Skip to main content

critical-risk-manager

Use this skill when building or reviewing a bow tie risk assessment, defining a critical risk, assessing control (barrier) assurance, or scoring residual risk for NZ/AU workplace hazards. Triggers on "bow tie", "bowtie", "critical risk", "control assurance", "barrier", "top event", "barrier analysis", "threat", "consequence", "risk matrix", "residual risk", "escalation factor", "critical control". Builds the structured visual risk story for high-energy / fatal-risk hazards — crane lifts, confined space, working at height, chemical handling, traffic/mobile plant, electrical, dropped objects. Grounded in HSWA 2015 (NZ) and the WHS model law (AU). Use the bow tie structure here before starting any bow tie.

Ir para a instalação

Informações da origem

Repositório
scottmss/hse-nz-au-skills
Última atividade na origem
2 de julho de 2026 às 02:05
Idioma detectado do SKILL.md
inglês
Estrelas
0
Forks
1

Opções de instalação

Por padrão, está selecionado o prompt que primeiro revisa a origem. Você pode mudar para um comando direto ou baixar uma cópia local.

Revise os arquivos de origem

Leia o SKILL.md e os arquivos complementares exibidos pelo SkillsMP antes de decidir se vai instalar.