verify-a5
Verify adoption criterion A5 (Workflow Integration) in the current project. Reports fulfillment level 0–3.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
菜单
Verify adoption criterion A5 (Workflow Integration) in the current project. Reports fulfillment level 0–3.
用 Codex 或 Claude 帮你安装 复制这段 Prompt,粘贴到 Codex、Claude 或其他助手里,让它检查 Skill 页面并帮你完成安装。
| name | verify-a5 |
| description | Verify adoption criterion A5 (Workflow Integration) in the current project. Reports fulfillment level 0–3. |
| allowed-tools | Bash Read |
| Level | Description |
|---|---|
| 0 | Agents are used in isolation; all handoffs (PRs, reviews, CI, deployments) are managed by humans |
| 1 | Agents assist with individual tasks but humans handle all handoffs; agent output is manually incorporated |
| 2 | Agents create pull requests with generated descriptions; agents observe CI results as part of their workflow |
| 3 | Agents are fully embedded: create PRs, post review comments, monitor CI, trigger and observe deployments |
CLAUDE.md, AGENTS.md, and skill files in .claude/skills/ for instructions to create pull requests.Gather the evidence described above and determine the fulfillment level for A5.
Scoring guide:
gh pr create), and/or CI MCP server access allows agents to observe pipeline results. Both conditions strengthen the evidence but either alone may qualify.Report in exactly this format:
A5 — Workflow Integration
Assess the Agent Readiness level of the current project across all 11 criteria (C1.1–C8.2) and produce a structured report with the achieved level, per-criterion scores, gaps, and recommendations.
Verify readiness criterion C1.1 (Codebase Accessibility) in the current project. Reports fulfillment level 0–2.
Verify readiness criterion C2.1 (Setup Automation) in the current project. Reports fulfillment level 0–3.
Verify readiness criterion C3.1 (Architecture Depth) in the current project. Reports fulfillment level 0–3.
Verify readiness criterion C5.1 (Runnability) in the current project. Reports fulfillment level 0–2.
Verify readiness criterion C5.2 (Unit Test Coverage) in the current project. Reports fulfillment level 0–3.