| name | doccraft-queue-audit |
| description | Reconcile the dependency graph, pick-next queue, and backlog status across docs/stories/, docs/queue.md, and docs/backlog.md. Use after adding or editing a story (especially one with depends_on), after reshuffling priorities, or when the user asks "what can I work on next", "what's unblocked", "sanity-check the queue", "check my story dependencies", "fix the queue order", or "what parallel work is ready". In Agent mode (the tool can write files), apply objective mechanical fixes in the same turn and report what changed; in Ask / read-only mode, emit a proposal instead. Stop and report — never guess — on directed cycles, unknown depends_on ids, duplicate ids, or ambiguous editorial reorders. |
Managed by doccraft — doccraft update regenerates this file. Local edits will be overwritten. See doccraft.json to override project-specific vocabulary and paths without touching this file.
doccraft — queue, dependency audit, and parallel waves
When to use
- After adding a story, changing
depends_on / id, or
reshuffling priorities and you want a sanity check on docs/queue.md.
- The user asks "what can I work on next", "what's unblocked",
"sanity-check the queue", or similar pick-next / dependency questions.
- The user asks for parallel-ready batches ("what can I run in
parallel?") — see Parallel waves below.
- The user pastes the suggested follow-up block from
doccraft-story.
Not for: authoring a new story (use doccraft-story), recording a
decision (use doccraft-adr), or proposing artifacts from a chat thread
(use doccraft-session-wrap).
Configuration
Read doccraft.yaml at invocation. Every key below has a default in the
rest of this body so a missing config file is a soft fallback, not an error.
Relevant keys:
docsDir — root folder for all docs. Default: docs. Stories, queue,
and backlog are at {docsDir}/stories/, {docsDir}/queue.md,
{docsDir}/backlog.md.
queue.tables.suggestedOrder, queue.tables.platformSpikes — the
heading text this skill uses to find the two tables in the queue file.
Defaults: Suggested order, Platform spikes. Rename in config if
your project uses different headings; the skill matches on heading
text, not row position.
story.id.pattern — regex for valid story ids. Used when listing
unknown-id errors and when normalising obvious typos.
queueAudit.laneFrom — tag-prefix priority list for the lane
heuristic in the parallel-waves pass. Default: [area, slice]. Set
to [slice, area] for projects that group work primarily by product
surface.
queueAudit.scale.maxStoryFiles, queueAudit.scale.maxQueueReorderPct
— thresholds that trigger stop-and-confirm in Agent mode. Defaults:
5, 50. See Containment below.
What this skill reads and writes
Reads:
docs/stories/*.md — YAML frontmatter (id, status, impact,
urgency, depends_on, tags, openspec, roadmap_ref, optional
openspec_change).
docs/queue.md — the Suggested order table, plus Platform spikes
when parallel waves are in scope.
docs/backlog.md — the Story files table and the Status column.
Writes (Agent mode only, on objective fixes):
docs/queue.md — reorder rows; drop rows for shipped stories.
docs/backlog.md — update the Status column.
docs/stories/*.md — narrow YAML edits (see Auto-apply rule 4).
Input
The user may paste a one- to three-line briefing (what changed, optional
scope). If they omit it, infer from the repo: read every file under
docs/stories/ (skip README.md) and docs/queue.md.
Mode: propose vs apply
Two behaviours, controlled by the environment — not by user enthusiasm:
- Apply (Agent mode). The tool can write files. Treat the audit as
read + fix — apply objective mechanical fixes in the same turn, then
report what changed. See Auto-apply below.
- Propose (Ask / read-only mode). The tool cannot write files. Emit a
diff-style proposal plus the same issues list; do not suggest commits.
The user copies anything they want applied into a follow-up turn.
If the environment is Ask mode, do not write files even when the user
asks you to — emit a proposal they can apply themselves.
Auto-apply (Agent mode)
Apply in the same turn when the fix is objective — a rule-based
reconciliation that any auditor would make the same way:
- Stale suggested-order rows. A story linked from Suggested order
has
status: done but still appears in the pick-next table: remove
that row and renumber subsequent rows. Optionally backfill a new
bottom row from the next obvious pick in the same band (main vs.
platform spikes).
