Skip to main content
在 Manus 中运行任何 Skill
一键导入
bienwithcode
GitHub 创作者资料

bienwithcode

按仓库查看 2 个 GitHub 仓库中的 11 个已收集 skills。

已收集 skills
11
仓库
2
更新
2026-07-26
仓库分布

Skills 分布在哪些仓库

按已收集 skill 数展示主要仓库,并显示它们在该创作者目录中的占比和职业覆盖。

仓库浏览

仓库与代表性 skills

plan
软件开发工程师

Use after the design phase is approved (proposal → spec → design complete). Translates the approved design into granular, ordered TDD task pairs — each behavioral task must have a failing test written before implementation. Each task must be completable in a single focused session.

2026-07-26
enforcer
软件开发工程师

Use when the agent starts a new turn or receives any request. This is the global methodology router — it MUST run before any other skill to determine the correct phase and enforce workflow discipline.

2026-07-25
grillme
软件开发工程师

Parameterized Socratic challenge engine. Runs BEFORE drafting an artifact (proposal | spec | design | tasks), loading the matching references/grills/<phase>-grill.md and challenging one question at a time. Records agreed resolutions in the target artifact's Challenge & Resolution Log. Toggled by workflow level (strict = on).

2026-07-25
brainstorm
软件开发工程师

DEPRECATED — do not use. The monolithic design phase has been split into three phase-gated 1:1 skills. Use `proposal` (scope), then `spec` (behavior), then `design` (architecture), each behind its own grill/review gate.

2026-07-25
new
软件开发工程师

Use when starting new work, a user provides a Jira key, or the enforcer routes to the initialization phase. Creates an SDLAIC change with full context from Jira and codebase research.

2026-07-25
review
软件开发工程师

Parameterized auditor & gatekeeper engine. Runs AFTER an artifact is drafted (proposal | spec | design | tasks | code), loading the matching references/reviews/<phase>-audit.md in a clean subagent and issuing an APPROVE / REQUEST_CHANGES / REJECT verdict. Verdicts are persisted via `sdlaic gate set` — never inside the repo. For `code`, runs the two-pass compliance + quality review.

2026-07-25
design
软件开发工程师

Use to author design.md for a change — the Technical Architecture phase (Phase 2). Runs after an approved spec and an optional design grill, producing the architecture that satisfies the proposal and spec, then hands off to the review gate.

2026-07-25
spec
软件开发工程师

Use to author specs/<capability>/spec.md for a change — the Behavioral Requirements phase (Phase 1B). Runs after an approved proposal and an optional spec grill, producing formal GIVEN/WHEN/THEN scenarios, then hands off to the review gate.

2026-07-25
当前展示该仓库 Top 8 / 10 个已收集 skills。
已展示 2 / 2 个仓库
已展示全部仓库