-guidance.md does NOT exist:- [ ] Finalization: Run morphe:code-reviewer over all phase files, fix ALL issues including minor ones
→ blocked by: all Phase *D tasks
Example for a 3-phase design at /Users/ed/project/.techne/tasks/2025-01-24-oauth.md:
TaskCreate: "Phase 1A: Read Token Types from /Users/ed/project/.techne/tasks/2025-01-24-oauth.md"
TaskCreate: "Phase 1B: Investigate codebase for Phase 1 and activate relevant skills"
→ TaskUpdate: addBlockedBy: [1A]
TaskCreate: "Phase 1C: Research external deps (Phase 1)"
→ TaskUpdate: addBlockedBy: [1B]
TaskCreate: "Phase 1D: Write /Users/ed/project/.techne/tasks/2025-01-24-oauth/phase_01.md"
→ TaskUpdate: addBlockedBy: [1C]
TaskCreate: "Phase 2A: Read Token Service from /Users/ed/project/.techne/tasks/2025-01-24-oauth.md"
→ TaskUpdate: addBlockedBy: [1D]
TaskCreate: "Phase 2B: Investigate codebase for Phase 2 and activate relevant skills"
→ TaskUpdate: addBlockedBy: [2A]
TaskCreate: "Phase 2C: Research external deps (Phase 2)"
→ TaskUpdate: addBlockedBy: [2B]
TaskCreate: "Phase 2D: Write /Users/ed/project/.techne/tasks/2025-01-24-oauth/phase_02.md"
→ TaskUpdate: addBlockedBy: [2C]
TaskCreate: "Phase 3A: Read Session Manager from /Users/ed/project/.techne/tasks/2025-01-24-oauth.md"
→ TaskUpdate: addBlockedBy: [2D]
TaskCreate: "Phase 3B: Investigate codebase for Phase 3 and activate relevant skills"
→ TaskUpdate: addBlockedBy: [3A]
TaskCreate: "Phase 3C: Research external deps (Phase 3)"
→ TaskUpdate: addBlockedBy: [3B]
TaskCreate: "Phase 3D: Write /Users/ed/project/.techne/tasks/2025-01-24-oauth/phase_03.md"
→ TaskUpdate: addBlockedBy: [3C]
TaskCreate: "Finalization: Run morphe:code-reviewer over all phase files, fix ALL issues including minor ones"
→ TaskUpdate: addBlockedBy: [1D, 2D, 3D]
TaskCreate: "Test Requirements: Generate test-requirements.md from Acceptance Criteria"
→ TaskUpdate: addBlockedBy: [Finalization]
Why absolute paths in task descriptions: After compaction, the task list is all that remains. Absolute paths ensure you know exactly which files to read/write without relying on context.
Why dependencies: Tasks show [blocked by #X, #Y] in the task list, making execution order explicit and preventing out-of-order work.
Use TaskUpdate to mark each sub-task as in_progress when starting, completed when done.
If user chose "Review each phase interactively before writing":
Workflow for EACH phase (using granular task tracking):
Task NA: Read design phase
Mark task NA as in_progress
Extract the <!-- START_PHASE_N --> section from design plan
Mark task NA as completed
Task NB: Verify codebase state
Mark task NB as in_progress
Dispatch morphe:codebase-investigator with design assumptions for this phase
Review investigator findings for discrepancies
Activate relevant skills based on findings (if not already active):
### Functionality Task Template
```markdown
<!-- START_TASK_N -->
### Task N: [Component Name]
**Verifies:** {slug}.AC1.1, {slug}.AC1.3 (list specific AC cases this task tests)
**Files:**
- Create: `exact/path/to/file.py`
- Modify: `exact/path/to/existing.py:123-145`
- Test: `tests/exact/path/to/test.py` (unit|integration|e2e)
**Implementation:**
[Describe what to implement - contracts, behavior, key logic. Include code for complex/non-obvious implementations.]
**Testing:**
Tests must verify each AC listed above:
- {slug}.AC1.1: [brief description of what test should verify]
- {slug}.AC1.3: [brief description of what test should verify]
Follow project testing patterns. Task-implementor generates actual test code at execution time.
**Verification:**
Run: `[test command]`
Expected: All tests pass
**Commit:** `feat: [description]`
<!-- END_TASK_N -->
Key principles for functionality tasks:
List ACs explicitly. Every functionality task specifies which AC cases it verifies in the "Verifies" field.
Describe tests, don't write test code. The AC text is the spec (e.g., "AC1.3: Invalid password returns 401"). Task-implementor generates test code at execution time with fresh codebase context.
