Task Decomposition
Strong runs front-load understanding and commit to a sequence. Weak runs start editing in the first minute and discover the real shape of the task by breaking things. Spend the first 10–20% of the task here.
1. Restate the goal as an acceptance test
One or two sentences: "Done means ___ works / passes / renders." If you can't state it, you don't understand the task — reread the request; if genuinely ambiguous on a decision the user owns, ask ONE batched set of questions now (not a drip mid-task). Ambiguity you can resolve from the code is yours to resolve, not the user's.
2. Read the terrain before planning the route
Before proposing steps:
- Read the project instructions (CLAUDE.md) for constraints that override defaults.
- Find and read every file you expect to edit, plus one caller/consumer of each — the blast radius is defined by callers.
- Find the existing pattern for this kind of change (the last similar feature/commit) and plan to imitate it, not invent.
3. Write the step list, dependency-ordered
3–8 concrete steps, each independently verifiable, ordered so the build stays green as long as possible (types/schemas first, then implementations, then call sites, then UI). For each step note: files touched + how you'll verify it.
Track it visibly (todo list) if 3+ steps; mark steps done as you complete them, exactly one in-progress at a time.
4. Identify the risky step and de-risk it first
One step usually carries the real uncertainty (the unfamiliar API, the migration, the concurrency). Do a cheap probe of THAT step early — a spike, a dry run, a one-file prototype — before investing in the safe steps. Discovering step 5 is impossible after finishing steps 1–4 is the expensive failure.
5. Re-plan on surprise, don't push through
When reality contradicts the plan (an API doesn't exist, a test reveals a hidden coupling, a file is generated), STOP editing. Update the plan explicitly: what changed, which steps die, which are added. Pushing the original plan through contradicting evidence is how half-finished hybrid states happen. If the surprise changes the scope the user asked for, surface it instead of silently redefining the task.
6. Keep a ledger on long tasks
For work spanning many steps or likely to hit context limits: maintain a short state file (scratchpad) with — goal, decisions made + why, steps done, steps remaining, current blockers. Update it at each milestone. It is cheap insurance against context loss and drift.
Exit condition
The task is done when the step list is empty AND the acceptance test from step 1 passes — verified, not assumed (see pre-done-review).