| description | Create, update, review, and execute manual Markdown implementation plans when harness planning mode is not being used. Use when the user asks for a plan file, manual plan, implementation plan, execution plan, roadmap, task checklist, planning document, or agent-maintained plan with statuses, validations, milestones, approval gates, and cleanup steps. |
Manual Planning
Use this skill to produce Markdown plans that another coding agent can execute without reinterpreting the original conversation. Keep plans stable, explicit, and easy to update mechanically.
Default Location
Create the plan in docs/ when that directory exists. Otherwise create it at the repository root.
Use a descriptive kebab-case filename such as docs/payment-refactor-plan.md or manual-plan.md. Avoid temporary names like notes.md, scratch.md, or todo.md.
Plan Creation Workflow
- Gather enough repository context to identify scope, dependencies, test surfaces, and likely risks.
- Draft the plan as a Markdown file using one of:
assets/simple-plan-template.md for 10 or fewer tasks.
assets/milestoned-plan-template.md for more than 10 tasks.
- Set
Plan Status to QUESTIONS PENDING if clarification is required, then surface all clarifying questions to the user. Put the same unresolved questions in the plan under Open Questions.
- Incorporate the answers, then self-check the whole plan before requesting final approval.
- Set
Plan Status to READY FOR APPROVAL only when the self-check passes and the only remaining gate is user approval.
Do not begin implementation until the user approves the plan, unless the user explicitly asks to proceed without approval.
Open Question Handling
Open questions are not plan-only notes. When clarification is needed, actively ask the user before marking the plan READY FOR APPROVAL.
Use this order:
- Use the native question-asking tool (e.g.
question, ask-user, request-input, or equivalent tool exposed by the current harness). This is the primary and preferred method — always prefer a structured tool over plain text.
- If no native question-asking tool is available, send a concise formatted message in the conversation as a fallback.
- Record both the question and the user's answer in the plan's
Open Questions section.
- After the user answers, update
Open Questions with the resolved answer or replace the section with None.
Ask only questions that affect correctness, scope, risk, validation, sequencing, or user approval. Do not ask questions whose answers can be discovered from the repository or safely handled as explicit assumptions.
All open questions must be answered before the plan can transition to READY FOR APPROVAL. Unanswered questions block approval.
Fallback message format (only when no tool is available):
I drafted the plan, but need these clarifications before it is ready for approval:
1. [Question]
2. [Question]
Do not combine unresolved clarifying questions and final approval in the same user prompt. Ask for final approval only after the questions are answered and the self-check passes.
Plan State Lifecycle
Treat Plan Status in the metadata block as the authoritative plan-level state.
Use this lifecycle unless the user explicitly asks for a different one:
DRAFT while creating the first version.
QUESTIONS PENDING while waiting for required clarification.
READY FOR APPROVAL after clarification is incorporated and self-check passes.
APPROVED after the user approves execution.
IN PROGRESS while implementation is underway.
COMPLETED after cleanup and final verification pass.
Use BLOCKED when implementation or planning cannot continue. Record the blocker in Open Questions, task notes, or milestone notes as appropriate.
Plan Format Rules
Every plan must include:
- Title and metadata block.
- Goal, scope, and non-goals.
- Current status.
- Assumptions and open questions.
- Task list, optionally grouped by milestones.
- Validation command/check for every task.
- Cleanup phase after implementation.
- Final verification section.
- Approval gate.
Use exactly these task statuses:
TO BE DONE
IN PROGRESS
COMPLETED
BLOCKED
SKIPPED
Use exactly these plan statuses:
DRAFT
QUESTIONS PENDING
READY FOR APPROVAL
APPROVED
IN PROGRESS
COMPLETED
BLOCKED
If there are more than 10 tasks, group tasks into milestones. Each milestone must have a status and exit criteria. If there are 10 or fewer tasks, omit milestones unless they clarify independent delivery phases.
Task Rules
Each task must be concrete enough for an agent to execute from the plan alone.
Each task must include:
Status: one of the task statuses.
Objective: the observable outcome.
Steps: one or more concrete implementation steps.
Validation: commands, tests, inspections, or self-checks that prove completion.
Notes: constraints, dependencies, or affected files when known.
Prefer validation that can be run deterministically, such as a unit test, integration test, build command, linter, rendered artifact check, or exact file inspection. If deterministic validation is impossible, state the manual self-check in observable terms.
Milestone Rules
Each milestone must include:
Status: one of the task statuses.
Purpose: why the group exists.
Exit Criteria: observable conditions that prove the milestone is complete.
- Tasks owned by the milestone.
Milestone exit criteria must be broader than a single task validation. They should confirm that the completed tasks work together and that the next milestone can safely start.
Implementation Workflow
When executing a manual plan:
- Set the plan status to
IN PROGRESS before starting implementation.
- Before starting a task, update that task to
IN PROGRESS.
- Complete the task.
- Run the task validation.
- Fix issues until validation passes or mark the task
BLOCKED with a reason.
- Immediately update the task status to
COMPLETED after validation passes.
- Update the milestone status when all tasks in the milestone satisfy its exit criteria.
- Start the next task only after the plan file reflects the current state.
The plan file is the execution ledger. Keep it accurate before moving forward.
Cleanup Phase
Every plan must include a cleanup task near the end. It must remove intermediate artifacts that should not ship, including temporary documentation, one-off test cases, scratch scripts, temporary fixtures, generated data, debug logs, local-only outputs, and obsolete plan fragments.
Do not remove artifacts that the user asked to keep, artifacts required for future maintainability, or generated files that are part of the repository contract.
If the plan delivers a user-facing feature, bug fix, or behavior change, the cleanup phase must create or update a changelog entry (e.g. append to CHANGELOG.md or the project's latest-changelog file) summarizing what changed.
Self-Check Before Approval
Before asking for final approval, verify:
- The plan location follows the default location rule.
- The plan status is
READY FOR APPROVAL.
- Scope, non-goals, and assumptions are explicit.
- All open questions have been asked via the native question-asking tool (or chat fallback if no tool exists), answered by the user, and recorded in the plan
- Zero unanswered questions remain
- Every task has concrete steps and validation.
- More than 10 tasks are grouped into milestones.
- Every milestone has exit criteria when milestones exist.
- Cleanup and final verification are included.
- The plan avoids vague actions like "improve", "handle errors", or "write tests" without concrete targets.
- The plan can be executed by a coding agent without reading the original conversation.
Record the self-check result inside the plan before asking for approval. If any item fails, keep the plan out of READY FOR APPROVAL.
Resources
Copy and adapt one template into the target repository plan file:
assets/simple-plan-template.md for plans with 10 or fewer tasks.
assets/milestoned-plan-template.md for plans with more than 10 tasks.