Include implementation code when non-obvious. If implementation is complex or project-specific patterns apply, include the code. If it's straightforward given the AC description, describe it.
Specify test type and location. Unit, integration, or e2e? Which file? This ensures consistency across phases.
Why no test code in plans:
Test code needs actual function signatures from the implementation
Project testing patterns discovered at execution time
AC text like "Invalid password returns 401" is already a clear test spec
Task-implementor has fresher context than implementation planner
If you find yourself writing "this won't compile until Phase N+1":
STOP. You are describing something that belongs in the current phase. Every phase must be executable with all tests passing when the phase completes.
Common Rationalizations - STOP
These are violations of the skill requirements:
Excuse
Reality
"File probably exists, I'll say 'update if exists'"
Use morphe:codebase-investigator. Write definitive instruction.
"Design mentioned this file, must be there"
Codebase changes. Use investigator to verify current state.
"I can quickly verify files myself"
Use morphe:codebase-investigator. Saves context and prevents hallucination.
"Design plan has code, I'll use that"
No. Design provides direction. Generate code fresh from codebase investigation.
"Design plan is recent, code should still work"
Codebase may have changed. Investigation is the source of truth, not the design.
"User can figure out if file exists during execution"
Your job is exact instructions. No ambiguity.
"Testing Phase 3 will fail but that's OK because it'll be fixed in Phase 4"
All phases must compile and pass tests before they conclude.
"Phase validation slows me down"
Going off track wastes far more time. Validate each phase.
"I'll batch all phases then validate at end"
Valid if user chose batch mode. Otherwise validate incrementally.
"I'll just ask for approval, user can see the plan"
Output complete plan in message BEFORE AskUserQuestion. User must see it.
"Plan looks complete enough to ask"
Show ALL tasks with ALL steps and code. Then ask.
"This plan has 12 phases but they're small"
Limit is 8 phases. No exceptions. Refuse and redirect.
"I can combine phases to fit in 8"
That's the user's decision, not yours. Refuse and explain options.
"Comment explains what needs to be done next"
Code comments aren't instructions. Code must run as-written. Create prior task for dependencies.
"Engineer will figure out the bootstrap approach"
No implementation questions in code. Resolve it now or create prerequisite task.
"Infrastructure tasks need TDD structure too"
No. Use infrastructure template. Verify operationally per design plan.
"I'll add tests to this config file task"
If design says "Done when: builds," don't invent tests. Honor the design.
"Functionality phase but design forgot tests"
Surface to user. Functionality needs tests. Design gap, not your call to skip.
"Plan looks complete, skip validation"
Always validate. Gaps found now are cheaper than gaps found during execution.
"Validation is overkill for simple plans"
Simple plans validate quickly. Complex plans need it more. Always validate.
"Finalization task is done, minor issues can wait"
NO. Task says "fix ALL issues including minor ones." Not done until zero issues.
"I'll skip creating granular tasks, one per phase is enough"
Research it. APIs change. Use morphe:internet-researcher for docs, morphe:remote-code-researcher for internals.
"Docs are probably accurate enough"
Usually yes. But if extending/customizing library behavior, verify with source code.
"I'll clone the repo to check the docs"
No. Use morphe:internet-researcher for docs. Only clone (morphe:remote-code-researcher) for source code investigation.
"Phase has external deps but I'll skip research"
Research is mandatory when phase involves external dependencies. Surface unknowns now.
"Test requirements can be generated during execution"
No. Test requirements must exist before execution starts. Code reviewer uses them.
"This type needs unit tests"
No. TypeScript compiler verifies types. Don't test what the compiler checks.
"Should test that this calls the dependency correctly"
No. Test behavior (the result), not wiring (how you called things).
"Dependency is used here, should verify it works"
No. Dependencies have their own tests. Test YOUR code's behavior.
"More tests = better coverage"
Wrong tests = noise. Test the ACs, nothing more.
"Phase doesn't have ACs but I'll add some tests anyway"
No. Explicitly state "Verifies: None" for infrastructure phases. Don't invent work.
"Acceptance Criteria are clear, don't need test requirements"
Test requirements map criteria to specific tests. Execution needs this mapping.
"I'll skip test requirements, user chose batch mode"
Batch mode skips interactive approval. Test requirements are still generated and written.
"Test requirements task is optional"
No. It's a tracked task with dependencies. Must complete before execution handoff.
All of these mean: STOP. Follow the requirements exactly.
When You Don't Know How to Proceed
If you cannot write executable code without unresolved questions: STOP immediately.
Do NOT write hand-waving comments. Do NOT leave TODOs. Do NOT proceed.
