| description | Plan and estimate a development task using an additive, component-based point system (Fibonacci base points per item type + risk factors). Produces a decomposed estimate, an hours range, a t-shirt size, and a list of the difficulties/risks that drive the cost. Also runs calibration: comparing an estimate against the real worklogs once a task is done, and proposing tweaks to the points table. Use when the user wants to estimate, plan, size, or score a task, asks "how long will this take", "cuánto va a costar", "estimemos esto", "puntuá esta tarea", "planificación", or wants to review why a task overran its estimate.
|
| argument-hint | [Jira key, e.g. ETP-4033, or a free-text task description] |
/estimate — Task Planning & Estimation
Arguments: $ARGUMENTS (optional: a Jira issue key like ETP-4033, or a free-text description of the work)
This skill sizes a task by decomposing it into components, scoring each component with base
points, applying risk factors, and converting the total into an hours range. The goal is not
just a number — it is to surface where the difficulty lives before the work starts.
The scoring model is data, not logic. All point values, risk factors, and the points→hours
ratio live in points-table.md (next to this file). Always read it at runtime — never
hardcode values from this document. To tune the model, edit that file; this skill stays stable.
Step 1 — Load the task
Step 2 — Read the model
Read points-table.md in this skill folder. It defines:
- Base item types with Fibonacci point values.
- Risk factors with additive percentages.
- The points → hours ratio and the t-shirt size bands.
Step 3 — Decompose into components
Break the task into concrete pieces of work and map each to a base item type from the table.
Be explicit — a "build a window" task is usually 5–8 separate items (list view, header form, lines
grid, modals, generation logic, handler, tests, i18n). Missing components is the #1 cause of
under-estimation (see the ETP-4033 anchor in the calibration log).
If a piece of work has no matching item type, pick the closest one and flag it — that is a
signal the table needs a new row. Register it now (Step 3.6), don't just propose it.
Step 3.6 — Grow the model (register new item/risk types as you find them)
The table is meant to keep growing. Whenever this estimate surfaces something the model doesn't
yet capture, write it back so future estimates inherit it — the skill self-populates, it doesn't wait
for a post-mortem.
Trigger this step when, during decomposition, you hit any of:
- A new item type — a recurring unit of work with no close-enough row (e.g. a kind of modal,
generator, layout, or backend hook the table doesn't list).
- A new risk or discount factor — a cost/saving driver not in §2 / §2b (e.g. a new quality gate,
a new reuse mechanism the platform provides).
- A new whole-task archetype — a recognizable shape of task (e.g. "adapt-existing-window",
"first-of-a-family", "loose-issues-bundle") worth naming for future calibration.
What to do:
- Add the row to
points-table.md in the right section. For a new item type, assign a Fibonacci
value by analogy to its nearest neighbours (state the analogy). For a factor, give a % range. Keep
the row generic — describe the casuistry, never the specific ticket.
- Log a one-line note in
calibration-log.md under a "Model growth" running list: what was added,
why, and that the value is provisional (no actual yet) so a later calibration can confirm it.
- Tell the user what you added, inline in the estimate output ("added
<row> = N pts — new").
Discipline: only register things that are reusable across tasks. A one-off quirk of this ticket
is not a new row — fold it into the closest existing item and mention it. New values start
provisional and get confirmed/adjusted by real worklogs in Step 6. Don't silently overwrite an
existing row's number during an estimate — that's a calibration decision (Step 6), which needs the
user's OK.
Step 3.5 — Reuse audit (run BEFORE you lock the points)
The biggest estimation errors here are not arithmetic — they are mis-classifying what already
exists as new work. For every component, ask these questions and downgrade/exclude accordingly.
This is what keeps a "mejorar una ventana" task from being scored like "build a window".
- Does the field/column already exist? A field the ticket says to "add" is often already in the
AD schema (a child tab, a standard column). Check
schema-raw.json / the artifact. If it exists,
it's surface-existing-field (1), not a new column or alter-db.
- Does a native process already do this behaviour? Posting/Complete already gives accounting
inversion, payment-schedule, VAT, and balance/paid-state effects for free (NEO reuses the classic
chain). Callouts, display-logic, and combo validation rules are reused too. If so → reuse (0 pts /
wire-native-process-button), not a java-handler. (See the reuse warning in points-table.md.)
- Is this the 2nd+ implementation of a pattern a sibling task built? If a prior/sibling ticket
already built the framework (same feature on another window), this is copy-with-deltas → apply the
second-mover-reuse discount. The first such task carries the framework cost; the rest don't.
