Skip to main content
在 Manus 中运行任何 Skill
一键导入
GitHub 仓库

agentic-pm-kit

agentic-pm-kit 收录了来自 Agentic-Engineering-Agency 的 40 个 skills,并提供仓库级职业覆盖和站内 skill 详情页。

已收集 skills
40
Stars
2
更新
2026-04-22
Forks
0
职业覆盖
3 个职业分类 · 已分类 100%
仓库浏览

这个仓库中的 skills

brainstorming-lab
项目管理专家

Route the user to the right brainstorming strategy for their situation by matching their goal to a curated shortcut table or, when the goal is unclear, asking 3 diagnostic questions and recommending one or two strategies from the curated 20. Invoke when the user wants to brainstorm but has not yet chosen a technique.

2026-04-22
sprint-planning
项目管理专家

Facilitate a Scrum Sprint Planning event, producing a sprint goal and a committed Sprint Backlog drawn from the prioritized Product Backlog. Invoke when the team is about to begin a new sprint and needs to select and plan its work.

2026-04-21
wbs
项目管理专家

Construct a PMBOK-shaped Work Breakdown Structure from the project's epic-and-story hierarchy. Invoke when the team needs a deliverable-oriented decomposition of project scope into manageable work packages before building a schedule or assigning resources.

2026-04-21
charter
项目管理专家

Draft a PMBOK-shaped project charter from a concept memo or product brief. Invoke when the user needs a charter for initiation-phase documentation.

2026-04-21
closure-report
项目管理专家

Produce a PMBOK-shaped project closure report suitable for sponsor signature, consolidating charter, final schedule, final budget, retrospectives, post-mortems, and stakeholder acceptance records. Invoke when the project has reached final deliverable acceptance and requires formal closure documentation.

2026-04-21
communication-plan
项目管理专家

Produce a PMBOK-shaped communication matrix, escalation paths, and meeting cadence from a project charter and stakeholder register. Invoke when the team needs a formal plan governing how project information flows to each audience.

2026-04-21
cost-estimation
项目管理专家

Teach the team three complementary estimation techniques — Planning Poker, T-shirt sizing, and three-point (PERT) — and record the estimates the team produces for their own items. This is a human-led skill: the agent teaches and facilitates; the team estimates. Invoke when the team needs to estimate stories, epics, or tasks and wants a shared technique, or when an estimate is required for a planning gate.

2026-04-21
epics-and-stories
项目管理专家

Decompose a PRD into Epics and INVEST-shaped User Stories with acceptance criteria and priority. Invoke when the team has a baselined PRD and needs an actionable story backlog before sprint planning or WBS construction.

2026-04-21
post-mortem
项目管理专家

Facilitate a blameless post-mortem for a serious incident, near-miss, or project-level retrospective. Invoke when a failure significant enough to warrant system-level learning has occurred, or when an entire project closes and needs a final retrospective.

2026-04-21
prd
项目管理专家

Draft a simplified, PMBOK-compatible Product Requirements Document from a product brief and project charter. Invoke when the planning phase begins and the team needs a structured requirements baseline before decomposing scope into a WBS or epics.

2026-04-21
product-brief
项目管理专家

Draft a concise business-case document covering problem statement, target users, success metrics, key risks, and high-level approach. Invoke when the user needs a structured business case before or during project initiation.

2026-04-21
quality-plan
项目管理专家

Produce a concise quality plan defining quality objectives, measurable metrics, assurance activities, and control checkpoints for a project. Invoke when the team needs an explicit, agreed-upon quality standard before entering execution.

2026-04-21
resource-plan
项目管理专家

Produce a concise resource plan covering team roster, equipment, budget rollup, external dependencies, and hiring timeline for a project. Invoke when the team needs an explicit record of who, what, and how much is committed to the project.

2026-04-21
retrospective
项目管理专家

Facilitate a sprint or iteration retrospective that surfaces real learnings and produces owned, dated action items. Invoke when a sprint or iteration has closed and the team needs a structured inspect-and-adapt session.

2026-04-21
risk-matrix
项目管理专家

Produce a probability × impact risk matrix with PMBOK-style response strategies, derived from a project charter and optional stakeholder register or schedule. Invoke when the team needs a structured risk register before a planning gate, milestone review, or go/no-go decision.

2026-04-21
schedule-gantt
项目管理专家

Produce a Mermaid-Gantt schedule diagram and narrative schedule from a WBS and effort estimates. Invoke when the user needs a time-phased plan with task dependencies and critical path identification.

2026-04-21
sprint-review
项目管理专家

Facilitate a Scrum Sprint Review event, capturing what was built, stakeholder feedback from the demo, and decisions about the path forward. Invoke when the sprint has concluded and the team is ready to present its increment to stakeholders.

2026-04-21
stakeholder-register
项目管理专家

Identify, classify, and document project stakeholders by running a structured brainstorming strategy against the project charter, then emit a complete stakeholder register. Invoke when initiating a project or whenever the stakeholder landscape needs a systematic refresh.

2026-04-21
standup-prep
项目管理专家

Help the user prepare a concise three-bullet standup note covering yesterday, today, and blockers before walking into the Daily Scrum. Invoke when the user needs a ~2-minute prep session immediately before their standup meeting.

2026-04-21
story-execution
软件开发工程师

Facilitate the execution and review of a single user story through implementation, testing, and acceptance. Invoke when a developer or team is ready to begin work on a specific backlog story that has a code-producing component.

2026-04-21
brainstorming-alien-anthropologist
项目管理专家

Facilitate an Alien Anthropologist session in which the team examines their own project, processes, or user environment through the eyes of a completely uninitiated outside observer to surface hidden assumptions. Invoke when requirements elicitation, stakeholder onboarding, or user research is hampered by familiarity blindness.

