Decompose ratified plan into vertical slices (SLICE-N)
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Decompose ratified plan into vertical slices (SLICE-N)
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
基于 SOC 职业分类
Install Pasture binaries (pastured, pasture, pasture-release) from GitHub Releases, go install, or Nix
Pasture protocol reference documentation — 12-phase workflow, agent roles, constraints, and coding standards. Read when you need to understand the full workflow or look up conventions.
Create handoff document and transfer to supervisor
Create PROPOSAL-N task with full technical plan
Ratify proposal, mark old proposals pasture:superseded
Spawn 3 axis-specific reviewers (A/B/C)
| name | supervisor-plan-tasks |
| description | Decompose ratified plan into vertical slices (SLICE-N) |
Command: pasture:supervisor:plan-tasks — Decompose ratified plan into vertical slices (SLICE-N)
Break RATIFIED_PLAN into vertical slice Implementation tasks for workers.
-> Full workflow in PROCESS.md <- Phase 8
Layer 0: Shared infrastructure (common types, enums — optional, parallel)
│
Vertical Slices (parallel, each worker owns one slice):
│
├─ Layer 1: Types for this slice (e.g. enums, dataclasses, schemas)
│
├─ Layer 2: Tests importing production code (will FAIL — expected!)
│
├─ ... (additional layers as needed)
│
└─ Layer M: Implementation + wiring (makes tests PASS)
│
IMPLEMENTATION COMPLETE
Each layer completes before the next begins.
Within a layer, all tasks run in parallel.
Key TDD principle:
Layer 2 tests will fail initially — this is expected.
Layer M workers implement code to make those tests pass.
L2 Test File Requirements:
1. Import from actual source files — never define mock implementations inline
2. Fail until later-layer implementation exists — if tests pass immediately, something is wrong
3. Test behavior via DI mocks — mock dependencies, not the code under test
4. Define expected API contracts — tests specify what the implementation should do
[sup-plan-impl-plan-decompose]
[sup-plan-ratified-plan-tasks]
[sup-plan-vertical-slice-define]
[sup-plan-validation-checklist]
[sup-plan-integration-points-identify]
[sup-plan-integration-points-include]
[sup-plan-interface-first]
[sup-plan-review-effort-budget]
Received handoff from architect with RATIFIED_PLAN task ID and placeholder IMPL_PLAN task.
At the start of Phase 8 — like the Phase-1 research-depth gate — request a configurable review-effort budget from the user (per C-review-effort-budget). This is one of the 5 user-gated phases. Present the default choices:
| Option | Meaning |
|---|---|
| 3 rounds | Up to three review -> fix -> re-review cycles per slice |
| 1 round | A single review + one fix pass |
| 0 rounds | No review-fix iteration (review once, surface anything found) |
| unlimited | Iterate until a fix-free clean 0/0/0 round (no upper bound) |
| custom | A user-specified number of rounds |
The Phase-10 review->fix->re-review loop iterates up to the chosen budget until a fix-free clean round confirms 0 BLOCKER + 0 IMPORTANT + 0 MINOR. On budget exhaustion WITHOUT a clean round, SURFACE the outstanding findings to the user for a decision — never proceed dirty, never loop forever, and never hardcode the budget. Record the chosen budget in the IMPL_PLAN so workers and reviewers know the bound.
ANTI-PATTERN (causes dual-export problem):
Task A: Layer 1 - types.go (all types)
Task B: Layer 2 - service_test.go (all tests)
Task C: Layer 3 - service.go (all implementation)
Task D: Layer 4 - CLI wiring
Problem: No worker owns full production code path → dual-export anti-pattern
CORRECT PATTERN:
SLICE-1: "feature list command" (Worker A owns full vertical)
- ListOptions, ListEntry types (L1)
- Tests importing `cli-tool feature list` CLI (L2)
- service.ListItems() implementation (L3)
- listCmd (cobra) RunE handler wiring (L3)
SLICE-2: "feature detail command" (Worker B owns full vertical)
- DetailView types (L1)
- Tests importing `cli-tool feature detail` CLI (L2)
- service.GetItemDetail() implementation (L3)
- detailCmd (cobra) RunE handler wiring (L3)
Read RATIFIED_PLAN and URD tasks:
bd show <ratified-plan-id>
bd show <urd-id>
Identify production code paths (what end users will actually run):
cli-tool feature, cli-tool feature list, cli-tool feature detailPOST /api/items, GET /api/items/:idsync-daemon, backup-daemonDecompose into vertical slices (one per production code path):
Identify shared infrastructure (optional Layer 0):
Identify horizontal Layer Integration Points (where slices must inter-op):
## Integration Points (example)
| ID | Contract | Owner (exports) | Consumer(s) (imports) | Merge Timing |
|----|----------|-----------------|-----------------------|--------------|
| IP-1 | PhaseEnum type | SLICE-1 (foundation) | SLICE-2, SLICE-3, SLICE-4 | L1 (types) |
| IP-2 | ConstraintContext interface | SLICE-1 (foundation) | SLICE-2 (gen_schema) | L1 (types) |
| IP-3 | SkillRegistry protocol | SLICE-3 (gen_skills) | SLICE-4 (context_injection) | L3 (impl) |
Interface-first decomposition (R3, Strong SHOULD — see C-interface-first-slices): when slices share contracts, prefer extracting a horizontal interface-first FOUNDATION slice that exports ALL public types/interfaces/contracts and lands FIRST (a barrier). The dependent implementation slices then compile against those contracts and run in parallel, instead of being forced into a linear A → B → C chain whose only real coupling is at the interface boundary. Reserve a linear chain for cases where the runtime dependency genuinely exceeds the interface.