- Does another ticket own this piece? A cross-window dependency can remove scope: if the
generating action/popup/handler lives in a sibling ticket, score it 0 here and say so. (The
cross-window-dependency risk and a scope exclusion are different things — apply whichever is true.)
- Is it a display convention, not a backend change? "Show the total negative", "hide the
indicator" are
list-display-rule (1) tweaks, not backend sign logic.
- Is it "suppress/extend something that exists" vs "build new"? Conditioning an existing popup or
branching an existing component is
suppress-existing-behavior / extend-shared-component, far
below the from-scratch row.
- Where did each item come from? Tag each as ticket description vs functional/design doc
vs pure technical analysis. Analysis-only items are usually prerequisites to verify (do the
doc types exist?) — don't pad the estimate with speculative build work, and don't silently drop a
requirement that only the design doc states.
Adapting an existing window is strictly less than building a new one — the platform compresses
everything toward config (decisions.json), but the relative ordering still holds. If your numbers
say otherwise, re-run this audit.
Step 4 — Identify risk factors and reuse discounts
Go through the risk factors (§2) AND the reuse/discount factors (§2b) in the table and mark every one
that applies, with a one-line justification. Both are additive percentages applied once to the
base sum (they do not compound); discounts are negative and the net factor is floored (see §3). Be
honest in both directions:
- The factors that historically blow up estimates: shared-component refactors (SonarQube/
architecture checks), cross-window dependencies, late-discovered functional bugs, CI quality gates.
- The factors that historically make estimators over-shoot: scoring native-process reuse as new
backend, and ignoring the second-mover discount on the 2nd+ implementation of a pattern.
Step 5 — Compute and present
base_points = Σ (item base points)
risk_uplift = Σ (applicable risk percentages) # e.g. +30% + +20% = +50%
total_points = base_points × (1 + risk_uplift)
hours = total_points × HOURS_PER_POINT # from points-table.md
Present the estimate as:
- Component breakdown — a table: item | base points | note.
- Risk factors — a table: factor | +% | why it applies.
- Total — base points, risk uplift, total points, hours range, t-shirt size.
- Top difficulties — 2–4 bullets naming what will likely be hard or slow, derived from the
heaviest components and the active risk factors. This is the most valuable output.
- Comparison — if the task had an existing estimate, state the delta and why they differ.
- Model changes — if Step 3.6 registered any new item/risk/archetype, list them here ("added
<row> = N pts, provisional") so the user sees the model grew this run.
Keep numbers honest. If the scope is fuzzy, give a range (e.g. "18–26 pts") rather than false
precision, and say what would tighten it.
Step 6 — Calibration (when a task is DONE)
When the user asks to review a finished task (or "why did X overrun"), do the reverse:
- Fetch the real worklogs and the original estimate:
rtk proxy curl -s -u "$JIRA_LOGIN:$JIRA_API_TOKEN" \
"https://etendoproject.atlassian.net/rest/api/3/issue/<KEY>/worklog" -H "Accept: application/json"
rtk proxy curl -s -u "$JIRA_LOGIN:$JIRA_API_TOKEN" \
"https://etendoproject.atlassian.net/rest/api/3/issue/<KEY>?fields=timeoriginalestimate,timespent&expand=changelog" -H "Accept: application/json"
($JIRA_LOGIN = the login in ~/.config/.jira/.config.yml; $JIRA_API_TOKEN from env.)
- Read each worklog comment and classify where the time went (new feature vs. rework vs. CI/quality
gates vs. analysis).
- Identify the real difficulties — under-counted components, risk factors that materialized,
and any new failure mode not yet in the table.
- Append a calibration entry to
calibration-log.md (estimate vs. actual, what was missed).
- Propose concrete table tweaks to
points-table.md (e.g. "raise invoice-generation from 5 to
8", "add a ci-quality-gates risk factor"). Apply them only with the user's OK — the table is
shared and committed.
- Confirm provisional rows. Check the "Model growth" list in
calibration-log.md for rows added
during estimation (Step 3.6) that this finished task exercised. Now that you have a real actual,
mark each as confirmed (keep / adjust the value) and move the note from provisional to a real
calibration finding.
Output discipline
- Versioned content is English (repo policy); conversation with the user may be Spanish.
- Never invent point values — read them from
points-table.md.
- The estimate is a tool for conversation, not a contract. Always pair the number with the
difficulties that justify it.