| name | PE-9(1)_redundant-cabling |
| description | Employ redundant power cabling paths that are physically separated by [organization-defined]. |
| category | configuration |
| version | 5.2.0 |
| author | cyberstrike-official |
| tags | ["nist","sp800-53","rev5","pe-9-1","pe","enhancement"] |
| tech_stack | ["any"] |
| cwe_ids | [] |
| chains_with | [] |
| prerequisites | ["PE-9"] |
| severity_boost | {} |
PE-9(1) Redundant Cabling
Enhancement of: PE-9
High-Level Description
Family: Physical and Environmental Protection (PE)
Framework: NIST SP 800-53 Rev 5
Physically separate and redundant power cables ensure that power continues to flow in the event that one of the cables is cut or otherwise damaged.
What to Check
How to Test
Step 1: Review Documentation
Examine the System Security Plan (SSP) and related artifacts for PE-9(1) implementation details. Verify the organization has documented how this control is satisfied.
Step 2: Validate Implementation
# For cloud environments, use cloud-audit-mcp tools
# For on-premises, review system configurations directly
# Example: Check if account management policies exist
grep -r "account.management\|access.control" /etc/security/ 2>/dev/null
Step 3: Test Operating Effectiveness
Verify the control is actively functioning, not just documented. Check logs, configurations, and operational evidence.
Tools
| Tool | Purpose | Usage |
|---|
| Manual Review | Documentation and interview-based | N/A |
Remediation Guide
Control Statement
Employ redundant power cabling paths that are physically separated by [organization-defined].
Implementation Guidance
Physically separate and redundant power cables ensure that power continues to flow in the event that one of the cables is cut or otherwise damaged.
Risk Assessment
| Finding | Severity | Impact |
|---|
| PE-9(1) Redundant Cabling not implemented | Medium | Physical and Environmental Protection |
| PE-9(1) partially implemented | Low | Incomplete Physical and Environmental Protection |