Create vertical slice tasks:
bd create --type=task \
--labels="pasture:p9-impl:s9-slice" \
--title="SLICE-1: Implement 'cli-tool feature list' command (full vertical)" \
--description="$(cat <<'EOF'
---
references:
impl_plan: <impl-plan-task-id>
urd: <urd-task-id>
---
## Production Code Path
**End user runs:** `./bin/cli-tool feature list`
## Worker Owns (Full Vertical Slice)
Plan backwards from production code path:
1. End: CLI entry point `listCmd (cobra.Command) RunE handler`
2. Back: Service call `feature.NewService(deps).ListItems(opts)`
3. Back: Service method `ListItems(opts ListOptions) ([]ListEntry, error)`
4. Back: Types `ListOptions`, `ListEntry`
## Files You Own (Within These Files)
- pkg/feature/types.go (ListOptions, ListEntry ONLY)
- cmd/feature/list_test.go (import actual CLI)
- pkg/feature/service.go (ListItems method ONLY)
- cmd/feature/list.go (list subcommand wiring ONLY)
## Implementation Order (Layers Within Your Slice)
**Layer 1: Types** (your slice only)
- Create ListOptions, ListEntry
- Do NOT add types for other slices (e.g., DetailView)
**Layer 2: Tests** (importing production code)
- Import actual CLI: `import "myproject/cmd/feature"`
- Test the actual command users will run
- Tests will FAIL - expected, no implementation yet
**Layer 3: Implementation + Wiring**
- Implement service.ListItems() method
- Wire cobra command with feature.NewService(realDeps)
- No TODO placeholders
- Tests should now PASS
## Validation
Before marking complete:
- [ ] Production code verified via code inspection (no TODOs, real deps wired)
- [ ] Tests import actual CLI (not test-only export)
- [ ] No dual-export anti-pattern
- [ ] No TODO placeholders
- [ ] Service wired with real dependencies
EOF
)" \
--design='{
"productionCodePath": "cli-tool feature list",
"validation_checklist": [
"Type checking passes",
"Tests pass",
"Production code verified via code inspection",
"Tests import production CLI package",
"No TODO placeholders in CLI action",
"Service wired with real dependencies"
],
"acceptance_criteria": [{
"given": "user runs cli-tool feature list",
"when": "command executes",
"then": "shows list from actual service",
"should_not": "have dual-export (test vs production paths)"
}],
"ratified_plan": "<ratified-plan-id>"
}'
bd dep add <impl-plan-id> --blocked-by <slice-task-id>
Update IMPL_PLAN with vertical slice breakdown + integration points:
bd update <impl-plan-id> --description="$(cat <<'EOF'
---
references:
request: <request-task-id>
urd: <urd-task-id>
proposal: <ratified-proposal-id>
---
## Vertical Slice Decomposition
Each worker owns ONE production code path (full vertical slice from CLI → service → types).
### Shared Infrastructure (Layer 0 - optional)
- Common types: SortOrder, OutputFormat, ErrorCode enums
- Implemented first, parallel
### Vertical Slices (parallel, after Layer 0)
**SLICE-1: "cli-tool feature" (default command)**
- Worker: A
- Production path: `./bin/cli-tool feature`
- Owns: default action, recent items logic
- Task: aura-xxx
**SLICE-2: "cli-tool feature list"**
- Worker: B
- Production path: `./bin/cli-tool feature list`
- Owns: ListOptions types, list tests, listItems() method, list CLI wiring
- Task: aura-yyy
**SLICE-3: "cli-tool feature detail"**
- Worker: C
- Production path: `./bin/cli-tool feature detail <id>`
- Owns: DetailView types, detail tests, getItemDetail() method, detail CLI wiring
- Task: aura-zzz
**SLICE-4: "cli-tool feature search"**
- Worker: D
- Production path: `./bin/cli-tool feature search`
- Owns: SearchQuery types, search tests, searchItems() method, search CLI wiring
- Task: aura-www
## Horizontal Layer Integration Points
Where slices must inter-op. Merge sooner, not later — divergence grows with delay.
