Sync Task Statuses With Reality
This skill reconciles the local task graph against what actually happened: which branches have open pull requests, which worktrees are live, which work has already landed on main. Tasks drift out of sync whenever work happens outside the tasks lifecycle — a PR merges without tasks complete, a worktree gets abandoned, a dependency is discovered mid-implementation but never wired into the graph. This skill walks the evidence and repairs the graph so the task statuses mean something again.
The governing rule: every status change here must be evidence-based. PR state, worktree presence, and merged diffs are evidence. A hunch is not. When you change a task's status, record a progress note explaining the evidence that justified it.
Step 1: Sync main safely
You want local main to match origin/main before judging what has landed.
git fetch origin
git rev-parse --abbrev-ref HEAD
git status --short
Fast-forward main only when it is safe:
- If the current branch is not
main, do not switch and pull blindly. Fetch is enough — compare against origin/main directly (git log --oneline main..origin/main) and note that you left the working branch untouched.
- If the working tree is dirty, do not touch the branch. Note the dirty state in the report and proceed with
origin/main as your reference point.
- If you are on a clean
main, fast-forward: git merge --ff-only origin/main. If the fast-forward is rejected, main has diverged — report that and stop touching the branch rather than forcing it.
From here on, treat origin/main as ground truth for "what has landed."
Step 2: Reconcile statuses against open pull requests
gh pr list --state open --json number,headRefName,isDraft,title,url
For each open PR, find the task whose branch matches the PR head (tasks with-branch <headRefName>):
- PR is open and not a draft: the task should be
in-review. If it is currently in-progress or earlier, move it: tasks update <id> --status in-review.
- PR is a draft: the task should be
in-progress, not in-review. A draft PR is work-in-progress, not work-awaiting-review.
Prefer tasks pr --sync when it is available — it pulls GitHub state and applies the in-review transition for the current branch's PR for you. Use the manual mapping above for tasks that are not on the current branch.
Step 3: Reconcile against live worktrees
git worktree list --porcelain
Task worktrees live at tmp/worktrees/tasks/<task-id>. For each worktree under that path, resolve the task (tasks get <id>):
- Worktree exists, branch exists, but no open or merged PR for that branch: the task is genuinely
in-progress. If it is sitting in draft or ready, move it to in-progress.
- Worktree exists but the task already shows
in-review or completed (it has a PR): leave the status as the PR evidence dictates — the worktree alone does not downgrade it.
A live worktree with no PR is the signal that work has started but not yet been published for review.
Step 4: Reconcile against recently merged pull requests
gh pr list --state merged --limit 30 --json number,headRefName,title,mergedAt,url
For each merged PR, find the matching task. Before completing it, verify the work actually landed (Step 5 covers partial cases). When the merged diff fully delivers the task's described scope:
tasks complete <id>
tasks complete accepts several IDs at once and leaves already-completed tasks untouched, so it is safe to batch the genuinely-done ones.
Step 5: Partial-completion detection
A merged PR does not always finish the task it was attached to. Before marking anything completed, compare the task's described scope (read it: tasks get <id>, and read its plan file if it has one) against what the merged diff actually delivered (gh pr view <number> --json title,body and gh pr diff <number>).
Judge "partial" concretely:
- The task description lists three deliverables; the diff implements two. Partial.
- The task says "add the endpoint and tests"; the diff adds the endpoint with no tests. Partial.
- The PR body itself says "follow-up to come" or "deferring X to a later PR." Partial — and the PR author told you what is missing.
When a task is only partially delivered, do not complete it. Instead:
- Create a follow-up task capturing exactly the remaining work, with enough detail to action later:
tasks create --title "<remaining work>" --description "Remaining from <original-id> / PR #<n>: <what is still missing>" --priority <1-3>.
- Link it where a dependency genuinely exists:
tasks blockers add <follow-up-id> <prerequisite-id>.
- Decide the original task's fate on evidence: if the merged slice is a coherent, shippable unit and the follow-up captures the rest, complete the original and let the follow-up carry the remainder. If the merge left the original's core deliverable unfinished, keep the original
in-progress and record why.
Record a progress note on whichever task you touched, naming the PR and the gap you found.
Step 6: Dependency-graph sweep
Walk the graph and verify blocker edges reflect reality.
tasks list
For each task, read its description for dependency language — "depends on", "blocked by", "once ... exists", "after we ship", "prerequisite", "gated on". When a task carries that language but has no corresponding blocker edge, the graph is lying. Verify the current wiring with tasks blocked-by <id> (what blocks this task) and tasks blocking <id> (what this task blocks), then repair:
tasks blockers add <blocked-id> <blocker-id>
Conversely, if a blocker edge points at an already-completed task, that edge is satisfied and no longer constrains the dependent — note it, but the CLI's computed blocked field already accounts for blocker status, so you usually do not need to remove it.
Step 7: Report what changed
Summarize, grouped:
- Status transitions applied, each with the evidence (PR #, worktree path, or merged diff) that justified it.
- Follow-up tasks created for partial completions, with the gap each one captures and any blocker edge added.
- Dependency edges added during the graph sweep.
- Anything left deliberately untouched — a dirty working tree that blocked the
main fast-forward, a diverged branch, an ambiguous partial-completion you want the user to adjudicate.
If nothing needed to change, say so explicitly so the user knows the graph was checked, not skipped.
Gotcha
Never guess a status. If you cannot point to a PR state, a worktree, or a merged diff, do not change the task — surface the uncertainty in the report and let the user decide. And every status change gets a progress note (tasks progress add <id> --message "...") recording the evidence, so the next sync has a trail to follow.