一键导入
planning
Start here to structure a non-trivial change into a high-level, phased plan with dependencies, risks, and an explicit out-of-scope boundary.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Start here to structure a non-trivial change into a high-level, phased plan with dependencies, risks, and an explicit out-of-scope boundary.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
Guides stable API and interface design. Use when designing APIs, module boundaries, or any public interface. Use when creating REST or GraphQL endpoints, defining type contracts between modules, or establishing boundaries between frontend and backend.
Guides systematic root-cause debugging. Use when tests fail, builds break, behavior doesn't match expectations, or you encounter any unexpected error. Use when you need a systematic approach to finding and fixing the root cause rather than guessing.
Start here to ship built-and-tested code to its target safely — release steps, rollout, smoke checks, and rollback.
Start here to settle how a non-trivial change will be built — interfaces, contracts, file-level structure, and trade-offs.
Records decisions and documentation. Use when making architectural decisions, changing public APIs, shipping features, or when you need to record context that future engineers and agents will need to understand the codebase.
Start here to document what shipped — READMEs, API docs, ADRs, and usage — once a feature lands or an interface changes.
基于 SOC 职业分类
| name | planning |
| description | Start here to structure a non-trivial change into a high-level, phased plan with dependencies, risks, and an explicit out-of-scope boundary. |
| context | fork |
| agent | project-manager |
Turn the goal into structure. Gather enough codebase context to understand the terrain, then break the work into a small number of high-level phases.
Stay high-level — leave exact files, signatures, and verify commands out. Ship the plan after the first draft; iterate during execution, not during planning.
out_of_scope list. This is a hard constraint, not a suggestion. You own it: every downstream phase inherits it verbatim.Prefer the smallest plan that delivers the goal. If the work needs more than ~5 phases, it's two plans, not one.