- Backlog status drift. For a
roadmap_ref whose story file is
status: done, if the matching Status cell in docs/backlog.md
still reads planned or equivalent, update it to the project's
established "done" phrasing. Do not mark done in the backlog when
the story is still todo or in_progress.
- Queue order vs
depends_on. For each id Q in Suggested
order, if some prerequisite d is not done and does not appear
above Q: reorder rows minimally until the rule holds, or move
Q below every unfinished d. Prefer moving blocked work down
over reshuffling the whole table.
- Flat urgency/impact inversions — narrow scope. Only when a story
with
urgency: later sits above a story with urgency: now in the
same band and no depends_on justifies the order: update urgency
on the lower-urgency story (users tend to understate, not
overstate). If the inversion is not flat — if there is any
ambiguity — list it under Remaining proposals instead of
editing.
Containment
- Scale threshold. If the audit would touch more than 5 story
files or reorder more than half the Suggested order rows,
stop and report the full plan first, then wait for the user to
confirm. Large changes should be a human decision.
- Working-tree awareness. If the user has uncommitted changes in
docs/queue.md, docs/backlog.md, or any story file you would
touch, report the planned changes first and let the user decide.
Do not overwrite in-progress work.
- Commits. Do not create commits unless the user asks. Describe
what changed so they can commit in their preferred grouping. When
the user does ask to commit, prefer one commit per file class
(queue, backlog, stories) over one mega-commit — easier to review
and revert. If the project uses conventional commits,
docs(queue):
/ docs(backlog): / docs(stories): scopes are natural.
Stop and report (no edit)
Do not guess through these — list them clearly and let the user decide:
depends_on references an unknown id. List the offending story
and the dangling id. Fix only obvious typos that restore a known id
(e.g. P0-3 → P0.3) and say you did.
- Directed cycle. List the cycle (
A → B → A). Do not delete edges
to break it — the user must choose which edge is wrong.
- Duplicate
id. Two stories claim the same id. Flag; do not
rename either.
- Ambiguous editorial reorder. Multiple valid orderings satisfy
the constraints. Summarise the options (e.g. "put P0.2 before P0.5
because impact:H, or after because urgency:soon"); do not pick.
Fields consulted
See doccraft-story for the full frontmatter contract. For the audit,
the fields that matter are:
id — node id in the graph; must be unique across stories.
depends_on — directed edges. Each entry must match another story's
id or an explicit backlog row; unknown ids are errors.
status — done nodes satisfy prerequisites; todo / in_progress
nodes remain scheduling candidates.
impact / urgency — tie-breakers once dependency constraints are
satisfied.
roadmap_ref — ties the story to its docs/backlog.md row for the
backlog-drift check.
Graph checks
- Build directed edges. For each story
S and each d in
depends_on, add edge d → S ("d is a prerequisite of S";
complete d before scheduling S).
- Unknown id.
depends_on references an id with no story and no
clear backlog row: list as an error.
- Cycles. If the
d → S graph has a directed cycle, list it.
- Open subgraph. Among stories with
status ≠ done, the
sources (no unfinished prerequisites) are natural "start next"
candidates.
Queue checks
Precedence: when story urgency and depends_on disagree,
unfinished prerequisites win unless the queue row explicitly
documents accepted debt in its Notes column.
- Parse the Suggested order table in
docs/queue.md. Story links
and id labels appear in the first column.
- For each queued row with id
Q, every d in depends_on must
either be done or appear above Q (or be explicitly
accepted as parallel work — call that out).
- Flag any row whose story is
done but still listed.
Output format
- Summary. Graph health (ok / issues) and whether auto-apply ran.
- Issues. Unknown ids, cycles, duplicate ids, queue-order
violations that remain after fixes.
- Changes applied. Bullet list — which files, what moved (row
numbers / backlog rows / frontmatter fields). If nothing changed,
say None.