Instead, use AskUserQuestion with:
Exact description of the blocking issue:
What specific implementation decision you cannot make
What information is missing from the design
What dependencies are undefined
Context about why this blocks you:
Which task/phase this affects
What you've already verified via morphe:codebase-investigator
What the design document says (or doesn't say)
Possible solutions you can see:
Option A: [specific approach with tradeoffs]
Option B: [alternative approach with tradeoffs]
Option C: [if applicable]
Example:
I'm blocked on Phase 2, Task 3 (Bootstrap Logto M2M application).
Issue: The code needs Management API credentials to create resources, but those credentials don't exist yet (chicken-egg problem).
Design document says: "Bootstrap Logto with applications and roles" but doesn't specify how to get initial credentials.
Codebase verification: No existing bootstrap credentials or manual setup documented.
Possible solutions:
A. Add Phase 0: Manual setup - document steps for user to manually create initial M2M app via Logto UI, save credentials to .env
B. Use Logto admin API if available - requires admin credentials in different format
C. Modify Logto docker-compose to inject initial M2M app via environment variables
Which approach should I take?
Never proceed with uncertain implementation. Surface the decision to the user.
Requirements Checklist
Before starting:
Count phases - refuse if >8
Ask user for review mode (batch vs interactive)
Capture absolute paths: DESIGN_PATH and PLAN_DIR
Read Acceptance Criteria section from design plan
Create granular task list with TaskCreate (NA, NB, NC, ND per phase + Finalization + Test Requirements)
Set up dependencies with TaskUpdate addBlockedBy (see Step 0)
Task descriptions include absolute paths (not relative)
For each phase (tasks NA through ND):
Task NA: Mark in_progress, read <!-- START_PHASE_N --> from design, mark completed
Task NB: Mark in_progress, dispatch morphe:codebase-investigator, review findings, mark completed
Task NC: Mark in_progress, research external deps if needed (or mark completed with "N/A"), mark completed
Write complete tasks with exact paths and code based on investigator and research findings
If interactive mode: Output complete phase plan, use AskUserQuestion for approval
Task ND: Mark in_progress, write to absolute path in task description, mark completed
For each task in the plan:
Exact file paths with line numbers for modifications
Complete code - zero TODOs, zero unresolved questions in comments
Every code example runs immediately without implementation decisions
If code references helpers/utilities, prior task creates them
Exact commands with expected output
No conditional instructions ("if exists", "if needed")
Finalization (after all phase ND tasks completed):
Mark Finalization task as in_progress
Dispatch morphe:code-reviewer to validate plan against design
Fix ALL issues including Minor ones
Re-run morphe:code-reviewer until APPROVED with zero issues
Mark Finalization task as completed
Proceed to Test Requirements
Test Requirements (after Finalization):
Mark Test Requirements task as in_progress
Dispatch Opus subagent to generate test requirements from Acceptance Criteria
If interactive mode: Present to user, use AskUserQuestion for approval
If batch mode: Write directly without asking
Write test-requirements.md to PLAN_DIR
Mark Test Requirements task as completed
Proceed to execution handoff
Plan Validation (Finalization Task)
This is a tracked task: "Finalization: Run morphe:code-reviewer over all phase files, fix ALL issues including minor ones"
After all phase D tasks are completed, mark the Finalization task as in_progress.
Step 1: Dispatch morphe:code-reviewer
<invoke name="Task">
<parameter name="subagent_type">morphe:code-reviewer</parameter>
<parameter name="description">Validating implementation plan against design</parameter>
<parameter name="prompt">
Review the implementation plan for completeness and alignment with the design.
DESIGN_PLAN: [path to design plan, e.g., .techne/tasks/YYYY-MM-DD-feature.md]
IMPLEMENTATION_GUIDANCE: [absolute path to .techne/implementation-plan-guidance.md, or "None" if file does not exist]
IMPLEMENTATION_PHASES:
- [path to phase_01.md]
- [path to phase_02.md]
- [... all phase files]
SCRATCHPAD_DIR: [absolute path to session-isolated temp directory, e.g., /tmp/plan-2025-01-24-feature-a7f3b2/]
If IMPLEMENTATION_GUIDANCE is not "None", read it first and apply any project-specific
review criteria, coding standards, or quality gates it specifies in addition to the
standard review checklist.
**Session isolation:** Write any scratch files (notes, intermediate analysis, etc.) to
SCRATCHPAD_DIR, not to shared temp locations. This prevents collisions with parallel sessions.
Evaluate:
1. **Coverage**: Does the implementation plan cover ALL requirements from the design?
