Skip to main content
在 Manus 中运行任何 Skill
一键导入
GitHub 仓库

planr

planr 收录了来自 instructa 的 10 个 skills,并提供仓库级职业覆盖和站内 skill 详情页。

已收集 skills
10
Stars
43
更新
2026-07-17
Forks
10
职业覆盖
3 个职业分类 · 已分类 100%
仓库浏览

这个仓库中的 skills

planr-loop
其他计算机职业

Drive one feature or scope to verified completion without per-step human prompting. Use when the user says build until done, loop on this, or finish autonomously. Sequences plan, map, work, live verification, and independent review until the map is clean and evidence proves the feature actually runs.

2026-07-17
planr-verify-web
软件开发工程师

Live verification for web features. Use when a web map item needs proof it actually runs in a browser before review, including planr-loop step 4. Discovers the host's existing browser capability, runs the changed flow against the dev server, and logs replayable evidence. Ships no browser tooling of its own.

2026-07-11
planr-goal
其他计算机职业

Prepare a long-running goal for autonomous execution on Planr. Use when the user states a broad goal, wants to start a /goal run, or asks to set up a goal. Compiles intent into a checked plan, a linked map, and a durable goal contract, then prints the starter command for the host's loop driver without implementing anything.

2026-07-06
planr-plan
其他计算机职业

Create or refine Planr product plans and build plans before implementation. Use for app ideas, PRDs, architecture slices, scoped implementation contracts, and converting broad work into map-ready items.

2026-07-06
planr-work
软件开发工程师

Execute one Planr map item to evidence-backed completion. Use after a task has been picked or when the next step is implementation, docs, tests, scripts, integration work, or a fix item.

2026-07-06
planr-review
软件开发工程师

Review a Planr item or scoped implementation against map state, plan acceptance criteria, logs, changed files, and verification evidence. Use for findings-first audits and review gates.

2026-07-05
planr-task-graph
软件开发工程师

Use Planr as the live local task graph for coding-agent coordination. Trigger when work needs project planning, build-plan splitting, map creation, dependency links, picking, log-backed closure, review gates, handoff context, interruption recovery, or multi-client coordination.

2026-07-04
planr-status
项目管理专家

Report honest Planr project, map, item, or review state without implementing changes. Use when the user asks what is done, what remains, what is blocked, what is ready, or what should be picked next.

2026-06-10
planr
其他计算机职业

Single entry point for all Planr work. Use for any product, feature, fix, status, review, or summary request when the user has not named a specific Planr skill. Routes to the right Planr skill from live map state so the user never has to remember skill names.

2026-06-10
planr-summary
软件开发工程师

Summarize a Planr scope after work, review, or status inspection. Use when the user wants what changed, why, what works now, verification evidence, and what remains.

2026-06-10