| ID | Contract | Owner (exports) | Consumer(s) (imports) | Merge Timing |
|----|----------|-----------------|-----------------------|--------------|
| IP-1 | FeatureError enum | SLICE-1 | SLICE-2, SLICE-3, SLICE-4 | L1 (types) |
| IP-2 | BaseService interface | SLICE-1 | SLICE-2, SLICE-3 | L1 (types) |
## Execution Order
1. Layer 0 (if needed): Shared infrastructure (parallel)
2. SLICE-1 through SLICE-4: Each worker implements their vertical slice (parallel)
- Within each slice: Types (L1) → Tests (L2) → Impl+Wiring (L3)
3. Integration points merge at documented timing (L1 contracts first, L3 wiring last)
## Validation
All production code paths verified via code inspection:
- ./bin/cli-tool feature
- ./bin/cli-tool feature list
- ./bin/cli-tool feature detail <id>
- ./bin/cli-tool feature search
- All integration points verified: contracts match between owner and consumers
EOF
)"
{
"slice": "feature-list",
"productionCodePath": "cli-tool feature list",
"taskId": "aura-xxx",
"workerOwns": {
"endPoint": "listCmd (cobra.Command) RunE handler",
"types": ["ListOptions", "ListEntry"],
"tests": ["cmd/feature/list_test.go"],
"implementation": [
"(*FeatureService).ListItems() method",
"listCmd wired with feature.NewService(realDeps)"
]
},
"planningApproach": "Backwards from production code path",
"validation_checklist": [
"Type checking passes",
"Tests pass",
"Production code works: ./bin/aura sessions list",
"Tests import production CLI (not test-only export)",
"No TODO placeholders",
"Service wired with real dependencies"
],
"acceptance_criteria": [{
"given": "user runs aura sessions list",
"when": "command executes",
"then": "shows session list from actual service",
"should_not": "have dual-export or TODO placeholders"
}],
"ratified_plan": "<ratified-plan-id>",
"urd": "<urd-id>"
}
Each worker implements their slice in layers (TDD approach):
Worker A's Slice: "aura sessions list"
Layer 1: Types (ListOptions, SessionListEntry only)
Layer 2: Tests (import sessions package, test list action)
→ Tests will FAIL (expected - no impl yet)
Layer 3: Implementation + Wiring
- (*SessionsService).ListSessions() method
- listCmd wired with sessions.NewService(deps)
- Wire action to call service
→ Tests should now PASS
Important: Layer 2 tests failing is expected. Worker knows tests define the contract, implementation comes in Layer 3.
Red flags (horizontal layer decomposition):
Green flags (vertical slice decomposition):
If multiple slices share common infrastructure:
Layer 0 Tasks (parallel, implemented first):
- Common enums: SortOrder, OutputFormat, SessionsErrorCode
- Common types: ParseHealth (used by all slices)
- Shared utilities: isSidechainSession(), getGitBranch()
Then vertical slices proceed in parallel, depending on Layer 0.
Key insight: Shared infrastructure is the exception, not the rule. Most types/logic belong to specific slices.
When planning for a follow-up epic (after receiving h1 from architect post-FOLLOWUP_PROPOSAL ratification), the same vertical slice decomposition applies:
# Create FOLLOWUP_IMPL_PLAN
bd create --type=epic --priority=2 \
--labels="pasture:p8-impl:s8-plan" \
--title="FOLLOWUP_IMPL_PLAN: <follow-up feature>" \
--description="---
references:
followup_epic: <followup-epic-id>
original_request: <request-task-id>
original_urd: <urd-task-id>
followup_urd: <followup-urd-id>
followup_proposal: <followup-proposal-id>
---
Vertical slice decomposition for follow-up epic."
# Create FOLLOWUP_SLICE-N with DEFER'd-item leaf tasks
bd create --type=task \
--labels="pasture:p9-impl:s9-slice" \
--title="FOLLOWUP_SLICE-1: <description>" \
--description="---
references:
followup_impl_plan: <followup-impl-plan-id>
followup_urd: <followup-urd-id>
---
## DEFER'd-Item Leaf Tasks
| Leaf Task ID | Source UAT | DEFER'd Item | Description |
|---|---|---|---|
| <leaf-id-1> | <uat-id> | <deferred-item-id> | <description> |
| <leaf-id-2> | <uat-id> | <deferred-item-id> | <description> |
## Specification
<detailed spec>
## Validation Checklist
- [ ] All DEFER'd-item leaf tasks resolved
- [ ] Tests pass
- [ ] Production code path verified"
# Wire dual-parent: leaf blocks BOTH the DEFER'd-items tracking group AND the follow-up slice
bd dep add <followup-slice-id> --blocked-by <leaf-task-id-1>
bd dep add <followup-slice-id> --blocked-by <leaf-task-id-2>