- Remaining proposals. Subjective reorders, new rows, or
depends_on edges inferred from story bodies but not in YAML —
leave here when they are not unambiguous enough for auto-apply.
- Exit. If the graph and queue are clean and the backlog matches
shipped stories, say so in one line.
How to think about the queue
When reordering by hand or reviewing an auto-apply, keep these rules
in mind — they are the implicit contract the skill enforces:
- Read frontmatter. For each candidate story, read
impact,
urgency, depends_on. Read story bodies for chains not yet in
YAML and add depends_on when a chain is stable.
- Order. Higher
urgency and impact usually move up, but
depends_on can override: prerequisites should be done or appear
above this story. If urgency and depends_on disagree,
unfinished prerequisites win unless debt is documented.
- Keep stories honest. If the table order implies new urgency on
a story, update the story YAML in the same change — otherwise the
table and frontmatter drift apart and the next audit will thrash.
- Backlog. When a row ships or is dropped, update the Status
column for that id in
docs/backlog.md. New queued items need a
story file and a row in the backlog's Story files table.
- Planned-tier coverage. Every
planned row in
docs/backlog.md should have a matching file under
docs/stories/ and an entry in the Story files table.
Reconcile periodically.
Parallel waves (optional pass)
Run this only when the user explicitly asks for parallel-ready batches
("what can I run in parallel", "parallel waves", "what's unblocked").
It does not run as part of every audit — it is a second pass.
Preconditions. Run the graph / queue checks first and surface any
errors before proposing waves. Do not propose waves on top of a broken
graph.
Queue parsing.
- Extract story
id from the link text (e.g. [P4.7]), not the
filename.
- Preserve row order within each table; lower position = higher
priority in the main table.
- Default scope: only stories whose
id appears in the main
Suggested order table.
- Include Platform spikes only when the user asks. "Spikes only"
restricts candidates to that table.
Readiness.
- A prerequisite
d is satisfied when the story with id: d has
status: done. If d does not match any story file, treat as
blocked and list under Problems — do not assume done.
- A story is ready when
status is todo or in_progress,
every prerequisite is satisfied, and its id is in the active
scope.
Batching rules.
- Intra-batch dependency rule. No two stories in the same batch
may share a
depends_on edge (mutual or one-way).
- Lane heuristic. From
tags, take the first area:*, else
slice:*, else lane: misc. Prefer batches where each lane
appears at most once — reduces merge conflicts. If that drops too
many ready items, note "merge risk: duplicate lane …" and offer a
smaller batch or a second wave.
- Wave ordering. Sort ready candidates by (1) main-table row
order, then (2)
impact H > M > L, then (3) urgency now > soon
later.
- Token discipline. Default proposal focuses on the top 3–6
ready items unless the user asks for a full scan.
OpenSpec gate. If the project uses OpenSpec, stories carry
openspec: not-needed | recommended | required:
required — flag prominently. User should complete their OpenSpec
propose flow before heavy implementation. Link openspec_change
when set.
recommended — one line: "OpenSpec recommended if scope is fuzzy."
not-needed — no mention needed.
Proposal output. For each candidate story, emit a compact row:
id, title, status, lane (area/slice), openspec
- Prerequisites — list
depends_on with target status
- Link —
docs/stories/<file>.md
- Batch id (Wave 1, Wave 2, …)
End with a short Problems list when any id is missing, cyclic, or
blocked.
Optional follow-up template
Use when something cannot be auto-fixed (cycles, ambiguous priority)
or when the user should re-run with narrower scope:
Invoke doccraft-queue-audit.
[Context, e.g. "Break cycle P3.2 ↔ P3.4 by removing depends_on X
from story Y."]
[Optional: "Re-check queue only." | "Parallel waves only."]
References
docs/queue.md — pick-next tables.
docs/backlog.md — full P-tier tables and Status column.
doccraft-story — field contract for story frontmatter.
Project-specific vocabulary (tiers, area/slice tags, queue-table
headings, scale thresholds) lives in doccraft.yaml — the
Configuration section above lists the keys this skill reads. The
tables in this body are defaults used when no config is present.