- Check each design phase maps to implementation tasks
- Check each "Done when" criteria has corresponding verification
- Check each component mentioned in design has implementation tasks
2. **Gaps**: Are there any missing pieces?
- Functionality mentioned in design but not in implementation
- Tests specified in design but missing from implementation tasks
- Dependencies or setup steps not accounted for
3. **Alignment**: Does the implementation approach match the design?
- Architecture decisions followed
- File paths consistent with design
- Subcomponent structure matches design phases
4. **Executability**: Can each phase be executed independently?
- Dependencies between tasks are explicit
- No forward references to code that doesn't exist yet
- Each phase ends with verifiable state
Report:
- GAPS: [list any missing coverage]
- MISALIGNMENTS: [list any divergence from design]
- ISSUES: [Critical/Important/Minor issues in the plan itself]
- ASSESSMENT: APPROVED / NEEDS_REVISION
</parameter>
</invoke>
Step 2: Fix ALL issues (including minor ones)
CRITICAL: You MUST fix ALL issues, including Minor ones.
Do NOT rationalize skipping minor issues. Do NOT mark Finalization as completed until ALL issues are resolved.
If reviewer returns NEEDS_REVISION or reports ANY issues:
Create a task for EACH issue (survives compaction):
TaskCreate: "Finalization fix [Critical]: <VERBATIM issue description from reviewer>"
TaskCreate: "Finalization fix [Important]: <VERBATIM issue description from reviewer>"
TaskCreate: "Finalization fix [Minor]: <VERBATIM issue description from reviewer>"
...one task per issue...
TaskCreate: "Finalization: Re-review after fixes"
TaskUpdate: set "Re-review" blocked by all fix tasks
Copy issue descriptions VERBATIM, even if long. After compaction, the task description is all that remains — it must contain the full issue details to understand what to fix.
Review the gaps, misalignments, and issues identified
Fix ALL of them - Critical, Important, AND Minor
Update the relevant phase files
Mark each fix task complete as you address it
Re-run morphe:code-reviewer validation
If more issues found, create new individual fix tasks and repeat
Mark "Re-review" complete when zero issues
Common rationalizations to REJECT:
"Minor issues can be fixed during execution" - NO. Fix them now.
"This minor issue is just a style preference" - NO. Fix it.
"We can address this later" - NO. The task says "fix ALL issues including minor ones."
Step 3: Complete finalization
Only when morphe:code-reviewer returns APPROVED with zero issues:
Mark the Finalization task as completed.
Proceed to Test Requirements generation.
Test Requirements Generation
Tracked task: "Test Requirements: Generate test-requirements.md from Acceptance Criteria"
Mark in_progress after Finalization completes.
Test requirements map acceptance criteria to specific automated tests, and identify criteria requiring human verification. The morphe:test-analyst agent uses this during execution to validate coverage.
Step 1: Generate via subagent
<invoke name="Task">
<parameter name="subagent_type">morphe:opus-general-purpose</parameter>
<parameter name="description">Generating test requirements from Acceptance Criteria</parameter>
<parameter name="prompt">
Read the design at [DESIGN_PATH] and implementation phases in [PLAN_DIR].
Generate test-requirements.md mapping each acceptance criterion to:
- Automated tests: criterion, test type (unit/integration/e2e), expected test file path
- Human verification: criteria that can't be automated, with justification and verification approach
Rationalize against implementation decisions made during planning. Every acceptance criterion must map to either an automated test or documented human verification.
</parameter>
</invoke>
Step 2: Handle based on review mode
Interactive mode: Present to user, AskUserQuestion for approval. This is the LAST interactive item.
Batch mode: Write directly, announce completion.
If user requests revisions in interactive mode:
Create a task for EACH revision (survives compaction):
TaskCreate: "Test requirements fix: <VERBATIM revision request from user>"
...one task per revision...
TaskCreate: "Test requirements: Re-present for approval"
TaskUpdate: set "Re-present" blocked by all fix tasks
Copy revision requests VERBATIM, even if long. After compaction, the task description must contain the full details.
Address each revision, marking tasks complete as you go
Re-present for approval
Repeat until approved
Step 3: Write and complete
Write to [PLAN_DIR]/test-requirements.md. Mark task completed. Proceed to execution handoff.
Execution Handoff
After Test Requirements generation completes, announce:
"Implementation plan complete and validated. Saved to [count] phase files + test-requirements.md in .techne/tasks/YYYY-MM-DD-<feature-name>/. The first phase file is <full-path>. Test requirements are in <full-path>/test-requirements.md."