Production Readiness Audit
The skill that answers the only question that matters before shipping: "Is every module actually production-ready — scored, proven, and fixed — or does it just look done?"
Real builds stall at ~70% because "done" is self-asserted. This skill replaces the assertion with a scored, looping, evidence-backed process: every module is rated 1–10 across five passes, every gap becomes a checklist item, agents fix the items, and the audit re-runs until every module scores 9+. Nothing is taken on faith — data is proven real, tenancy is proven isolated, every route/form/data-shape is proven working in a real browser against a real backend.
The Iron Law
EVERY MODULE SCORED 1–10. NOTHING SHIPS BELOW 9.
LOOP fix → re-audit UNTIL EVERY MODULE IS 9+.
NO LINT/TYPE SUPPRESSIONS — fix the root cause, never disable.
REAL SEED DATA + AN INITIAL PRODUCT USER. TENANCY PROVEN ISOLATED.
EVERY ROUTE, EVERY FORM, EVERY DATA SHAPE EXERCISED IN PLAYWRIGHT (FE + BE).
A 9 means: a paying user could rely on this module today. An 8 is not "almost there" — it is "not done", and it goes back into the loop.
When to use
- ✅ End of orchestrator Phase D, as the capstone gate before any "ready to ship" claim
- ✅ User asks to "rate each module 1–10", "check completeness", "complete it fully for production", "what's left to ship"
- ✅ Before a stakeholder/PM walkthrough where things must actually work
- ✅ After a brownfield→production migration, to prove nothing is still demo/mock
When NOT to use
- ❌ A single-component visual tweak (use
frontend-modular-architecture / design-review)
- ❌ Debugging one specific bug (use
systematic-debugging)
- ❌ A quick sanity check (this is the heavy iterative machinery — expect many agent dispatches and tokens)
How the orchestrator runs it
This runs after integration-tester, security-review-and-fix, and exploratory-qa have each produced their artifacts, and it subsumes and finalizes product-completeness-audit + brutal-exhaustive-audit into a single scored loop. The orchestrator (the main session) drives the loop; it reads .claude/memory/superdev-learned/ first and threads relevant lessons into every dispatch.
Preconditions the orchestrator verifies before scoring (a build cannot be rated if these are absent):
- Stack is up in production mode (
NEXT_PUBLIC_API_MODE=production / MAIL_PROVIDER/BILLING_PROVIDER set to real-or-env-switched), not demo mode.
- Seed data + an initial product user exist — dispatch
seed-data-architect first if not. The product must be usable on a fresh DB with a real owner/admin login, realistic volumes, and zero hardcoded fallbacks.
The five passes
Each pass scores every module 0–10 on one dimension and emits findings. The passes reuse superdev's existing specialist agents plus three readiness-specific agents. Run the scanning passes (1, 2, 5-static) in parallel; the browser passes (3, 4) need the stack up.
| # | Pass | Dimension | Agents |
|---|
| 1 | Completeness & wiring | Every route renders real data; every button/form/menu hits a real API; no placeholders, stubs, alert(), or demo-fallbacks on success paths | placeholder-hunter, route-completeness-checker, wiring-auditor, data-flow-real-vs-mock |
| 2 | Data realism & seed | Real seed data at realistic scale; an initial product (owner/admin) user that can log in; aggregate counts computed from the DB (never hardcoded 0); product works with demo mode OFF | seed-data-architect, data-flow-real-vs-mock |
| 3 | Tenancy isolation | With ≥2 seeded tenants, tenant A cannot read / list / search / export / mutate / enumerate tenant B's data via API or UI (IDOR on every :id, list scoping, search, webhooks). Any leak caps the module at ≤3. | tenancy-isolation-tester |
| 4 | End-to-end (Playwright) | Every route loads; every form validates → submits → persists (DB-verified) → re-renders; data-shape parity FE↔BE (no undefined in any view; contract == API == UI); happy + 13 edge categories | route-walker, qa-flow-tester, journey-walker, edge-case-prober, data-flow-tracer |
| 5 | Code quality & security | Zero lint errors and zero type errors with no suppressions (eslint-disable/@ts-ignore/as any/@phpstan-ignore); authz enforced (CASL/Policies), input validated, no secrets in code, no god-files. Any P0 security/data-loss caps the module at ≤3. | static-auditor, dependency-auditor, ui-auditor, module-structure-auditor |
See references/five-pass-audit.md for the exact dispatch prompts per pass.
Scoring — module readiness is the WEAKEST pass
module_score = min(pass1, pass2, pass3, pass4, pass5)
A module is only as production-ready as its weakest dimension — a beautiful, fully-wired UI with a tenancy leak is not an 8, it is a 3. Hard caps make disqualifying findings impossible to average away: a tenancy leak (Pass 3) or a P0 security/data-loss bug (Pass 5) caps the module at ≤3 no matter how good everything else is.
module-readiness-rater reads all five pass reports for a module and emits its score + the consolidated, fix-ordered checklist. The full rubric (what 9–10 vs 7–8 vs ≤6 means per dimension) is in references/rubric.md. The rubric defines 9–10 as "production-ready, at most cosmetic nits" so min is honest, not trivia-driven.
The loop (the heart of the skill)
round = 0
do:
round += 1
1. Run the five passes across all modules → per-module pass scores
2. module-readiness-rater → READINESS.md (per-module score + verdict)
and READINESS_CHECKLIST.md (every finding as a one-line, owned ticket)
3. Update COMPLETION_LEDGER.json: features.<module>.readiness_score, gates.readiness
4. If every module ≥ 9 → DONE, break.
5. For each module < 9: dispatch the matching fixer (backend/frontend/laravel/
inertia-module-builder, security-fixer) on THAT module's checklist items.
Fix the ROOT CAUSE. No suppressions. No new demo data.
6. Re-run ONLY the passes that scored < 9 for the fixed modules.
while (any module < 9 AND round < 5)
if any module still < 9 after round 5:
STOP. Surface READINESS_CHECKLIST.md with the blocking items to the user —
do not loop forever, and do not lower the bar.
The orchestrator dispatches; builders/fixers never chain. State lives in READINESS.md, READINESS_CHECKLIST.md, and COMPLETION_LEDGER.json — all on disk, so the loop survives context compaction. See references/readiness-checklist-format.md.
Hard requirements (non-negotiable, enforced by the passes)
- No suppressions. Pass 5 and the wave gate fail on any new
eslint-disable / @ts-ignore / @ts-expect-error / as any / as unknown as / @phpstan-ignore. The fix is the root cause, every time. A module with suppressions cannot exceed 7.
- Real seed + initial user. Pass 2 fails if the product needs demo mode to function, if there is no seedable owner/admin login, or if any aggregate (
*_count, totals) is hardcoded.
- Tenancy isolation. Pass 3 actively attacks cross-tenant boundaries; a single leak is a release blocker.
- Exhaustive Playwright. Pass 4 must touch every route and every form (not a sample) and DB-verify persistence; data-shape parity is checked on both sides of the wire.
Integration with the done-gate
This skill is how the completeness, qa, security, brutal, and readiness gates in COMPLETION_LEDGER.json reach pass. The Stop-hook done-gate (hooks/scripts/done-gate.sh) requires gates.readiness == pass and every features.<module>.readiness_score ≥ 9 before any completion claim is allowed. So this loop is not optional politeness — it is the only path to a legitimate "done". See ../prd-design-build-orchestrator/references/done-gate.md.
Completion gate
If any box is unchecked, the product is not ready and the done-gate will block the claim.
Reference files