2026-04-21
brainstorming-anti-solution
项目管理专家

Facilitate an Anti-Solution session that generates ways to make the problem worse or to guarantee failure, then inverts those findings to reveal overlooked solution paths. Invoke when the team is stuck on a single solution frame or when a pre-mortem or risk exercise needs creative expansion of the failure-mode list.

2026-04-21
brainstorming-assumption-reversal
项目管理专家

Facilitate an Assumption Reversal session that surfaces hidden constraints by inverting core beliefs about a challenge. Invoke when the user needs to break out of conventional solution space, challenge inherited design decisions, or stress-test a plan's underlying logic.

2026-04-21
brainstorming-brain-writing-round-robin
项目管理专家

Facilitate a Brain Writing Round Robin ideation session in which participants contribute silently and sequentially to build on each other's ideas. Invoke when the user needs inclusive idea generation from a distributed or mixed-participation team.

2026-04-21
brainstorming-chaos-engineering
项目管理专家

Facilitate a Chaos Engineering brainstorming session that stress-tests a project plan, system design, or process by deliberately hypothesizing worst-case failures to reveal hidden fragilities. Invoke when preparing a risk register, pre-mortem analysis, or resilience review before a critical milestone.

2026-04-21
brainstorming-constraint-mapping
项目管理专家

Facilitate a Constraint Mapping session that identifies, categorizes, and evaluates all constraints bearing on a project challenge to reveal viable solution pathways. Invoke when the user needs to distinguish real from imagined limitations, plan around blockers, or prioritize which constraints to address before execution begins.

2026-04-21
brainstorming-decision-tree-mapping
项目管理专家

Facilitate a Decision Tree Mapping session to visualize all paths, outcomes, and risks of a complex project decision before committing. Invoke when the user faces a multi-branch decision where each choice leads to distinct consequences and the full option space has not been charted.

2026-04-21
brainstorming-failure-analysis
项目管理专家

Facilitate a Failure Analysis session that systematically extracts lessons from past failures to prevent recurrence and improve current plans. Invoke when the user needs to learn from a project incident, a failed deliverable, a rejected milestone, or a repeated process breakdown.

2026-04-21
brainstorming-first-principles-thinking
项目管理专家

Facilitate a First Principles Thinking session that strips assumptions from a problem and rebuilds understanding from verified foundational truths. Invoke when the team is trapped in inherited constraints, over-specified solutions, or scope debates that cannot be resolved by incremental negotiation.

2026-04-21
brainstorming-mind-mapping
项目管理专家

Facilitate a Mind Mapping session to visually organize ideas radiating from a central concept, revealing connections and expanding the team's understanding of a topic or problem. Invoke when the user needs to structure an open-ended topic, generate hierarchically organized ideas, or capture a brainstorm before narrowing to solutions.

2026-04-21
brainstorming-morphological-analysis
项目管理专家

Facilitate a Morphological Analysis session to systematically explore all parameter combinations for a complex design or decision problem. Invoke when the user needs a comprehensive mapping of solution space across multiple independent dimensions.

2026-04-21
brainstorming-question-storming
项目管理专家

Facilitate a Question Storming session that generates a structured bank of questions before any solutions are proposed. Invoke when the user suspects the team is solving the wrong problem, needs to reframe a challenge, or lacks clarity on what is actually being asked.

2026-04-21
brainstorming-resource-constraints
项目管理专家

Facilitate a Resource Constraints ideation session to generate creative solutions under explicit budget, time, or capacity limitations. Invoke when the user needs to unlock innovative options in the face of a binding project constraint.

2026-04-21
brainstorming-reverse-brainstorming
项目管理专家

Facilitate a Reverse Brainstorming session to surface hidden risks and assumptions by deliberately ideating how to cause the problem, then inverting the results into solutions. Invoke when the user needs risk identification or creative problem-solving that conventional brainstorming has not produced.

2026-04-21
brainstorming-role-playing
项目管理专家

Facilitate a Role Playing ideation session to generate solutions and surface blind spots by viewing the project through multiple stakeholder perspectives. Invoke when the user needs empathy-based insight or a more complete view of who is affected by a project decision.

2026-04-21
brainstorming-six-thinking-hats
项目管理专家

Facilitate a Six Thinking Hats session to examine a project decision or proposal from six structured perspectives, preventing premature convergence and surfacing blind spots. Invoke when the team needs to evaluate a significant decision without collapsing into debate.

2026-04-21
brainstorming-solution-matrix
项目管理专家

Facilitate a Solution Matrix session to score and rank competing options against weighted criteria, producing a defensible, bias-reduced recommendation. Invoke when the user must choose among two or more alternatives and the decision requires structured multi-criteria evaluation.

2026-04-21
brainstorming-values-archaeology
项目管理专家

Facilitate a Values Archaeology session that excavates the unstated values and basic assumptions driving a team's or stakeholder's decisions. Invoke when stakeholder conflict, charter disagreements, or recurring scope disputes appear to stem from misaligned underlying priorities rather than factual differences.

2026-04-21
brainstorming-what-if-scenarios
项目管理专家

Facilitate a What If Scenarios session to explore plausible futures, stress-test plans, and surface contingency options. Invoke when the user needs to examine how the project would respond to changes in key assumptions about scope, schedule, budget, or environment.

2026-04-21
brainstorming-five-whys
项目管理专家管理分析师

Facilitate a Five Whys root-cause analysis. Invoke when the user needs to find the underlying cause of a project impediment, schedule slip, recurring defect, or stakeholder dissatisfaction signal.

2026-04-21