Skip to main content

aposd-optimizing-critical-paths

Optimize performance through mandatory measure-first workflow with 3 stages: MEASURE (gate) -> FUNDAMENTAL FIX -> CRITICAL PATH REDESIGN. Use when code is too slow, laggy, hangs, doesn't scale, has timeouts, OOM errors, or high CPU/memory. Emphasize that simpler code usually runs faster. Triggers on: performance issues, optimization needed, takes forever, profiling. Produces profiling-backed optimization with verified improvement.

跳到安装

来源信息

仓库
diegosouzapw/awesome-omni-skill
最近来源活动
2026年3月2日 06:27
检测到的 SKILL.md 语言
英语
星标
50
分支
19

安装方式

默认使用会先检查来源的 Prompt;你也可以切换为直接命令,或下载本地副本。

检查来源文件

决定是否安装前,请先阅读 SKILL.md,以及 SkillsMP 当前展示的配套文件。